Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.

Slides:



Advertisements
Similar presentations
Uli Schäfer Trigger Status JEP (JET/ENERGY PROCESSOR) Komponenten JEM0 (JET/ENERGY MODULE) -Hardware -Firmware JEM1 nächste Tests / Termine Production.
Advertisements

On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
Uli Schäfer JEM Status and Test Results Hardware status JEM0 Hardware status JEM1 RAL test results.
Uli Schäfer JEM Status and plans Hardware status JEM0 Hardware status JEM1 Plans.
5th April, 2005JEM FDR1 JEM FDR: Design and Implementation JEP system requirements Architecture Modularity Data Formats Data Flow Challenges : Latency.
GOLD Status and Phase-1 Plans Andi E. & Uli S. Uli Schäfer 1.
Uli Schäfer 1 BLT – status – plans BLT – backplane and link tester Recent backplane test results Test plans – week June 15.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
JEM upgrades and optical data transmission to FEX for Phase 1 Andi E. & Uli S. Uli Schäfer 1.
Uli Schäfer 1 (Not just) Backplane transmission options Upgrade will always be in 5 years time.
Uli Schäfer 1 Mainz L1Calo upgrade activities news – BLT hardware/firmware status.
Cluster Processor Module : Status, test progress and plan Joint Meeting, Mainz, March 2003.
Uli Schäfer JEM Plans Status (summary) Further standalone tests Sub-slice test programme JEM re-design Slice test.
Uli Schäfer JEM0 Status (summary) 3 JEM0s up and running: JEM0.0 used for standalone tests only (Mainz) JEM0.1 fully qualified module0 JEM0.2 (like JEM0.1.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Uli Schäfer 1 JEM PRR Design changes Post-FDR tests FDR issues.
Uli Schäfer JEM0 JEM0 Hardware : overview, history, and status JEM0 Firmware : algorithms, status JEM - The next iteration : many questions, few answers.
Uli Schäfer 1 (Not just) Backplane transmission options.
5th April, 2005JEM FDR1 Energy Sum Algorithm In all stages saturate outputs if input is saturated or arithmetic overflow occurs Operate on 40Mb/s data.
Uli Schäfer 1 JEM1: Status and plans Hardware status Firmware status Plans.
Uli Schäfer JEM0 (*) JEM0 Hardware : overview, history, and status JEM0 Firmware : algorithms, status JEM – plans and timescale (*) Module0 specifications.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Uli Schäfer JEM Status and plans Firmware -Algorithms -Tools -Status Hardware -JEM1 -Status Plans.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 (Not just) Backplane transmission options Uli, Sam, Yuri.
5th April, 2005JEM FDR1 JEM FDR: Design and Implementation JEP system requirements Architecture Modularity Data Formats Data Flow Challenges : Latency.
Uli Schäfer 1 CP/JEP backplane test module What’s the maximum data rate into the S-CMM for phase-1 upgrade ?
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Uli Schäfer 1 JEM1: Status and plans Hardware status Firmware status Plans.
Hardware status GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Uli Schäfer 1 JEM Test Strategies Current plan: no JTAG tests at R&S  initial tests done at MZ Power-up / currents Connectivity tests (JTAG) per (daughter)
Uli Schäfer JEM Status and plans RAL test results Hardware status Firmware Plans.
Uli Schäfer JEM1 In input modules T,S probably mix of φ-bins 5,6 due to routing problems of high-speed LVDS links With current algorithm rounding errors.
Uli Schäfer JEM hardware / test JEM0 test programme Mainz standalone RAL sub-slice test JEM re-design Heidelberg slice test.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Uli Schäfer 1 (Not just) Backplane transmission options.
Uli Schäfer JEM Status and plans Firmware Hardware status JEM1 Plans.
Uli Schäfer 1 JEM: Status and plans Production / commissioning Plans.
Uli Schäfer JEM Status and plans Algorithms Hardware JEM0, JEM1 Tests Plans.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
FDR of the End-cap Muon Trigger Electronics 1/Mar./04 1 Slice Test (SLT) of TGC electronics Introduction Simulation Trigger part SLT Wire Wire and Signal.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
14/November/2002 CF NSS2002 in Norfolk, Virginia, USA 1 The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System Introduction Overview.
JEP HW status and FW integration plans Uli Schaefer and Pawel Plucinski Johannes-Gutenberg Universitaet Mainz Stockholm University.
Topology System Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
L1Topo Status & Plans Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, S.Krause, S.Moritz, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
Uli Schäfer 1 JEM configurator progress FPGAs are RAM-based programmable logic devices Need to be loaded with a ‘configuration’ after power-up, so as to.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Uli Schäfer 1 JEM Status and plans Hardware -JEM1 -Status Firmware -Algorithms -Status Plans.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
CMX status Yuri Ermoline for the MSU group Mini-TDAQ week, CERN, 9-11 July 2012,
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 12-May-2014.
Ideas about Tests and Sequencing C.N.P.Gee Rutherford Appleton Laboratory 3rd March 2001.
FED RAL: Greg Iles5 March The 96 Channel FED Tester What needs to be tested ? Requirements for 96 channel tester ? Baseline design Functionality.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
PSI - 11 Feb The Trigger System of the MEG Experiment Marco Grassi INFN - Pisa On behalf of D. Nicolò F. Morsani S. Galeotti.
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 19-May-2014.
Samuel Silverstein Stockholm University CMM++ firmware development Backplane formats (update) CMM++ firmware.
CF 16/Feb/20031 H8 Beam Test in 2003 ─ Preparation status TGC-Japan electronics group.
L1Topo post review Uli Schäfer 1 Observations, options, effort, plans Uli.
GOLD TESTS (Virtex-6) ● Jitter analysis on cleaned TTC clock ( σ = 2.9 ps) ● Signal integrity: sampled in several positions along the chain ● MGT and o/e.
Uli Schäfer 1 Mainz R&D activities. Uli Schäfer 2 MZ R&D BLT has been built and tested (backplane transmission only). A few minor issues were found. Possible.
ATLAS calorimeter and topological trigger upgrades for Phase 1
Generic Opto Link Demonstrator
CPM plans: the short, the medium and the long
Presentation transcript:

Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans

Uli Schäfer 2 Largely identical to JEM 1.0 Additional daughter module: Control Module (CM) CAN VME control Fan-out of configuration lines JEM1.1

Uli Schäfer 3 JEM status 4 JEM 1.0 main boards available 3 are fully working, 1 has short on TTCdec module connector 1 JEM 1.1 main board available, so far ok. All populated with input modules 5 new G-link modules available Assembled by Bruno So far 3 working 0-version of control module No CAN No VME CPLD Sum processor configuring from flash (ACE, working now!), all others via VME  JEM1s working (standard tests) Firmware (sum, input) stable - new readout format successfully tested

Uli Schäfer 4 JEM1 status : tests JEM tests done in Mainz, at RAL and CERN test beam Up to 4 JEMs in a 9U crate allowing for FIO tests either direction, along with VMM, TCM, CMM (and CPMs!) External data sources for LVDS : 1 DSS 16-channel (MZ) Several DSS (RAL) LSM (RAL) PPr (RAL, CERN - 4 channels) External data sinks for Merger signals : 2 CMMs (RAL) Readout path: Complete ROS (RAL, CERN) G-link tester with f/w pattern comparison (MZ)

Uli Schäfer 5 JEM1.0 status : tests System tests at RAL: (from June 2004) DSS  JEM  crate CMM  system CMM  ROD  ROS  ROD  ROS Comparing readout data against simulation. Data taken up to 5 slices of JEM DAQ data. Trigger rate up to 60kHz, 4*10 6 events analysed, no errors observed on JEM readout. Interface tests: LVDS inputs, merger outputs, FIO, readout links BER measured, no errors in (CMM,FIO), (ROD), bits (LVDS)

Uli Schäfer 6 FIO tests : delay scan All data latched into jet processor on a common clock edge Sweep TTCrx delay setting, 104ps steps Measure data errors on each channel : 10 bits, 5 signal lines Single channel 8ns error free All channels 6.5ns error free  All interfaces ok, timing ok, latency within budget (<9.5 ticks) But: noise observed on FIO lines…

Uli Schäfer 7 JEM1 noise problem FIOs using 1.5V DCI/60Ω signalling. CMOS thresholds 35%/65% Noise observed close to thresholds (full activity) Screen shot typical, not worst case: All signal lines active -- 1 input proc. -- every other off

Uli Schäfer 8 JEM1 problems Difficult to distinguish cross talk ground bounce FPGA pins / vias, daughter module GND connection Check on merger lines: 2.5V signals Noise 1.25 V pp

Uli Schäfer 9 JEM1 noise Current assumption: Noise might have several contributions but dominated by crosstalk: buses are typically 30cm long, 130µ tracks, 290µ pitch  160µ gap No effort available for simulation  Build test board with widely spaced 60Ω tracks (.46 mm)

Uli Schäfer 10 Various track densities Varied GND return quality (GND shields) No results yet Cross-talk tester

Uli Schäfer 11 JEM1.2  Design JEM1.2 with wide spacing (~.5mm?)  Need more routing space, signal layers,… Significant amount of design work

Uli Schäfer 12 JEM1.2 Signal layers: 2 microstrip 2 striplines 1 dual-stripline Micro-vias Blind vias.4mm Buried vias Total: 2.2mm Components on bottom!

Uli Schäfer 13 Plans Continue cross-talk tests Layout JEM with widened data buses Further design work required JTAG test adapters Input modules (add voltage/temperature sensor) Control module (add CAN / VME / configuration circuitry) Readout tests (9U RODs) Further tests with stress patterns required on all interfaces, particularly on FIOs Tests at elevated temperature ? Further LVDS tests required (LSM, PPR) PRR in August ? Production time ~8 weeks Need test rig in MZ (or HD?) LSM / GIO / CMM ? / ??? !!!! Lead time for FPGAs !!!!