Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group.

Slides:



Advertisements
Similar presentations
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
FPGA Process Flowchart Backup. FPGA Configurability Basis of configurability – Nature of transistor based FPGA Physical limitations – Through header on.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 27 May Sam Burke UCSB HEP Group.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 25 August 2003 Sam Burke UCSB HEP Group.
Status of UCSB LT Testing All 10 slots are equipped with UTRI, PAACB and adapter boards. All 10 UTRI connected to multiplexer. All 10 slots have HV connections.
Slide 1UCSB CMS Weekly Status MeetingCMS Tracker Rod Filters Sam Burke EE Rod Power Line Low-Pass Filter Study 3 August 2004 Sam Burke UCSB HEP Group.
May 13, FNAL Hybrid Thermal Test Status  Hybrid Thermal Test Procedure  Test Results Eva Medel FNAL CMS Group June 22, 2004.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 11 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 3 November 2003 Sam Burke Lance Simms.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Failures 3 September.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier Cooling Loop 20 September 2004.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Tracker Week April ‘03G.Sguazzoni1 FE hybrid assembly and quality assurance The hybrid team: Alan Honma, Michael Poettgens, Gabriella Pasztor, Bernd Reinhold,
6/22/04 Slide 1 Hybrid Testing Status Lance Simms 6/22/04.
Laboratory 5: Introduction to LabVIEW. Overview Objectives Background Materials Procedure Report / Presentation Closing.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 23 June Sam Burke UCSB HEP Group.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 20 May Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 10 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status Peltier T/E Element Degradation 28.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 17 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS Tracker Rod Filters Sam Burke EE Rod Power Line Low-Pass Filter Study 3 August 2004 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 18 August 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status 3 June Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 14 July 2003 Sam Burke UCSB HEP Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
“Introduction of the software for the thermal tests” Ioannis Kossyvakis (University of Patras, Greece) Mateusz Sosin (CERN) 19/09/2011.
Team Members Jordan Bennett Kyle Schultz Min Jae Lee Kevin Yeh.
Engineer Training Electronic System Overview. Engineer Training XL1500 Electronics Confidential 2 XLjet Electronics The XL1500 Electronic System consists.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Verigy V93000 Service Training
Linac Marx Modulator Update Trevor Butler 5/20/2015.
Interlock System Equipments for Conventional Magnets PP a-ABT_interlock conv mag.ppt October 22, 2015 Anthony Beaumont Interlock System Equipments.
Hardware Training Product: ITMS2.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 4-Hybrid Thermal Test System Status Sam Burke UCSB HEP Group.
Status of the PSD upgrade - Status of production of new temperature, HV control systems MAPD gain monitoring system. -Status of the PSD temperature stabilization.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
Subsystem Design Review P16203 Andre Pelletreau, Kerry Oliviera, Jeremy Willman, Vincent Stowbunenko, Kai Maslanka.
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
Slide 1 UCSB CDMS Group Neutron Trigger. Slide 2 UCSB CDMS Group Neutron Trigger PROGRESS: à Electronics Fabrication Complete for SN1 à Simulation Work.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Introduction to LabVIEW
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Fish Tank Project Introduction ME 121Portland State University Mechanical and Materials Engineering.
S A Griffiths CM42 June 2015 Electrical & Control.
Brooks Expert Support Tool (BEST) Software
MICE RF System Power Supplies, Control and Monitoring Status report
ROD assembly and test in US
UCSB Testing Status Anthony Affolder
On behalf of the US TOB testing group
First Assembled Rod in US
Operations/Failure Analysis
Operations/Failure Analysis
ACOE347 – Data Acquisition and Automation Systems
Equipment Status ARCS equipment status DAQ equipment status
Introduction to LabVIEW
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 30 June Sam Burke UCSB HEP Group

Slide 2UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Measured Relative Humidity with System Sensor using sub vi (subroutine) à RH = % with System à RH = % with Sensirion Reference Fabricated Analog Input/Output Board à (photo later) Fabricated Sensor Input/Output Board à (photo later)

Slide 3UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Generated Sensor Interconnect Schematics à Air Flow Sensor à Peltier Power Source Constant Current Control Received dc/dc converter for flow sensors à from 5 vdc on Analog I/O Bd. à Acceptance testing unit [ie. Verify Vo = f (load)] Reverse Engineering on Coolie Box Relay Board

Slide 4UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Coolie Box AC Power Transformer Board Fabricated. Fabricated four Hybrid Temperature Sensors à Digital addressing à Calibration check à LabView Sensor File created

Slide 5UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE CERN Cold Box Note Following Details à Antenna à Humidity Sensor à Hybrid + Pitch Adapter à Foam Insulation

Slide 6UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE CERN Cold Box Blue lines are N2 Clear lines are water Note Hybrid boxes with bar codes

Slide 7UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB Cold Box Note: à Sensor penetrations à Test Tail Interface à ARC Board à Hybrid/Pitch Adapter on plate à Humidity Sensor and cable à Temperature Sensor and cable

Slide 8UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB Cold Box

Slide 9UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB Cold Box PENITRATIONS à 1.T/E Power + à 2.T/E Power - à 3. T/E High Temp à 4. Hybrid 1 Temp à 5. Hybrid 2 Temp à 6. Hybrid 3 Temp à 7. Hybrid 4 Temp à 8. Humidity à 9. Pulser (RG58) à 10. Spare à 11. Water IN à 12. Water Out à 13. Dry Air Low à 14.Dry Air High

Slide 10UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Sensor Interface SENSOR Interface Board (left) à 4ea Hybrid Temps à Box Humidity à High Temp Interlock ANALOG I/O Board (right) à Air Flow Sensor à Water Flow Sensor à Peltier Current Control Output

Slide 11UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Sensor Interface Backside of Analog Input/Output Board

Slide 12UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Coolie Box Relay Board Bench Tested à Red LED (heat) à Blue LED (cool) à Schematic generated

Slide 13UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB Cold Box Equipment Hybrid Cold Box Equipment Rack in clean room test area à NIM Modules (pulser) à ARC Power Supplies à ARC Modules in crate with Coolie Controller à ARC Power Supplies à Peltier Constant Current Power Supply à Flow Control Panel (future)

Slide 14UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Coolie Controller New Back Panel à note high current connectors à high current connector pins à pin removal tool

Slide 15UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Flow Control Panel Note following components à Digital I/O board à Solid State Relays à Solenoid valves à Flow sensor

Slide 16UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Design and Fabricate Pitch Adapter Antenna Complete T/E Element Cabling Test T/E Element using Sub LabView Fabricate Flow Control Panel (see photo)