1 ARCH – 4601 Feasibility Study Presentation II. Facility Program, C. Area Master Plan (p. 75 – 84) Jason B. Ashe

2 C. Area Master Plan Summary of the findings and conclusions of the master planning efforts for the Near Northside. Key Parts: Workshop Forces and Issues Facility Security Concepts Conclusions and Recommendations

3 C. Area Master Plan Workshop Conducted in October 2005
Focus on the development issues surrounding the Houston Intermodal Center / Multimodal Terminal Concern the planning of the mixed-use development of Main and Burnett Streets Specify the implementation and availability of affordable housing 3 Major Topics: Affordable Housing Intermodal Center / Multimodal Terminal Master Planning Concepts

4 C. Area Master Plan Affordable Housing - Intermodal Center -
Two local concepts presented by The Metropolitan Organization and the Avenue CDC Case studies presented by Richard Baron Information was presented related to poverty levels, incomes, and location Intermodal Center - Information on such a facility Review of other intermodal centers, the general area of Houston, and the impact of the facility Discussion of joint development possibilities and desired characteristics Master Planning Concepts - Relationship between affordable housing and the Intermodal Center General land uses and other issues local residence have

5 C. Area Master Plan Forces and Issues Identified Forces and Issues:
Study identified Zone A as the preferred location for the Intermodal Center Located in the north end of downtown Houston and areas immediately to the north Identified Forces and Issues: Selection of Hypothetical Site for Discussion Purposes - Can be a catalyst to revitalization of underutilized inner core urban neighborhoods if properly integrated within the community All surrounding areas are either vacant or commercial properties None include residential neighborhoods and are potentially viable Forces that Shape the Center: “The Form Givers” - Influence of the location of the Intermodal Center from the intersection of the commuter rail and LRT tracks

6 C. Area Master Plan Intermodal Center Impacts: “The Ripple Effect” -
Minimum site area will be approximately 7 acres, excluding parking Site needs sufficient land for transit facility program needs and public areas for transitional space to integrate into neighboring communities Most likely be multi-level due to grade-separation requirements Intermodal Center Impacts: “The Ripple Effect” - To be a positive economic development generator and a model of sensitive rebuilding Public / Private partnership share vision for improvements Street / rail crossings and new freeway connections will create new elevated structures Infrastructure environment needed to support the Intermodal Center can become Economic Corridors for new development Joint Development Opportunities - Public / private collaboration is common for the city of Houston Incorporate joint development within the Houston facility, since transit-oriented development is a focus of METRO

7 C. Area Master Plan Neighborhood Integration -
Located in an area that can support active urban environment Pedestrian-friendly streetscapes should surround the facility Day and night mixed-use developments, to enhance activity and security Transition from institutional Intermodal Center to the residential single-family zone Facility Security Concepts - Principles of Crime Prevention Through Environmental Design (CPTED) should be followed Open public facility for travelers and transit users with amenities to support transportation patrons Security concepts include: Accessibility, Edge Zone, Mixed-Use Development Building Zone, and Multimodal Terminal Zone

8 C. Area Master Plan Accessibility - Edge Zone -
Integrated economically with community and easily accessed from adjacent neighborhoods Facility becomes part of the community and creates connectivity Edge Zone - Edge definition of facility is important for security enforcement and establishes the limits of perimeter Create a positive image to neighboring community Mixed-Use Development Building Zone - Developments that generate day and night activities in public, increase security Multi-faced developments increases a passive deterrent to crime Multimodal Terminal Zone - Shared passenger waiting areas, transit ride stores, food court / service, other public amenities, and storefront police station offers a sense off safety and security

9 C. Area Master Plan Conclusions and Recommendations -
Affordable housing should be implemented as a priority project and integrated into the residential component of the plan Plan should account for public right of way, transit, parks, public services, and development Minimum of 8.6 acres or 20% of total residential units should be included in development plans, whichever one is greater Townhomes: 14 dwelling units (DU) / per acre Up to Mid-Rise: 30 DU / acre Senior Housing: 40 DU / acre Integrate adjacent neighborhoods to create a sense of community Positive impact on the community