Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October 09 2006.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Status of CMS CSC upgrade in LS1 Present CSC Status ME 4/2 project ME 1/1 project 5/20/2015 Petr Levchenko NEC 2013, Varna 1.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* EMU Meeting University of Florida 01/09/2004.
TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
US Some Preliminary Test Beam Results T. Ferguson, N. Terentiev*, I. Vorobiev CMS EMU Meeting Fermilab Oct , 2004.
US CMS Collaboration Meeting, UC Riverside, May 19, Endcap Muons John Layter US CMS Collaboration Meeting May 19, 2001.
TMB and RAT Status Report Endcap Muon OSU April 16, 2004 Yangheng Zheng University of California, Los Angeles  TMB Status  RAT Status.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Stan Durkin.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
US FAST site EMU CSC test results – a global view from ROOT N. Terentiev (Carnegie Mellon University) Fermilab July 23, 2004.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* EMU Meeting University of Florida 01/09/2004.
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
US FAST site test results – a global view from ROOT T. Ferguson, A. Korytov, N. Terentiev* CMS EMU Meeting The Ohio State University April 16 – 17, 2004.
S. Durkin, USCMS-EMU Meeting, Oct. 21, 2005 Critical Data Errors S. Durkin The Ohio State University USCMS EMU Meeting, FNAL, Oct. 20, 2005.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
CMS Emu Meeting, Dec. 6, Electronics Long Term Operations What we learned from Electronics Commissioning G. Rakness U.C.L.A. Dec 6, 2008.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
Status of the CSC Track-Finder Darin Acosta University of Florida.
CMS Muon System Guenakh Mitselmakher University of Florida
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
1.2 EMU Electronics L.S. Durkin CMS Review CERN, September 2003.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
T.Y. Ling EMU Meeting CERN, September 20, 2005 Status Summary Off-Chamber Electronics.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
10 th LECC Workshop, September 2004, Hauser et al.1 Experience with Trigger Electronics for the CSC System of CMS J. Hauser*, E. Boyd, R. Cousins,
S. Durkin, Software Review, March 16, 2006 FED Library S. Durkin The Ohio State University CSC Online Software Review, March 16,2005.
Dick Loveless Upgrade report 12 Oct EMU Upgrade Report Dick Loveless University of Wisconsin 12 October 2012.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
EMu Slice Test -- Status Frank Geurts FNAL/Rice
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
6-Dec-05PC Commissioning1 Peripheral Crate (PC) Commissioning Status Fred Borcherding, CSC/EMU Group.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
University of Wisconsin
Timing/Synchronization Status
University of California Los Angeles
Colliding Beams Group Involvement In CMS (see also M
EMU Slice Test Run Plan a working document.
ALCT Production, Cable Tests, and TMB Status
University of California Los Angeles
University of California Los Angeles
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Primitives Test Beam Studies
University of California Los Angeles
TMB and RAT Status Report
B904 Status Report by Fred B.
Fred’s Input to Rice Workshop
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
Plans for the 2004 CSC Beam Test
CSC Status Report Status reports;
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
CSC Electronics Problem Report CSCE I&C
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October

Start of CSCs installation The installation of cathode strip chambers started in June 2003 Installation of the first chamber on an iron disk. The chambers were installed layer by layer and then were cabled.

432 CSCs have been installed including 72 Dubna chambers

Installation of the ME+1/3 chamber 36 ME-1/3 CSCs need to be installed

CSC’s Readout Electronics CSC CFEB ALCT 1 of 24 CFEB 1 of 2 LVDB AFEB CFEB ALCT MPCMPC DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB CCBCCB VMECONTROLLERVMECONTROLLER Peripheral Crates (on iron disks) DCS TTC Crate Track Finder Crate Readout Data FED Crates (in USC55) in USC55 TMB-RAT DMB CCB MPC DDU DCC 1 of 5

38 Peripheral Crates (out of 60) have been installed

MTCC PC commissioning on + side

Portable set-up for CSC commissioning

4 – AFEB analog noise & threshold 2 – Anode connectivity 5 – SCA noise 3 – Cathode connectivity 1. Slow Control V/I 6 – Comparator noise 7 – Comparator logic 8 – Chamber noise at nominal HV List of CSC Tests It takes usually 4-6 hours to test one chamber in perfect conditions It can take a number of days to find a problem, eliminate it and retest the chamber in question

Skew-clear cable revision problem 1.It was found that we have two type of skew clear cables: Production Revisions A and B - have delay 4.7 ns/meter Production Revisions C and D – have delay 5.2 ns/meter 2.They differ in terms of data transfer capability:

Chamber noise problem 360 Hz 590 Hz Each th installed chamber needs training either at 3.8 kV or with reverse HV at kV. Training of chambers with reverse HV polarity helped in most cases. Two chambers had to be replaced because the training didn’t help ME+2/2/ ME+4/1/ Noisy channels

