M3: ProDiver 525 *Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 9 Mar 29 Chip Level Simulation Overall Project.

Slides:



Advertisements
Similar presentations
Status Specification definition (done) Architecture
Advertisements

M3: ProDiver 525 Kavita Arora (M3-1) *Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 4 Feb 04 Size Estimates/ Floor Plan Overall.
Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 7: March 1st Component Layout (Corrected) Overall Project Objective: Design.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 05 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 19 Overall Project Objective : Dynamic Control.
M3 Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions.
Viterbi Decoder: Presentation #10 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 10: 5 th April Final Design Corrections.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Virtual Wallet Gates Winkler Yin Shen Jordan Samuel Fei /23/2009 A handheld device that saves time and money through smart budget management and.
1 Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation 13: Final Presentation.
Noise Canceling in 1-D Data: Presentation #12 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 11 th, 2005 Final.
Noise Canceling in 1-D Data: Presentation #13 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 20 th, 2005 Short.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage VI: February 25 h 2004.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
Huffman Encoder Project. Howd - Zur Hung Eric Lai Wei Jie Lee Yu - Chiang Lee Design Manager: Jonathan P. Lee Huffman Encoder Project Final Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 10: April 5th Chip Level Simulation Overall Project Objective: Design an.
Noise Canceling in 1-D Data: Presentation #10 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 28 rd, 2005 Chip Level.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 11: April 12th Short Final Presentation Overall Project Objective: Design.
Group M3 Jacob Thomas Nick Marwaha Craig LeVan Darren Shultz Project Manager: Zachary Menegakis April 11, 2005 MILESTONE 12 Final LVS & Simulation DSP.
M3 Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage IX: March 30 th 2004.
M3: ProDiver 525 Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 9 Mar 29 Chip Level Simulation Overall Project.
Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
M3: The Pro-Diver 525 Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Design Manager: Steven Beigelmacher Stage 11: Mini-
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis April 4, 2005 MILESTONE 11 LVS & Simulation DSP 'Swiss.
M3: ProDiver 525 *Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 2 Feb 04 Size Estimates/ Floor Plan Overall.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel.
Viterbi Decoder: Presentation #2 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage VIII: March 24 th 2004.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 8: March 24th Chip Level Layout Overall Project Objective: Design an Air-Fuel.
Sprinkler Buddy Presentation #8: “Testing/Finalization of all Modules and Global Placement” 3/26/2007 Team M3 Kartik Murthy Panchalam Ramanujan Sasidhar.
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis March 23, 2005 MILESTONE 9 Chip level LVS DSP 'Swiss Army.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Viterbi Decoder: Presentation #6 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 5: 23 rd Feb Component Simulation Design.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 5: Feb. 18 th Component Layout Overall Project Objective: Design an Air-Fuel.
Viterbi Decoder: Presentation #1 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
Viterbi Decoder: Presentation #7 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 7: 1st Mar Component layout (corrected)
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 4: Feb. 11 th Gate Level Design Overall Project Objective: Design an Air-Fuel.
Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Camera Auto Focus Presentation 4, February 14 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
M3: The Pro-Diver 525 Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Design Manager: Steven Beigelmacher Final Presentation.
Viterbi Decoder: Presentation #4 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Mon. Nov. 24 Overall Project Objective : Dynamic Control.
GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Viterbi Decoder: Presentation #9 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 9: 29 nd Mar Chip Level Simulation Design.
Virtual Wallet Gates Winkler Yin Shen Jordan Fei Project Manager: Prajna Shetty /02/2009 A handheld device that saves time and money through smart.
Sprinkler Buddy Presentation #3: “System Level View and Floor Plan / Sizing” 2/07/2007 Team M3 Kartik Murthy Kalyan Kommineni Panchalam Ramanujan Sasidhar.
Team W3: Anthony Marchetta Derek R. Ritchea David M. Roderick Adam Stoler Milestone 1: Jan 21 st Project Proposal Overall Project Objective: Design an.
Alpha Blending and Smoothing
EE115C – Winter 2009 Digital Electronic Circuits
EE216A – Fall 2010 Design of VLSI Circuits and Systems
A 200MHz <insert E #>pJ 6-bit Absolute-Value Detector
Presentation transcript:

M3: ProDiver 525 *Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 9 Mar 29 Chip Level Simulation Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions sickness and lung overexpansion. Design Manager: Steven Beigelmacher

M3: ProDiver 525 Status Schematic Verification (done) Schematic Verification (done) LVS LVS –PressureCalc(done) –timetoflight (done) –timeleft (done) –ascensionWatch (done) –getK (done) –safetyWatch (done) –maxDepth (done) –bottomTime (done) –Top (done) Spice Entire Chip (6 out of 8 modules) Spice Entire Chip (6 out of 8 modules)

