Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 1 Diagnostics/Common Optics:

Slides:



Advertisements
Similar presentations
Research Opportunities at LCLS September 2011 Joachim Stöhr.
Advertisements

Tom Fornek LUSI 12 November 2008 SLAC National Accelerator Laboratory 1 LUSI Status Update Tom Fornek Project Manager.
John Arthur X-ray October 12, 2004 X-Ray Detector Program Status John Arthur.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Tom Fornek LUSI June 17, LUSI UPDATE – June, 2008.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
1 G. Haller 1 LUSI XCS FIDR June 17, 2009 XCS Photon Controls and Data Systems Gunther Haller XCS Instrument Final Instrument.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
Bingxin Yang High resolution effective K September 22-23, 2004 High-Resolution Effective K Measurements Using Spontaneous.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 LUSI Overview J. B. Hastings January 2007 Lehman Review Response to Lehman Review.
David Fritz LCLS FAC Meeting Oct. 30, X-ray Pump-Probe Instrument David Fritz Instrument Overview Instrument Layout System.
Aymeric Robert XCS 11/12/2008 SLAC National Accelerator Laboratory 1 X -ray C orrelation S pectroscopy Instrument Aymeric.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
1 Eliazar Ortiz 1 XCS Final Instrument Design Review – DCO June 18, 2009 Diagnostics & Common Optics LUSI WBS 1.5 Yiping Feng.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
Diagnostics & Common Optics LUSI WBS 1.5
John Arthur X-Ray Optics October 12, 2004 X-Ray Prototype Optics Specifications John Arthur.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
Sébastien Boutet LCLS FAC June Coherent X-Ray Imaging 1 LUSI Coherent X-ray Imaging Instrument Sébastien Boutet – CXI.
1 Eliazar Ortiz 1 Diagnostics/Common Optics: Priorities, Engineering June 9, 2009 Diagnostics/Common Optics: Priorities, Engineering.
Sébastien Boutet LCLS FAC Meeting Oct 30, 2007 Coherent X-ray Imaging1 Coherent X-ray Imaging Instrument Sébastien Boutet Coherent.
David Fritz XPP June 17, The X-ray Pump-Probe Instrument Instrument Scientist: David Fritz Second Scientist:
1 T. Fornek 1 LUSI CXI FIDR June 3, 2009 Thomas Fornek Project Manager June 3, 2009 LUSI Coherent X-Ray Imaging Instrument Final.
1 T. Fornek 1 LUSI XCS FIDR June 17, 2009 Thomas Fornek Project Manager June 17, 2009 LUSI X-Ray Correlation Spectroscopy Instrument.
1 G. Haller 1 LUSI CXI FIDR June 3, 2009 CXI Photon Controls and Data Systems Gunther Haller Coherent X-ray Imaging Instrument.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
1 Sébastien Boutet 1 Coherent X-ray Imaging Instrument FAC Meeting, June Coherent X-ray Imaging Instrument Sébastien Boutet.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
J. B. Hastings LUSI DOE Review July 23, 2007 X-ray Optics 1 X-ray Optics J. B. Hastings Beam definition Attenuators Slits Pulse picker.
XCS Aymeric ROBERT 1 LUSI X-ray Correlation Spectroscopy Instrument Advanced Procurement Review : Large Offset Monochromator.
Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory.
David Fritz LUSI DOE Review July 23-24, 2007 XPP (WBS 1.2) Breakout 1 X-ray Pump-Probe (WBS 1.2) David Fritz System Specifications.
W.J. Foyt LUSI DOE Review July 23, 2007 Project Management 1 Project Management W. J. Foyt Project Scope Timeline Cost Estimate.
Beam diagnostics in the beamlines
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
Workshop Overview, Charge and Deliverables Joachim Stöhr.
LCLS Facility Planning for LCLS-II. 2 LCLS vs. LCLS-II NowHXU - CuSXU - CuHXU - SCSXU - SC Photon Energy Range (eV)
Pioneering Science and Technology Office of Science U.S. Department of Energy UNDULATOR SYSTEMS REVIEW MARCH 3-4, 2004 ARGONNE NATIONAL LAB. 1 LCLS Optical.
Yiping Feng LUSI DOE Review July 23, 2007 Diagnostics (WBS 1.5)1 Diagnostics (WBS 1.5) Yiping Feng Motivations System Specifications.
Sébastien Boutet LUSI DOE Review July 23, 2007 CXI (WBS 1.3) 1 Coherent X-ray Imaging (WBS 1.3) Sébastien Boutet System Specifications.
J. B. Hastings LUSI DOE Review July 23, 2007 X-ray Optics 1 X-ray Optics J. B. Hastings Beam definition Attenuators Slits Pulse picker.
Yiping Feng LUSI DOE Review July 23, 2007 Diagnostics (WBS 1.5)1 Diagnostics (WBS 1.5) Yiping Feng System Specifications System.
Nadine Kurita - LUSI Chief Engineer
Coherent X-ray Imaging Instrument
LCLS CXI Sample Chambers and Engineering Solutions
X-ray Correlation Spectroscopy (WBS 1.4) Aymeric Robert
Experimental Facilities Planning
Operation and Safety ART Review Harald Sinn.
LUSI Diagnostics & Common Optics WBS 1.5
LUSI X-ray Pump-Probe Instrument WBS 1.2
John N. Galayda – Director of LCLS Construction March 30, 2009
Coherent X-ray Imaging WBS 1.3
X-ray Pump-Probe Instrument
Thomas Fornek Project Manager July 15, 2009
X-Ray Transport, Optics, and Diagnostics WBS Alan J
X-ray Pump-Probe Instrument
Optics John Arthur, SLAC & William W. Craig, LLNL April 24, 2002
John Arthur – LCLS Experimental Operations
Coherent X-ray Imaging Instrument WBS 1.3
X-ray Correlation Spectroscopy Instrument
X-Ray Endstation Systems (XES) 2006 Schedule
Presentation transcript:

