Presentation is loading. Please wait.

Presentation is loading. Please wait.

Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011.

Similar presentations


Presentation on theme: "Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011."— Presentation transcript:

1 Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011

2 State Rail Plan Awarded 2010 National Transportation Planning Excellence Award from the U.S. DOT and the American Planning Association in July 2010 First statewide freight and passenger rail plan developed in Minnesota Extensive public involvement Submitted to FRA in February 2010

3 Priority Passenger Rail Projects Identified in the State Rail Plan Develop a robust intrastate and interstate passenger rail system in Minnesota High speed service between the Twin Cities –Milwaukee-Chicago, Twin Cities and Duluth; Twin Cities and Rochester Enhanced conventional passenger rail service (up to 90mph) from the Twin Cities to St. Cloud, Moorhead, Mankato, Eau Claire, and between Mpls. and St. Paul Advance projects incrementally and simultaneously as demand warrants and funding is identified

4 Phase I Projects (2010-2030) Phase II Projects (Future Expansion) Other Freight Lines

5

6 Twin Cities to Milwaukee HSR Update Twin Cities to Chicago HSR Corridor –Awarded ARRA funds late February 2010 $1.2 million Tier 1 Environmental Impact Statement (EIS) Twin Cities to Milwaukee –Negotiations with FRA, cooperative agreements with Wisconsin and FRA –Madison to Milwaukee impacts –Next steps: Tier 1 Environmental Documentation 2011 - 2012 Tier 2 EIS / Preliminary Engineering 2012 – 2014 *

7 Fourteen Routes Being Evaluated as “Build Alternatives”

8 Northern Lights Express The Northern Lights Express - to re-establish regional passenger rail service from Duluth to Minneapolis –track and signal improvements,speeds up to 110 mph Current Status: –Finalizing environmental assessment –Preliminary engineering, design work could begin this fall –Service could commence in 2014-15

9 Rochester HSR Corridor State Rail Plan identifies need for new connection to Rochester Implement 110 mph service between Rochester and the Twin Cities via a green field alignment. Project development timeline is substantially longer to completed –Environmental work will be comprehensive –Extensive R/W required. –Access into suburban Metro Twin Cities and to MSP will be complex

10 Passenger Rail Facilities St. Paul Union Depot –Multimodal hub –Amtrak’s return 2012 Minneapolis Transportation Interchange –Multimodal facility –Adjacent to the Twins Stadium –Completed by 2014

11 Governance and Funding Project Governance Funding Rail Services

12 Governance and Funding No formal governance structure or sustainable funding sources for passenger rail in Mninnesota How are we positioned to participate with the nine state Midwest Regional Rail Initiative? What are the roles of the various interests (local, county governments, railroads, advocates)? What funding options exist to implement state supported services?

13 Governance Governance model unique to Minnesota –Statutory, constitutional regulatory issues Roles of internal partners –State – design, build, secure equipment, rail negotiations –RRAs and local governments – advocacy, momentum, station area planning and economic development Relationship to partner states of the MWRRI –Cross route subsidization, shared equipment

14 Funding Capital vs. operations and maintenance –No federal operating assistance Funding tools and strategies –Best practices –Methods currently Necessary legislative actions Interim funding strategy

15 Dan Krom, Director Passenger Rail Office Mn/DOT 651-366-3193 Daniel.Krom@state.mn.us Questions ? Contact:


Download ppt "Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011."

Similar presentations


Ads by Google