Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams December 2, 2008 Team Flight Club Final Presentation.

Slides:



Advertisements
Similar presentations
Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
Advertisements

Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Clean Air Project: Team Big Green SpaceGasm Final Presentation Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong.
Space Debris Conceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth
Solar Cell Efficiency Flight Readiness Review Teddy Bounds Angela Dunn Joel Sasser.
Clean Air Project: Team Big Green SpaceGasm Launch Readiness Review Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin.
Dynamo Team Careful Harry Glenda Alvarenga J.J. Busse Emily Eggers Adam Kemp Gabrielle Massone Dalton Smith Corey Wilson Launch Readiness Review.
Team 7, Final Presentation December 1, Mission Overview Send up petri dishes containing bacteria Analyze the effects of temperature, pressure, and.
Team Lightning Rod Final Presentation Fall 2010 Rev D 11/2/2010 Trevor Luke Chris Bennett Matt Holmes Sushia Rahimizadeh Alex Shelanski Matthew Dickinson.
{ Dynamo Careful Harry Glenda Alvarenga J.J. Busse Emily Eggers Adam Kemp Gabrielle Massone Dalton Smith Corey Wilson.
Brynn Larson Trey Karsten Terek Campbell Marcus Flores Marcell Smalley Shunsuke Miyazaki 2015/6/10 Team Ochocinco.
Team Delta Special Recon Ops Launch Readiness Review Taylor Boe Andrew Gilbert Bobby Stillwell Emily Howard Grace Harsha Andrew Buckner November 11, 2008.
Flight Club Critical Design Review Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams October 14, 2008.
Supernova Brigade Final Presentation Amanda Kuker, Michael Lotto, James Bader, Jordan Dickard, Blake Firner, Diana Shukis Rev
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Team D.S.R.O Taylor Boe Andrew Buckner Andrew Gilbert Gracie Harsha Emily Howard Bobby Stillwell September 23, 2008.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Team Zephyr Critical Design Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright October 14, 2008.
Team Name Final Presentation Team Members Date Fall 2010 Rev A
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.
Team R3D3 Final Presentation Devon Campbell Greg McQuie Kate Kennedy Henk Wolda Marisa Antuna Nicole Ela Tyler Smith 12/1/11.
Team Helios. Mission and Experiment Mission: Launch a balloonsat to determine the light filtering effect of the atmosphere and test the effectiveness.
Carnivorous Ninja Warriors Critical Design Review Cameron Comeau, Katie Brissenden, Kat Bryant, Arley Hendrick, Aram Podolski, Hannah Williams 06OCT2009.
Teamo Supremo Final Presentation Kristen Brenner Kim Fornall Ahna Isaak Nick Martinez Wes Roos Bart Tofany RevD
Team Thumbs Up Launch Readiness Review Nick Lenk Eddie Cyrus Brian Inglis Chase Prichett Greg Nelson Jake Varey 11/11/08.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn December 7, 2006.
Colorado Space Grant Consortium Foam Core Class #05 Foam Core Class #05.
Space Debris Critical Design Review Cole Bostrom Corey Godwin Jonathon Kirchmaier Emily Logan Sean Murphy Seanna Renworth October 14, 2008 Fall 2008 Rev.
Final Presentation Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani December 5, 2006.
Carnivorous Ninja Warriors Launch Readiness Review Katie Brissenden, Hannah Williams, Aram Podolski, Kat Bryant, Arley Hendrick, Cam Comeau November 5,
GONS Final Presentation Steven Benedict Jake Danser Josh Hecht Brock Kowalchuk Erik Shuttlesworth Matthew Zemel December 4, 2007 Steven Benedict Jake Danser.
Team Name Final Presentation Team Members Date Rev
Skillz That Killz Team 3 Conceptual Design Review Travis Dowdy, Jocelyn Mulkey, Hunter Hoopes, Taylor Smith, Kaitlyn Zimmitti, Jess Davidoff September.
Cydonia Final Review Presentation 6 December 2007 Greg Rancourt, Sarah Flinn, Dominic Boiko, Kevin Stuth, Derek Houtz, Max LaFon.
GloboGym Fighting Cobras Conceptual Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards September 21, 2006 Project.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Team Zephyr Launch Readiness Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright November 11, 2008.
Team Hubble Jr. Final Presentation Rachel Small, Holly Zaepfel, Ryan Del Gizzi, Kyle Norman, and Evan Levy December 5, 2006.
Launch Readiness Review 11 Nov Brady Phillips, Elliot Guber, Brandon Campbell, Dushyant Dhundra, Joel Mendez, Cameron Trussell.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Conceptual Design Overview
Team Hang 7 Final Presentation Lucas Migliorini, Sierra Williams, Chase Goodman, Ethan Hollenbach, Becca Lidvall, Abby Caballero, Paul Smith, Nikhil Desai.
Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya 5 November, 2009.
Space Monkeys Launch Readiness Review Project Curious George November 11, 2008 Project Curious George November 11, 2008.
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams September 23, 2008 Fall 2008 Rev A
REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL (RFP) NUMBER: 2519S02 FOR
GEEN 2850 / REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL (RFP) NUMBER: _01 FOR DESIGN CONCEPT OF THE CU Balloon Experimental Satellite (CUBESAT)
Zachary Cuseo, Sydni Smith, Andrew Fruge’, Tyler Knappe, Christopher Nie, and Shweta Maurya 8 October 2009.
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams November 11, 2008.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.
Victor Taberski, Ryan Walker, Allen Marshall, Matt Kerwin, Andrew Winthrop, Steven Ramm October 14, 2008 UANIOOU – (Upper Atmosphere Near-Infrared Optical.
Team Magnaritaville Final Presentation Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya December 1, 2009.
Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung Fall 2011 Rev C
Junk in a Box Final Presentation Frank Becky, Kyle Cummings, Jordan Haines, Villiam Klein, Matt Peoples, Ryan Scott and Aaron Young 4 December 2007.
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong 05 October 2010.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Spring REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL (RFP) NUMBER: 2500-SP03 FOR DESIGN CONCEPT OF THE Balloon Satellite (BalloonSat) PROPOSALS ARE.
Team S.H.I.E.L.D. Final Presentation
Skillz That Killz Team 3 Final Presentation
Team Go Go Gadgets Launch Readiness Review
Team Thumbs Up Final Presentation
S^3 Launch Readiness Review
Space Debris Critical Design Review
Launch Readiness Review
Team SCREAM Launch Readiness Review
Panoramic Rays Critical Design Review
Presentation transcript:

Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams December 2, 2008 Team Flight Club Final Presentation

Mission Overview The BalloonSat Flight Club shall ascend to an altitude of 30 kilometers to image the curvature and surface of the Earth, and to measure the light intensity at different altitudes to determine if commercial aviation has an impact on light intensity levels. –This shall be accomplished by measuring current using solar panels attached to the payload. Hypothesis: –The research conducted on Flight Club will conclude that there is a correlation between commercial aviation and global warming. If there is a measurable increase in light intensity above the flight level of aviation then one can conclude that contrails reflect light thus decreasing light intensity and decreasing the effect of global warming.

Design Overview

Battery Camera Memory Card Battery Switch 1 Heating Circuit Battery 2-channel Hobo Data Logger 2-channel Hobo Data Logger Internal Temperature Probe External Temperature Probe Solar Film 10 Ohm Resistor Voltage Logger Battery Functional Block Diagram

Results and Analysis (3 to 5 minutes) –Compare predicted and actual –Data, Plots, Pictures, Videos –All of the above should be analyzed and conclusions made –Include a recap of how your BalloonSat flight went –NOTE: Use your HOBO Temp and RH data but it should not be the focus of your results and analysis section. Show it, explain it, but then move on. I am more interested in your HOBO data if it indicates a failure mode. –NOTE: Don’t show pre-flight structural testing.