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 1 Diagnostics/Common Optics: Priorities, Engineering Facility Advisory Committee Breakout Session 3 – X-Ray Systems, Including LUSI November Yiping Feng – Instrument Scientist Eliazar Ortiz – Lead Engineer Marc Campell – Mechanical Engineer Tim Montagne – Mechanical Engineer Rick Jackson – Design Engineer Don Arnett – Designer Ben Bigornia – Designer Joseph Stieber- Designer

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 2 Outline Distribution Profile, Intensity, Intensity-Position Monitor Slits Pulse Picker Attenuator

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 3 Components Distribution Components locations Distributed throughout the XPP, CXI, and XCS instruments, including X-ray transport tunnel SXR CXI Endstation Near Experimental Hall Far Experimental Hall X-ray Transport Tunnel XCS Endstation XPP Endstation AMO HEDS LCLS X-ray FEL

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 4 Components Distribution (cont.) Diagnostics/OpticsXPPCXIXCSTotal Pop-in Profile Monitor34512 Wavefront Monitor 1 1 Pop-in Intensity Monitor2259 Intensity-Position Monitor33511 Monochromator 11 X-Ray Focusing Lenses1 12 Slit System34613 Attenuators-Filters1113 Pulse Picker1113 Harmonic Rejection Mirrors1 12

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 5 Profile Monitor Purpose: Coarse beam alignment/monitoring; Coarse/fine beam profile Specifications: Destructive; Retractable At 100  m resolution - 24x24 mm 2 field of view; At 8  m resolution - 2x2 mm 2 field of view Capable of per-pulse 120 Hz Mechanical Requirements Scintillator 45º mirror Optical zoom lens Optical pixelated detector

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 6 Profile Monitor Challenges Design continuity Space Constraints Commonality Chamber Stands Stages Solutions Permanent staffing commitments Combine IM/PM Common mount for all monitor sensors Concepts based on proven designs Similarity to LCLS wire scanner

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 7 Profile Monitor Next Steps Update Spec. Documentation -Nov 08 PDR PM and Supports -Nov 08 Finalize Design PM -Dec08 Finalize Support Design -Dec08 FDR PM & Supports -Feb 09 Drawings -May 09

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 8 Intensity Monitor Purpose: Coarse beam alignment/monitoring; Simple point detector Specifications: Destructive; Retractable Relative accuracy < 1% Dynamic range 100 Capable of per-pulse 120 Hz Mechanical Requirements

