1 Salt Lake City Gateway Area Railroad Consolidation Project Grant G. Schultz, Ph.D., P.E., PTOE Assistant Professor Brigham Young University CE En 361.

Slides:



Advertisements
Similar presentations
Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
Advertisements

California High-Speed Train Project Los Angeles Union Station Alternatives Analysis January 7, 2010 Board Presentation.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Chicago Transit AuthorityJune, 2007 Chicago Transit Authority Regional South Metro Transportation Summit June 16, 2007 Matteson, Illinois.
Gilbert Road Light Rail Extension Transportation Project Advancement Agreement City Council Study Session December 4, 2014.
Environmental Assessment Public Meeting
An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary.
STATE ROAD 100 CORRIDOR COMMUNITY REDEVELOPMENT AGENCY Bulldog Drive Improvements Right-of-Way and Design September 21, 2010 Presentation for SR 100 CRA.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
ASSOCIATION OF AMERICAN RAILROADS Chicago Area Rail Infrastructure 16,000 acres, twice the area of O’Hare 78 yards, including 21 intermodal (rail-truck)
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Minnesota Department of Transportation ARRA, Greater Minnesota Transit, Airport Program Status, & Local Bridge Bonding Update House Transportation Finance.
January 25, SMART GROWTH IN RURAL IDAHO TOWNS.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Anaheim Regional Transportation Intermodal Center Project Update.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Montgomery County Transit Task Force Meeting August 17, 2011.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Project Briefing Metropolitan Washington Council of Governments Transportation Policy Board Project Briefing Metropolitan Washington Council of Governments.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011.
May 25, 2010 Wisconsin High Speed Intercity Passenger Rail From vision to reality MADISON COMMUNITY MEETING John Oimoen, High Speed Passenger Rail Program.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
A Proposed I-5 Loop Design Option Riverfront For People Portland, Oregon January 16, 2004 Riverfront For People Portland, Oregon January 16, 2004.
Status Report of the Alamo Regional Mobility Authority October 25, 2012.
Case Study # 1 – Interstate 94 in the Twin Cities 9/15/04 Pavithra Parthasarathi, Peter Muehlbach and Damon Sather.
PROJECT UPDATE PUBLIC OPEN HOUSE #3 OCTOBER 17 4:30 PM – 6:30 PM Dakota County Northern Service Center.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Planning & Community Development Department Conditional Use Permit #5029 and Other Land Use Entitlements: Final Environmental Impact Report and Statement.
Ottawa’s Light Rail Transit Project OLRT Update to Finance and Economic Development Committee March 2011.
February’s Accomplishments Met extensively with FTA staff and received the Record of Decision from FTA Finalized Negotiations with the top ranked Design.
USA Parkway Project Welcome Public Information Meeting to the
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
DOWNTOWN MOVES TRANSFORMING OTTAWA’S STREETS
Seattle Center City Connector Transit Study Open House #1 February 6, 2013.
Metropolitan Council 1 Twin Cities Region Transportation Policy Plan Nacho Diaz Metropolitan Council Evaluating Economic and Community Impacts of Transit.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Trade Transportation Activities Report Bill Frawley, TTI 2012 Border to Border Transportation Conference South Padre Island, TX November 14, 2012.
Greenville Downtown Intermodal Transportation Center Report to the Greenville Historic Preservation Commission October 27, 2009.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
TPB TECHNICAL COMMITTEE MEETING September 6, 2013 District Department of Transportation Federal Railroad Administration.
Planning & Community Development Department 180 South Euclid Avenue Demolition of Existing Structure Consolidated Design Review (Appeal) City Council June.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Stage 2 Light Rail Transit Program “In the ground ready”
ARCH – 4601 Feasibility Study Presentation
Potomac Yard Metrorail Station
Finance Committee & City Council October 10, 2016
ASSOCIATION OF AMERICAN RAILROADS. ASSOCIATION OF AMERICAN RAILROADS.
Ohio Rail Development Commission November 15, 2017 Meeting
Regional & City of Becker Feasibility Studies
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Corridor Light Rail Transit Feasibility Study
Moving Forward with Positive Change
Northeast Area Transit Evaluation (NATE) II Update FasTracks Monitoring Committee August 5, 2014.
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

1 Salt Lake City Gateway Area Railroad Consolidation Project Grant G. Schultz, Ph.D., P.E., PTOE Assistant Professor Brigham Young University CE En 361 October 1, 2004

2 Topics of Discussion Background on the creation and development of the Gateway Railroad Consolidation Project The environmental approval process Project results Lessons Learned

3 A Multi-Modal Project... Freeways Surface Streets Freight Rail Commuter Rail Passenger Rail Light Rail

4 A Multi-Jurisdictional Project... Salt Lake City Utah Department of Transportation Utah Transit Authority Federal Highway Administration Federal Transit Administration

5 Salt Lake Gateway Project Area Approximately 800 Acres West of the Salt Lake City Central Business District

6 Salt Lake Gateway Project Area An area of declining rail-served industrial uses

7 Salt Lake Gateway Project Area An area of opportunity for expansion of commercial, light industrial and residential land uses

8 Salt Lake Gateway Project Area Challenges –Freeway viaducts inhibited access to the area

9 Salt Lake Gateway Project Area Challenges –Railroad spurs in 400 and 500 West

10 Salt Lake Gateway Project Area Challenges –Rail traffic blocked streets on at- grade crossings

11 Gateway Project Creation 1994, Visionary Gateway Plan –Created public and political support for the idea of consolidating rail lines, shortening the 400 South, 500 South and 600 South viaducts –Developed land use concepts for the area, including the opportunity for an Intermodal Center