Results and Analysis Data shows clear increase in the light intensity and therefore current before the maximum altitude of commercial aviation However from the data gathered it is very difficult to conclude anything about the effects of commercial aviation upon light intensity There are not fluctuations in the light intensity within the flight levels as was predicted After about 15000m the light intensity decreases as the satellite reaches into the darkness of near space

Hobo Data

Pictures From Launch

Failure Analysis Camera: –Failure due to computer glitch or temperature –Believed to have failed due to the extreme temperature –About eighty pictures were taken in the beginning of the flight before the camera failed –Testing the camera afterwards showed that it worked again Internal and external temperature readings on the HOBO: –Even the initial temperature readings were wrong. –After the flight, the HOBO was tested, this time receiving accurate readings. –While it is impossible to tell the source of the HOBO’s failure, some possibilities have been eliminated. It can not be extreme cold because the failing temperature is -20 degrees Celsius and the camera worked at the beginning of the flight, proving the HOBO was not too cold.

Conclusions It was found that there was an increase in the rate of light intensity change at the maximum flight level of commercial aviation (14300 meters) –This is consistent with our hypothesis –While we cannot absolutely confirm the hypothesis, the retrieved data does not conflict with the hypothesis.

Lessons Learned Team Flight Club gained a large amount of valuable experience throughout the course. Changes that would be made to the satellite include, making sure that the HOBO data logger is fully operational prior to launch by running more tests and making sure the camera does not become frozen by adding another heater. Because our HOBO failed prior to launch, we realize we should have done more extreme cold tests too see where it stops functioning properly. In order to get more accurate data to prove or disprove our science hypothesis, it is necessary to have a more standardized and consistent method for gathering data. For instance when we standardized our solar panels we found that each panel did not supply the exact same voltage under the same light conditions Among the lessons learned, Team Flight Club has gained valuable electrical circuit-building experience, and expertise in critical problem solving and failure analysis.

Ready to Fly Again How to store: –upright, solar panels kept away from sharp objects, caution taken to ensure that wires both inside and outside of the box are not pulled, at room temperature. To prepare Flight Club for flight: –Program HOBO and Lascar Voltage Data Logger to start at a specific time, preferably 30 minutes prior to flight. –Turn heater should be switched to the “ON” position at least 15 minutes before flight –Turn camera should be switched to the “ON” position and back to the “OFF” position right before flight. –Tape both switches down to secure. –By listening to the camera for a long beeping sequence followed by camera shutter sounds, it can be verified that the program is properly running and taking pictures.

Appendix Weight Budget ObjectsWeight Per Unit (Grams)Number of UnitsOverall Weight (Grams) Part # Company Foam Core with Hot Glue and Aluminum Tape n/a Space Grant Hobo H n/a Space Grant External Temperature Cable515 n/a Space Grant Canon A570IS Digital Camera plus Battery and Memory Card2201 n/a Space Grant Heating System n/a Space Grant 9V Batteries n/a Space Grant Solar Film MPT Sundance Solar 2 East Main Street Warner, NH Flight String Tube101 n/a Space Grant Lascar Voltage Data Logger plus Battery401 El-USB-3 MicroDAQ.com, LTD. P.O. Box Maple Street Contoocook, NH Washers n/a Space Grant Paper Clips122 n/a Space Grant Wiring155 n/a Space Grant Total (Grams) Weight Margin (Weight Left)211.44

Appendix Monetary Budget ObjectsUnit PriceNumber of UnitsOverall Price Foam CoreProvided1n/a Thermal SheetsProvided1n/a Hobo H Provided1n/a Canon A570ISProvided1n/a Heating SystemProvided1n/a 9V BatteriesProvided4n/a Solar Film$8.504$34.00 UPS Shipping for Solar Film$8.621$8.61 Voltage Data Logger$ Extra Voltage Logger Battery$ UPS Shipping for Data Logger$ Dry Ice $13.71 DiodesProvided4n/a 10Ω (1% Tolerance) ResistorProvided2n/a Paper ClipsProvided2n/a Total$152.31

