Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.

Slides:



Advertisements
Similar presentations
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Advertisements

Zachary Wolf Undulator Tuning November 12, Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
Experience Report with the Alignment Diagnostic System Georg Gassner September 17 th 2010.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Undulator Alignment Strategy – April 20, 2006 Heinz-Dieter Nuhn, SLAC / LCLS FAC 1 Undulator Alignment Strategy Heinz-Dieter Nuhn,
Geoff Pile LCLS Fixed support IDR 12 th January 2006 LCLS Fixed Support IDR Introduction and History Are special fixed supports needed?
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
LCLS Undulators October 14, 2004 Heinz-Dieter Nuhn, SLAC / SSRL MMF Review Introduction to the LCLS Undulators Heinz-Dieter Nuhn,
Geoff Pile FAC: SUT Status & Plans 20 th / 21 st April 06 Single Undulator Test Status/Plans April 06 Geoff Pile.
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Systems.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
Physics Requirements – October 20, 2005 Heinz-Dieter Nuhn, SLAC / LCLS Internal LCLS Undulator Alignment and Motion Review 1 Physics.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Robert Ruland MMF Introduction, Schedule, Budget October 14, 2004 MMF Review 1 MMF Introduction, Schedule, Budget Robert Ruland.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
1 Heinz-Dieter Nuhn 1 BFW Results June 2009 FAC BFW Results Heinz-Dieter Nuhn – LCLS Undulator Group Leader June 9, 2009.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
Robert Ruland MMF Layout, Workflow October 14, 2004 MMF Review 1 MMF Layout, Workflow Robert Ruland Magnetic Measurements Facility.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
XFD – XF Engineering Group November 15-th, 2004LCLS Undulator Final Design Review1 Undulator for the LCLS project – from the prototype to the full scale.
J. Welch Talk MMF 10/14/04 LCLS Magnetic Measurement Facility Requirements Functional Temperature Vibration Earth's.
Zachary Wolf LCLS Undulator October 30, LCLS Undulator Tuning And Fiducialization Zack Wolf, Yurii Levashov, Achim.
Jose Chan FAC Review- LTU-DUMP Installation Status & 11/11/08 1 LTU-Dump Installation Status & Schedule.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
Zack Wolf BFW Fiducialization October 20, Beam Finder Wire (BFW) Fiducialization Zack Wolf, Dean Walters, James.
Zachary Wolf Undulator Oct 12, LCLS Undulator Tuning Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko,
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Catherine LeCocq, SLAC Alignment Plan for the LCLS Undulator IWAA 2006,1 Alignment Plan for the LCLS Undulator Catherine.
October 27-28, 2005 FAC Meeting Undulator Metrology Catherine LeCocq, SLAC 1 Undulator Metrology Catherine LeCocq, SLAC October.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
Magnetic Measurements At SLAC
Magnetic Measurements For The LCLS Undulator System
Undulator System Installation
LTU/Undulator Installation Status
Undulator Scope, Management, and Organization
e-Beams Systems Update
Electron Beam Systems ETC and Methodology
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Magnetic Measurements and Alignment at SLAC Robert Ruland & Zack Wolf
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
LCLS Undulator System Production Management
E-Beams Systems Manager
LTU/Undulator Installation Status
LCLS Undulator System Status and Schedule
Undulator Integration Test Status
Undulator Assembly and Installation Planning
LCLS e- Beams System Overview
Undulator Alignment Plan
Alignment Diagnostic System Status
Undulator Systems Integration
LCLS Undulator Scope, Management, Organization
Presentation transcript:

Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration with Catherine LeCocq, SLAC Metrology & Geoff Pile, ANL

Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 2 Outline Roles and Responsibilities ANL, SLAC Metrology, SLAC Undulator Assembly System Design & Requirements Assembly Plan Outline Facility Space Management Schedule Moving Forward

Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 3 SLAC Metrology ANL Areas of Expertise Working in Collaboration October 2005April 2006 SLAC Metrology ANL SLAC Assy & Install Collaboration requires trust. Trust requires effort.

Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 4 Collaboration Roles and Responsibilities (abridged) ANL Design the System and Sub-assemblies minus WPM/HLS Supply Designed Sub-assemblies Provide Expertise SLAC Metrology Design and Supply WPM/HLS System Develop and Test Fiducialization Procedures Provide Expertise SLAC Assembly & Installation Girder Assembly Plan System Installation Plan Material Handling and Storage Provide Expertise

Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 5 SLAC Assembly Supervisor Requisition posted Interviews are nearly complete An offer should be extended the week of April 24 th Responsibilities will include: Material handling and assembly planning and execution Assembly and QA documentation Space and personnel resource planning

Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 6 Undulator System Girder Assembly Field Installation Precise/Vacuum Assembly performed in a control environment

Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 7 Intra-girder Component Alignment PRD r3

Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 8 Girder Assembly Prerequisite All necessary components fiducialized Stands aligned in all staging areas Outside MMF (possibly in Building 750) following the SPEAR3 Approach as suggested by Richard M. Boyce Station 1 Prepare Girder: Mount CAM wedges under girder Station 2 Component Installation, part 1 roll-away slides, component supports HLS & WPM components undulator vacuum chamber Station 3 Component Installation, part 2 quadrupole, BFW and BPM Station 4 Wiring / Plumbing In the Controlled Environment of the MMF Station 1 Optical Alignment Station 2 CMM Storage LeCocq, Catherine, October 27-28, 2005, FAC Meeting, Slide 13

Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 9 Girder Assembly Flow

Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 10 Possible Assembly & Storage Spaces B033 - GLAST B006 – SSRL/ILC Requires Cleanout ($) B750 – Access may be limited by construction B081 - MMF

Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 11 SLAC Magnetic Measurement Facility Wolf, Zachary, LCLS Management Presentation, April 11, 2006, Slide 3 Floor plan divided into three functional areas Magnetic Measurements (± 0.1º C) Fiducialization and Assembly (± 1º C) Storage (± 2.5º C) Assembly Area Storage and Queuing LCLS-TN-04-1

Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 12 Undulator Magnet Storage All 40 undulator magnets could be stored in the MMF storage area.

Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 13 Component Delivery & Assembly Schedule

Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 14 Moving Forward Solidify Component Delivery Dates Refine Assembly Process with SUT Experience The activities and logic in the P3 assembly plan are reasonable. The resources assigned to the tasks are being reviewed. Secure Assembly and Storage Space Material handling equipment design and procurement is behind schedule Addition of SLAC Assembly Supervisor