Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 14 July 2003 Sam Burke UCSB HEP Group.

Similar presentations


Presentation on theme: "Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 14 July 2003 Sam Burke UCSB HEP Group."— Presentation transcript:

1 Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 14 July 2003 Sam Burke UCSB HEP Group

2 Slide 2UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Flow Control Panel 95% Complete Completed 1st Pitch Adaptor Antenna à L=0.13” coupling distance Assembly of Cold Box 95% Complete

3 Slide 3UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Completed assembly of Relay Control Board à Schematic generated à Simple Peltier over heat interlock discovered Thermo-Electric Element Test (see vi gui) à ACDC VI Control à 15 deg C goal à 4min natural oscillation observed

4 Slide 4UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Flow Control Panel

5 Slide 5UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Flow Control Chassis

6 Slide 6UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Pitch Adapter Antenna à

7 Slide 7UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Antenna Detail 0.13” coupling distance from antenna to near pitch adapter traces

8 Slide 8UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Chiller Antifreeze required to prevent freezing of Peltier Water cooling lines during power failure. à If unit is powered down with cold box at -20 deg C the cooling water will turn to ice unless 50% solution of antifreeze is used. This will freeze at -34 deg C.

9 Slide 9UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 1st Cold Box System Test

10 Slide 10UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Add Temperature Sensor for Peltier Control Verify Flow sensor calibration Check à FR1001 Air 40 mL/min*volt +-3% 0-5v (on order) à FR1005 Air 0.40 L/min*volt +-3% à FR1011 Water 0.40 L/min*volt +-3%

11 Slide 11UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Calibrate UCSB Hybrid Cold Box à CERN Box is (18+20)/25min on cooling à CERN Box is (20+18)/3min on heating Study scale factors used in CERN vi Start writeup of Hybrid Test Procedures