Appendix Requirements Matrix Mission RequirementsCompleted Design shall have one additional experiment that collects science data.The design implemented a light intensity experiment. After flight, BalloonSat shall be turned in working and ready to fly again.The BalloonSat shall be returned to Space Grant in working condition Flight string interface tube shall be a non-metal tube through the center of the BalloonSat and shall be secured to the box so it will not pull through the BalloonSat or interfere with the flight string.A non-metal tube has been installed into the BalloonSat. Internal temperature of the BalloonSat shall remain above 0ºC during the flight.Data received from the HOBO data logger is inconclusive. Total weight shall not exceed 1000 grams.The BalloonSat weighs grams. Each team shall acquire (not necessarily measure) ascent and descent rates of the flight string.Ascent and descent rates were retrieved from the Helium Balloon operator. Design shall allow for a HOBO H x48x19 mm and 29 grams.The HOBO has been implemented into the design. Design shall allow for external temperature cable.The external temperature cable has been implemented into the design. Design shall allow for a Canon A570IS Digital Camera 45x75x90 mm and 220 grams.The digital camera has been implemented into the design. BalloonSat shall be made of foam core.The BalloonSat has been constructed with foam core. Parts list and budget shall include spare parts.Spare parts have been included into the budget. All Balloonists shall have contact information written on the outside along with a US Flag.Contact information and a US Flag have been attached to the BalloonSat. Units shall be in metric.Units are in metric. Launch is on November 15, Time and location: 7:30 AM in Windsor, CO. Launch schedule will be given later. Everyone is expected to show up for launch. Only one team member is required to participate on the recovery. Launch and recovery should be completed by 3:00 PM. Due to recent changes in FAA regulations, the launch occurred at 7:06 AM. Recovery occurred at 3:00 PM. No one shall get hurt.No one has gotten hurt. All hardware is the property of the Gateway to Space program and must be returned at the end of the semester.All hardware shall be returned following flight and analysis. All parts shall be ordered and paid by Chris Koehler’s CU MasterCard by appointment to minimize reimbursement paperwork. All teams shall keep detailed budgets on every purchase and receipts shall be turned in within 48 hours of purchase with team name written on the receipt. All parts have been ordered using Chris Koehler’s CU MasterCard with proper documentation. A detailed budget has been kept. All purchases made by team individuals shall have receipts and must be submitted within 60 days of purchase or reimbursement will be subject to income taxes.All purchases made by team individuals have been properly documented. Have fun and be creative.All team individuals have been having fun and being creative throughout the project. Absolutely nothing alive will be permitted as payloads with the exception of yellow jackets, mosquitoes, fire ants, earwigs, roaches, or anything you would squish if you found it in your bed.No live animals shall be present during flight. Completion of final report (extra credit if team video is included)The final report shall be completed.

Appendix The advice Team Flight Club would give to next year’s teams would be to figure out what you want your scientific experiment to be as early as possible. It can be a bit daunting given a blank slate, but try to come up with the general focus of your experiment before doing anything else. Also, it’s nice to have an experiment that can be applied to some real-world phenomena. Remember that the vast majority of the class is setting up and executing your experiment. Throughout the class, it’s a good idea to keep things as simple as possible. You’ll find that once you have the general idea for an experiment, there’ll be many different ways to carry out this idea. More specifically, there will be a distribution between simple and more complex designs, usually with the more complex designs trying to explain more things at once. Right about this time you should nail down the hypothesis for your experiment, which should try to answer how one specific factor affects some general process. From there you should pick the experimental design that describes both values as completely as possible. When building your satellite, be creative and figure out how exactly you want to implement your experiment. Also, don’t be afraid to utilize the resources that the professor gives you. With the right question, almost any problem can be solved. Finally, make sure to enjoy yourself throughout the semester and really get to know your teammates. Hopefully you’re all in this class because you want to be; with a bit of determination, this can be one of the most memorable classes you’ll ever take. P.S. If at all possible, don’t sleep in on launch day.