GLAST LAT ProjectFeb. 17, 2004 Hartmut Sadrozinski: TKR Flex Cables 1 TKR Flex Cable Issues addressed TKR Flex Cable Issues addressed Mechanical 1.Grid.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

Building a Pressure/Temperature Weather Station (Sensor Pack) AEM 1905, Fall 2008.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
LAT Design Integration1 GLAST LAT ProjectDecember 2003 LAT Planning Meeting December 10, 2003 Design Integration LAT Planning Meeting December 10, 2003.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST Large Area Telescope:
Setting up the Ricoh C305 Press F5 to start the Presentation
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
LATLAT CU Beam Test 3rd May GLAST Program CU Beam Test CU Integration Francesco Nicola
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectDOE/NASA Stratus Review, March 30 & 31, 2004 Systems Engineering 1 GLAST Large Area Telescope: Pat Hascall SLAC System Engineering Manager.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Electronic Parts & Materials.
GLAST LAT ProjectQuarterly Review, November 12, 2002 LAT-PR GLAST Large Area Telescope: Tracker Subsystem Robert Johnson Santa Cruz Institute for.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
Tracker Timing Margin MRB R.P. Johnson U.C. Santa Cruz October 15, 2004.
GLAST Large Area Telescope:
ACD in 2006 CERN beam test Here I am listing beam test ACD issues for discussion: ACD will be represented in CERN beam test instrument by minimum 4, and.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
1. Introduction and Overview
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Introduction and Overview
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectFeb. 17, 2004 Hartmut Sadrozinski: TKR Flex Cables 1 TKR Flex Cable Issues addressed TKR Flex Cable Issues addressed Mechanical 1.Grid – Flex Cable Interface 2.CTE mismatch Tower – Grid (introduce loop) 3.Cable – Wall interference: move resistors 1.Cactus arm resistors on wall side, all other on TEM side 4.Cable – TEM interface (take out loop) 5.Stiffener at D connectors (TEM side) see below 6.Assembly Procedure (NO pre-bend, but needs more meat) 7.Bend Tool for Cactus arms (existence proof only) Electrical 1.Doubling Vias 2.Via Stay-clear in Bend Area 3.Resistors to Improve GTRC margins (out) 4.Resistors to Improve Polyswitch Functioning (in)

GLAST LAT ProjectFeb. 17, 2004 Hartmut Sadrozinski: TKR Flex Cables 2 Docs for C0 Proto Flight Order LAT-DS Flex-circuit Cable Schematic Diagram LAT-DS Flex-circuit C-0 Mechanical Layout LAT-DS Tracker Tower Flex-circuit Cable C-0 Assembly LAT-DS Gerber Files for Flex-circuit C-0 LAT-DS TKR Flex cable Stiffener LAT-TD-xxxxAssembly Process for Proto-flight Tracker Flex Cable Nano Connectors Numbers to order 11 assembled, 3 bare: Assembled (8 + 1 spare) = 9 INFN for Tower Testing 2DAQ Bare (delivery when fab’d) : 3 SLAC

GLAST LAT ProjectFeb. 17, 2004 Hartmut Sadrozinski: TKR Flex Cables 3 To be Done To be Done Coordination: Jerry Clinton, Parts: Jeff Tice Mechanical Layout: Tim O ’ Heron, Electrical Layout: Dave Nelson 1.C0: 1.draw LAT doc number for Stiffener Gerber file, change dimensions in mech. Drawings 2.Make corrections in assembly drawing 3.Update “ Assembly Process ” with resistors, and RPJ comments 2.C1 – C7 Layout: Same Interface with Grid 1.Problem Area: C4-C5 Stay Clear on Top 3.Start PO for Flight Order now 1.Specs and SOW are signed – off, have ROM 4.Order Parts from “ Flex_cables_2_17 ” :

GLAST LAT ProjectFeb. 17, 2004 Hartmut Sadrozinski: TKR Flex Cables 4 Assembly Process Doc Assembly Process Doc Responsible: Jerry Clinton, Parts: Jeff Tice RPJ Message: should the drawing not specify the thermistor to be glued down and then potted? In flight cables we will also need to specify potting for the connectors and resistors (or maybe just a conformal coat for the latter). Should there not be a note on the drawing regarding the cure cycle for the film adhesive (done)? I would like to make it clear somehow that the film adhesive needs to extend under the metal wings of the connector, not just the main plastic body. This was not done so far at SLAC, but it is important if we are to be sure that the metal shells don't pop off. MaterialManufactureFunctionSupplier Item 1FM-73MCytec Engineered Materials Film Adhesive for nano connector to Flex Cable Vendor or SLAC Item 2EA-9394HysolEpoxy for potting of nano connector to Flex Cable Vendor or SLAC Item 3A8486Omnetics37 pin female nano connectorSLAC Item 4100 OhmState of the ArtResistor for flex cableSLAC Item 5200 OhmState of the ArtResistor for flex cableSLAC hartmut: Update with other parts: 39k , thermistor, stiffener(?), hartmut: Update with other parts: 39k , thermistor, stiffener(?),

GLAST LAT ProjectFeb. 17, 2004 Hartmut Sadrozinski: TKR Flex Cables 5 Way to TKR Flex Cable : Milestones 06/23/2003Start of my clock 08/26/2003PRR Readiness Review 10/27/2003TKR Interface Design Report 11/28/2003Original target for TKR IDD 01/23/2004New Layout Crew on board 02/10/2004Finalize interface GRID-TKR Flex cable C0 02/13/2004Finalize electrical layout cable C0 “You are here” 02/17/2004Is TKR IDD signed-off? 02/17/2004POStart Production of 14 non-flight C0 cables for INFN/DAQ 03/01/2004?All cables designed and laid out, ready for PRR 03/12/2004Tim O ’ Heron leaves 03/15/2004?Start Production of Short Cables ????? PRR,PO!Start Production of Flight Cables 03/15/2004?Flight connectors / Parts available ? 04/15/2004TKR Tower Test cables needed (C0)