M3: ProDiver 525 Verilog Verification (gate level) MATLAB: depthvector = [80*ones(1,60*35) 40*ones(1,60*20) 0*ones(1,60*40)]; [bodyvector,out]=pressurecalculator(depthvector); bodyvector(60*35): ans = bodyvector(60*55): ans = bodyvector(60*95): ans = SCENERIO: diver goes 80 feet for 35 min, 40 feet for 20 min, 0 feet for 40 min VERILOG: time= 2,safetywatch = 0 Test where the user will go down to 80 feet for 35 minutes, then 40 feet for 20 minutes, then 0 feet 40 minutes time= 6090,safetywatch = 1 time = 6305,pres=25,depth= 80 time= 9054,safetywatch = 2 time = 9908,pres=28,depth= 40 time= 10272,safetywatch = 1 time= 12165,safetywatch = 0 time = 17110, pres=18,depth= 0

M3: ProDiver 525 Top Level Schematic

M3: ProDiver 525 Internal Routing

M3: ProDiver 525 Top Layout

M3: ProDiver 525 Summary of Design Characteristics Final area203*151=30653 Transistor Count10110 Transistor Density Aspect Ratio

M3: ProDiver 525 Why Modular Spice Simulation Strategy ? Due to the large no. of edge cases, this simulation strategy gives us greater accuracy than a single global vector set would Due to the large no. of edge cases, this simulation strategy gives us greater accuracy than a single global vector set would Testing time for global testing is unfeasible because it takes on the order of 150 clock cycles to cause some outputs to change Testing time for global testing is unfeasible because it takes on the order of 150 clock cycles to cause some outputs to change This is quicker and allows us to better focus our energies This is quicker and allows us to better focus our energies

M3: ProDiver 525 Spice Simulation Strategy Used vector sets from the verilog verification Used vector sets from the verilog verification Tested the edge cases Tested the edge cases In order to decrease testing time, we brought lower order bits out of the modules (shows seconds as well as minutes, and uses fractions of a pressure unit) In order to decrease testing time, we brought lower order bits out of the modules (shows seconds as well as minutes, and uses fractions of a pressure unit)

M3: ProDiver 525 Bottom Time Inputs

M3: ProDiver 525 Bottom Time Outputs

M3: ProDiver 525 Get K Inputs

M3: ProDiver 525 Get K Outputs

M3: ProDiver 525 Max Depth1 Inputs

M3: ProDiver 525 Max Depth1 Outputs

M3: ProDiver 525 Max Depth2 Inputs

M3: ProDiver 525 Max Depth2 Outputs

M3: ProDiver 525 PressureCalc: case X=0; Y=0

M3: ProDiver 525 PressureCalc: 2 nd set of inputs x=0,y=0

M3: ProDiver 525 PressureCalc outputs: x=0, y=0

M3: ProDiver 525 PressureCalc 2 nd set of outputs: x=0, y=0

M3: ProDiver 525 PressureCalc: x=0 y=1

M3: ProDiver 525 PressureCalc: 2 nd set of inputs - x=0 y=1

M3: ProDiver 525 PressureCalc Outputs: x=0, y=1

M3: ProDiver 525 PressureCalc 2 nd set of Outputs: x=0, y=1

M3: ProDiver 525 PressureCalc: x=1, y=0

M3: ProDiver 525 PressureCalc: 2 nd set of x=1, y=0

M3: ProDiver 525 PressureCalc Outputs: x=1,y=0

M3: ProDiver 525 PressureCalc 2 nd set of Outputs: x=1,y=0

M3: ProDiver 525 PressureCalc: x=1,y=1

M3: ProDiver 525 PressureCalc: 2 nd set of inputs x=1,y=1

M3: ProDiver 525 PressureCalc Outputs: x=1,y=1

M3: ProDiver 525 PressureCalc 2 nd set of Outputs: x=1,y=1

M3: ProDiver 525 SafetyWatch

Clock Speed Critical Path – From the depth input through pressureCalc, then through safetywatch, and out to the safetywatch output signal Critical Path – From the depth input through pressureCalc, then through safetywatch, and out to the safetywatch output signal Estimated Final Clock Speed 1Hz Estimated Final Clock Speed 1Hz

M3: ProDiver 525 Critical Path Layout

M3: ProDiver 525 Spice glitch **error**: only 1 connection at node 29:318 **error**: only 1 connection at node 29:318 Correction: a floating unconnected wire in the design Correction: a floating unconnected wire in the design

M3: ProDiver 525 Power Consumption Strategy to test power consumption – test the effects of several different power levels on the module in order to find the lowest at which it still works. Strategy to test power consumption – test the effects of several different power levels on the module in order to find the lowest at which it still works. Also, we want to see if making any optimizations to the layout to decrease power consumption Also, we want to see if making any optimizations to the layout to decrease power consumption

M3: ProDiver 525 Questions?