GLAST LAT ProjectDOE Rebaseline Review, February 13, 2005 1 GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.

Slides:



Advertisements
Similar presentations
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Advertisements

GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
GLAST LAT ProjectGSFC Monthly, 5 January 2005 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
Software Engineering Institute Capability Maturity Model (CMM)
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
Effective Methods for Software and Systems Integration
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Server Virtualization: Navy Network Operations Centers
From Research Prototype to Production
GLAST Large Area Telescope:
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
Pre-Project Components
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
Introducing Project Management Update December 2011.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
Project management Topic 7 Controls. What is a control? Decision making activities – Planning – Monitor progress – Compare achievement with plan – Detect.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectDOE/NASA Stratus Review, March 30 & 31, 2004 Systems Engineering 1 GLAST Large Area Telescope: Pat Hascall SLAC System Engineering Manager.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectGSFC Monthly, 24 May 2005 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
March ’05 Face to Face Meeting Introduction
Introduction and Overview
GLAST Large Area Telescope:
Overview Cost to Complete
DOE Review of the LCLS Project October 2006
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer Gamma-ray Large Area Space Telescope System Engineering Project Controls Risk management

GLAST LAT ProjectDOE Rebaseline Review, February 13, System Engineering Coordination & tracking of LAT instrument requirements, subsystem designs, tests, and test interfaces. Functional and performance testing of LAT not covered in subsystem plans; includes system trades & audits, concept of operations, and development of system metrics. Audit efforts related to maintaining, certifying, tracking and reporting on parts. Risk analysis of the LAT instrument and ground systems. Maintain documentation and data libraries Manage configuration of the instrument and ground systems.

GLAST LAT ProjectDOE Rebaseline Review, February 13, Project Controls Provide project control to maintain instrument project master schedule and budget. Track actual costs and schedule performance of all subsystems and institutions Analyze performance via the Project Management Control System (PMCS). Develop and maintain tools to track progress on the end game on a weekly basis Prepare reports for project management and funding sponsors. Develop and implement approved changes in the baseline plan.

GLAST LAT ProjectDOE Rebaseline Review, February 13, Deliverable Risk Assessment DAQ cost & schedule delivery risk is driven by three factors: Flight Parts: Unexpected parts inspection failures or Government-Industry Data Exchange Program (GIDEP) alerts requiring late change in planned flight parts, new order for alternate parts, delay in box assembly or re-work of box. Box Assembly Delays: Box assembly subcontractors do not execute as required to achieve the delivery schedule. Box Test Failure: Unexpected failure of box qualification and/or acceptance tests requiring re-work and retest.

GLAST LAT ProjectDOE Rebaseline Review, February 13, Deliverable Risk Assessment Risk/RankDescriptionMitigation Flight Parts - Moderate BAE Rad750 CPU –Industry wide GIDEP. Internal heat-sinks to be re-worked. Omnirel regulator replacement Over 60 units industry wide with priority given to defense projects. SLAC need date is April 05, SIB EEPROM – Austin EEPROMs did not pass GSFC/NASA inspection. Review of part quality issues ongoing. SLAC need date is April RAD750 has GSFC Project emphasis - Alternate LOT identified Box Assembly Delays – Low Delivery is dependent on board level and box level assembly by subcontractors qualified to fabricate space flight quality hardware. General Technology Corporation: TEM and TPS. Aeroflex : PDU and GASU. Cicon: Harness construction. Remaining components are planned to be selected by March 05 - On site quality inspector provides daily insight - Regular reporting milestones - Senior management interface to ensure priorities maintained Box Test Failure- Low Failure of structural, thermal EMI/EMC, electrical or functional tests prior to completion of the fabrication effort is possible. Any significant test failure could result in schedule delay - Engineering model test program completed. - Lessons learned incorporated into flight design. - Test approach has been reviewed to ensure that an over-test condition does not occur

GLAST LAT ProjectDOE Rebaseline Review, February 13, LAT Top risks ID #Risk Rank Risk DescriptionRisk MitigationStatus Proj Mgt Moderate If ASICs fail to meet qualification requirements; then schedule impact will occur Focused review & test. Margin for re-runs protected where possible Individual risks Identified by subsystem Extensive use of DAQ test bed to drive out system issues Cal/ACD ASIC’s continued testing Test Bed operating No new issues Proj Mgt Moderate If TEM Power supply fails qualification; then final implementation may exceed schedule impacting delivery to I&T Key focus item identified for DAQ TEM/PS extensive EM use as EGSE Implementation plan in place and proceeding Fuse audit completed Functional tests complete, environmental tests to be completed in February

GLAST LAT ProjectDOE Rebaseline Review, February 13, Top risks ID #Risk Rank Risk DescriptionRisk MitigationStatus SE-007Moderate If a critical component fails post LAT integration; then de- integration will result in cost & schedule impact Extensive use of EM test bed to support flight H/W & S/W development Thorough qualification and acceptance tests Pre planned I&T actions for de- integration Qual & acceptance planning in-place I&T developing re- work contingency plans. Integration plan baselined Elec- 004 Moderate If target hardware, requirement development or manpower is delayed; Then Flight-Software development schedule will be impacted Detailed incremental development program Ensure sufficient software test on target hardware during development to drive out any requirement disconnects. Include adequate peer reviews before each spiral cycle prior to release Include monthly Demos to verify functionality/measure progress Adapting monthly demos Tracking EGSE resource utilization Updated detailed test plan released Demo frequency increased from monthly to approximately weekly

GLAST LAT ProjectDOE Rebaseline Review, February 13, Top risks ID #Risk Rank Risk DescriptionRisk MitigationStatus Proj Mgt Moderate If parts and vendor orders are delayed or bids exceed expectations; then flight production costs & delivery schedule will be impacted Manufacturing engineer added to expedite minimum cost closure Clarification and purchase package review to ensure accurate bids Increase production management staff Purchase order tracking/monitoring system in place to highlight roadblocks Design documentation release plan prioritized by vendor selection and component fabrication need dates Workarounds implemented for late parts Hired additional head to manage production IT Moderate If logistic or facility integration issues are found during LAT environmental test program; then re-work will delay schedule LAT I&T to plan a roadmap of activities from LAT building 33 to completion of environmental testing LAT I&T to consider and develop opportunities to path find key activities required prior to LAT shipment to NRL Follow up Environmental Planning TIM held on 1 October at SLAC, I&T driving AIs to conclusion Continuing periodic TIMS

GLAST LAT ProjectDOE Rebaseline Review, February 13, Managing schedule Detailed list of milestones is posted on the website Progress toward these milestones is monitored weekly Detailed production schedules are also on the website Manufacturing engineer reports the progress against those schedule to the Project Manager twice a week. The Project Manager contacts senior management at the vendor when significant deviations are detected