12 Gateway Project Creation 1995, Rail Consolidation Implementation Study –Created an implementation plan for shortening the viaducts and consolidating rail lines –Required the construction of a new station and track to house Amtrak –Consultant recommendations on cost- sharing for the project

13 Gateway Project Creation June 16, 1995, Salt Lake City awarded 2002 Olympic Winter Games –Increased urgency to complete projects –Opportunity for funding increased

14 Gateway Project Creation 1996, Contracts Awarded for Construction of North/South Light Rail Line –Northern terminus of the line at the Delta Center, in the Gateway area

15 March, 1996; Decision to use Design/Build process for reconstruction of I-15 through the Salt Lake Valley October, 1996; I-15 Reconstruction Bid Package was released –Included Option B to shorten the viaducts to downtown Salt Lake City –Option had to be exercised by the Utah Department of Transportation by November 1, 1997 Gateway Project Creation

16 March, 1997; Approval to proceed on preparation of environmental documents for the viaduct shortening and Intermodal Center –Prior to November 1, 1997: Completion of the environmental process Agreement with all parties involved –UDOT, Salt Lake City, UTA, Union Pacific Railroad, Amtrak, Cereal Food, Holnam Cement, Tenneco Packaging, Mountain Cement, NAC Gateway Project Creation

; Gateway Land Use Master Plan –Creation of a land use master plan for the 800 acre Gateway area –Accessibility of this area is a major focal point to the master plan Gateway Project Creation

, West/East LRT MIS/EIS –Preferred Alternative was a west/east light rail line running from the airport to the University of Utah –Preferred alignment passes through the Gateway Area – requires shortening the viaducts Gateway Project Creation

, Commuter Rail Study –Commuter Rail is feasible – need for a station in the Gateway Area Gateway Project Creation

20 Environmental Analysis Two separate environmental documents –Viaduct Shortening – FHWA (remember – option must be exercised by November 1, 1997) –Intermodal Center - FTA

21 Viaduct Environmental Key issues –Traffic operations –Business access –Remove rail from 400 W. and 500 W. –Accommodate rail service to shippers Holnam Cement Cereal Food Processors PCA Tenneco Amtrak

22 Viaduct Environmental Holnam Cement

23 Viaduct Environmental Cereal Food Processors

24 Viaduct Environmental PCA Tenneco

25 Viaduct Environmental Amtrak

26 Viaduct Environmental Results –Negotiated with shippers to resolve rail service issues –Analyzed traffic operations which indicated traffic can be accommodated –Received a Finding of No Significant Impact (FONSI) in October 1997 Met November 1 deadline!

27 Intermodal Center Environmental Key Issues: –Modes to be included at the site –Location –Hazardous Waste –Historical Properties

28 Intermodal Center Environmental Initially a mono-modal site for relocating Amtrak as part of the viaduct shortening and track consolidation Developed into a true Intermodal Center Commuter rail study had identified the need for a Gateway station Greyhound was losing their lease in their downtown location

29 Intermodal Center Environmental Four sites evaluated for location of Intermodal Center –Union Pacific Depot –Rio Grande Depot –600 West/South Temple –200 South/600 West

30 Intermodal Center Environmental Union Pacific Depot

31 Intermodal Center Environmental Rio Grande Depot

32 Intermodal Center Environmental 200 South/600 West

33 Intermodal Center Environmental

34 Results –Staff recommended site at 200 South/600 West –City Council voted in favor of site –EA document completed to include all modes –Finding of No Significant Impact (FONSI) received October 21, 1998 Intermodal Center Environmental

35 Gateway Area Map

36 Project Results Viaduct shortening –Signed agreements with all shippers to sever or relocate rail service January 1, 1999 –Constructed the Cereal Foods rail spur –Viaducts designed and constructed for the shortened lengths

37 Project Results Viaduct shortening

38 Project Results Intermodal Center –Environmental document approved October 21, 1998 –Temporary Amtrak Station currently being used –Final design approved and under construction

39 Project Results Intermodal Center

40 Project Results Intermodal Center

41 Project Results Intermodal Center

42 Project Results Intermodal Center

43 Project Results Intermodal Center

44 Project Results Intermodal Center Before Today

45 Project Results Gateway Land Use –‘Bridges’ five acre development proposed west of Intermodal site –‘Gateway’ 40 acre development west of and incorporating the historic Union Pacific depot –Reuse of existing warehouses to retail and housing uses

46 Project Results

47 Project Results Gateway Land Use

48 Project Results Gateway Land Use

49 Project Results Gateway Land Use

50 Gateway Land Use Project Results

51 Gateway Land Use Project Results

52 The Gateway

53 The Gateway

54 Project Results Commuter Rail –Weber County to Salt Lake Draft Environmental Impact Statement (EIS) completed –Review currently underway –Trains could start rolling into the station as soon as 2007

55 Project Results

56 Project Results

57 Project Results Commuter Rail –Included as an alternative for the I-15 Corridor Utah County – Salt Lake County EIS –Studying corridor from Salt Lake City to Santaquin Light Rail –Several projects currently being evaluated

58 Project Results I-15 Corridor Utah County – Salt Lake County Study Area

59 Lessons Learned Make no small plans.… One project begets another... Develop public support for your project Have the Olympics come to your community!

60 Transportation Planning at BYU Urban Transportation Planning (CEEn 565) Fall semester –Keep your text! Site Transportation Planning (CEEn 594R/564) Winter semester –Prerequisite CEEn 562 Traffic Engineering (CEEn 562) Fall semester

61 Questions? Dr. Grant G. Schultz, P.E., PTOE 368S CB