TPB TECHNICAL COMMITTEE MEETING September 6, 2013 District Department of Transportation Federal Railroad Administration.

Similar presentations


Presentation on theme: "TPB TECHNICAL COMMITTEE MEETING September 6, 2013 District Department of Transportation Federal Railroad Administration."— Presentation transcript:

1 TPB TECHNICAL COMMITTEE MEETING September 6, 2013 District Department of Transportation Federal Railroad Administration

2 AGENDA Overview Status Update Alternatives Schedule & Next Steps

3 STUDY AREA 2

4 LONG BRIDGE OVERVIEW DDOT received an ARRA grant from the Federal Railroad Administration to analyze: the structural integrity of the Long Bridge multi-modal connectivity and opportunities for operational improvements the long-term multi-modal capacity improvements (to include the future opportunity for high-speed and intercity passenger rail, commuter rail, transit, bike and pedestrian, auto, and freight) 2 track railroad bridge crossing the Potomac River Owned by CSX CSX, Amtrak, and Virginia Railway Express (VRE) operate on the bridge 3

5 ANALYSIS MODES Rail Freight Rail Passenger Amtrak/HSR VRE Marc Vehicular Streetcar Metrorail Pedestrian / Bicycle Source: Mike Schaller, VRE

6 NTP Site Visit with Interagency Partners Public Meeting #1 (November 13, 2012) Bridge Workshop Alternatives Development Public Meeting #2 (June 6, 2013) Alternatives Selection for Analysis PROJECT STATUS 5

7 -No Build (1) -Railroad track expansion + ped/bike (2) -Railroad track expansion + streetcar + ped/bike (3) -Railroad track expansion + shared lanes for streetcar and vehicular + ped/bike (4) -Railroad track expansion + shared lanes for streetcar and vehicular + vehicular + ped/bike (5) -Four track tunnel (6) ALTERNATIVES 6

8 ALTERNATIVE 1 7

9 ALTERNATIVE 2 8

10 ALTERNATIVE 3 9

11 ALTERNATIVE 4 10

12 ALTERNATIVE 5 11

13 ALTERNATIVE 6 12

14 Demand and Operations Analysis – Summer/Fall 2013 Concept Engineering – Fall 2013 Finalize Report – Fall/Winter 2013 _____________________________________________________________ Next meetings: Fall 2013: Freight Subcommittee Meeting Interagency Meeting Public Meeting #3 SCHEDULE & NEXT STEPS 13

15 QUESTIONS www.longbridgeproject.com


Download ppt "TPB TECHNICAL COMMITTEE MEETING September 6, 2013 District Department of Transportation Federal Railroad Administration."