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 9 Intensity Monitor Challenges Design continuity Commonality Chamber Stands Stages Solutions Permanent staffing commitments Common mount for all monitor sensors Concepts based on proven designs Similarity to LCLS wire scanner

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 10 Intensity Monitor Next Steps Update Spec. Documentation -Nov 08 PDR IM and Supports -Nov 08 Finalize Design IM -Dec 08 Finalize Support Design -Dec08 FDR IM & Supports -April 09 Drawings -Aug 09

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 11 Intensity-Position Monitor Purpose: Per-pulse normalization of experimental signals High-resolution beam position monitoring Specifications: Highly transmissive (< 5% loss) Relative accuracy < 0.1% Dynamic range 1000 Per-pulse op. at 120 Hz Mechanical Requirements

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 12 Intensity-Position Monitor Challenges Design continuity Space Constraints Commonality Chamber Stands Stages Solutions Permanent staffing commitments Common shaft mount for all monitor sensors Concepts based on proven designs Similarity to LCLS wire scanner

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 13 Intensity-Position Monitor Next Steps Update Spec. Documentation -Nov 08 PDR PM and Supports -Nov 08 Finalize Design PM –Dec 08 Finalize Support Design–Dec 08 FDR PM & Supports - Jan 09 Drawings -March 09

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 14 Slits Purpose: Defines the beam size & position Clean up scatterings (halo) around beam perimeter Specifications: Can withstand full LCLS flux – unfocused Minimize background scatter from blades Mechanical Requirements High-Z Low-Z High-Z Pink beam Mono beam D=3 mm

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 15 Slits Challenges Precise Motion Space Constraints Vendor performance capabilities have been put into question Solutions Available commercial products that would meet specifications with minor modifications. Commercial product meets envelope requirements Inspection reports have been requested from vendor on latest batch Slit loaner has been requested from vendor for in-house evaluation Inquired references from vendor and other labs about their experience with ADC’s slits.

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 16 High-Z Low-Z High-Z Pink beam Mono beam D=3 mm Slits Next Steps Update Spec. Documentation -Nov 08 PDR -Nov 08 Finalize Design –Dec 08 FDR PM & Supports - Jan 09 Inspect loaned unit –Feb 09 Drawings -March 09

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 17 Pulse Picker Design * Si3N4 coating on blade to reduce damage Purposes Select a single pulse or any sequence of pulses Reduce LCLS repetition rate to < 10 Hz Specifications < 3 ms switching time < 8 ms in close/open cycle time Only for < 10 Hz operation Withstand full LCLS flux Implementation Based on a commercial mechanical teeter- totter* Steel blade fully stops beam Si 3 N 4 required to protect the steel blade Capable of ms transient time Requires 100  m Mechanical Requirements

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 18 Pulse Picker Challenges Blade Coating Space Constraints X < 300 mm Minimize Z length Solutions Brazing schemes under study Combined attenuator with Pulse picker device

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 19 Pulse Picker Next Steps Update Spec. Documentation -Nov 08 PDR PP and Supports -Nov 08 Finalize Design PP –Dec 08 Finalize Support Design–Dec 08 FDR PP & Supports - Jan 09 Drawings -March 09

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 20 Attenuator Purpose Reduce incident X-ray flux Sample damage Detector saturation Diagnostic saturation Alignment of optics and diagnostics Attenuator Specifications Minimize wavefront distortion and coherence degradation Withstand unfocused flux 10 8 attenuation at 8.3 keV 10 5 attenuation at 24.9 keV 3 steps per decade Mechanical Requirements Attenuator System

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 21 Attenuator System Challenges Avoid pneumatic actuators Space Constraints X < 300 mm Minimize Z length Solutions Use of actuators with stepper motors Actuators meets envelope requirements Reduce number of view ports Combined attenuator with Pulse picker device

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 22 Attenuator System Next Steps Update Spec. Documentation -Nov 08 PDR Attn. and Supports -Nov 08 Finalize Design Attn –Dec 08 Finalize Support Design–Dec 08 FDR Attn & Supports - Jan 09 Drawings -March 09

Eliazar Ortiz LUSI Diagnostics & Common November 11-13, 2008 SLAC National Accelerator Laboratory 23 Summary Designs are progressing Challenges have emerged Vendor reputation Space constraints in X and Z Steps are being taken to overcome challenges