Unexpected cross-talks ME-3/2/ ME+3/2/ Test pulse was sent to the test strip of the plane #3 Test pulse was sent to the test strip of the plane #4

AFEB problems 1ME+3/2/15-051AFEB#21Flaky behavior of ch #53 pl #5 2ME-3/2/12-110AFEB#7Dead channel #17 in plane #2 3ME+2/2/30-130AFEB#12Dead channel h#29 in plane #6 4ME+3/1/11-017AFEB#27Dead channel #65 in plane #5 5ME+2/2/26-070AFEB#19Dead channels #49-50 in plane #2 6ME+3/1/03-026AFEB#23Dead channel #61 in plane #4 7ME+2/1/06-018AFEB#7Dead channel #21 in plane #2 8ME-4/1/15-021AFEB#14Channel 33 in plane 3 showed efficiency 55% 9ME-4/1/12-035AFEB#12Channel #28 in plane 5 showed efficiency 60% 10ME+3/1/12-028AFEB#15Dead channel #27 in plane #6 Test pulse was sent to the test strip of plane #2 2 AFEB were replaced (one needs threshold < 0, second one had large crosstalk ME-1/2/16 – two wire groups in the plane #6 have a short ME-2/1/09 – one AFEB shows unstable behavior (2-9 channels cab be dead) Slice test CSC

Three types of CSC electronics noise observed RMS of SCA pedestals AFEB threshold noise Mostly seen in planes 3, 4, 5 Mostly seen in planes 1, 2, 6 So far seen in planes 1, 3, 5

Proposed aluminum shield

Possible source of CFEB noise Our LV power supplies can be a source of the CFEB noise. LV cable jackets connected to a crate with LV power supplies causes CFEB noise in some chambers. There are 3 types of chambers: Good Acceptable Noisy

CFEB noise of ME+2/2/28 MTCC, DQM results for Global run 2599 CSC commissioning set-up, Sep 08 Our set-up sees less CFEB noise level

Summary of replacements 5 boards had mechanical damages: –LVDB – broken input connector –LVMB – broken switch –ALCT – broken input connector –CFEB – broken latch, input connectors 20 CFEBs were replaced: a. 14 CFEBs – dead channels, low response to the test pulse, no comparators, no data, … b. 6 CFEBs - by mistakes 5 LVMB – read wrong currents 5 ALCT: a.four boards had 1.8 V fuse burnt out b. one board couldn’t been readout 9 cables: a. one DMB-LVDB was damaged b. eight skew clear cables 4 CSCs: a.two chambers couldn’t hold HV > 2.7 kV b.two chambers had unacceptable level of noise

Summary table of known problems DiscInstalledCommissionedProblemsPlane Cross- talk AFEB Cable probl LVBD- LVMB AFEB ch dead, short CFEB Noise YE YE YE YE+1 72 YE YE Must be repaired - Can be fix, but needs board replacement or taking a chamber down - Can be ignored

Boards in Peripheral Crate (PC) MPCMPC DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB DMBDMB TMBTMB CCBCCB CONTROLLERCONTROLLER Data acquisition Motherboard (DMB) VME Crate Controller (VCC) Trigger Motherboard (TMB) and RPC-ALCT Transition module (RAT) Muon Port Card (MPC) Clock & Control Board (CCB) 60 Peripheral Crates for CSC’s in Total.

Lists of new boards and tests 1.Crate Controller CCB MPC DMB TMB RAT PCRB -1 8.MPCB Back plane Timing of ALCT Rx and Tx 2. Timing of CFEB Rx 3. Wire scan 4. Strip comparator scan 5. TMB test 6. DMB test 7. TMB-MPC test 8. TMB-RAT self test FAST site tests (calibration)

Peripheral crate commissioning report 1.There was not comparator data from CFEB #2 of ME+1/2/35 chamber. 2.The low voltage control cable on ME+1/2/36 chambers didn’t work. 3.The ALCT fuse on 1.8 V power line of ME-4/1/11 burnt out. 4.Two CFEB-DMB skew-clear cables were swept.

PC commissioning summary 62 PC have been assembled and tested in ISR before shipping to SX5 for final installation 38 PC have been installed filled up with electronics and cabled 24 PC passed through the first stage of the commissioning The first stage of installed PC commissioning on minus side has started (3 PC have been commissioned).

User Interface  Instructions Traveller Summary Table AFEB Thresholds Test-B Database

Our plans for Commissioning of 36 ME-1/3 chambers which are going to be installed in November-December Fix the problems on as many CSCs as possible before they go down the shaft. 3.Installed most of the Peripheral Crates, fill them up with electronics, and hook up skew clear cables. 4.Finish first stage of Peripheral Crate commissioning before disks are moved down the shaft. 5.Redesign set-up for PC commissioning (add FED crate and TTCVi crate. 6.Develop the software for CSC calibration using PC control and readout. 7.Develop a database for storage the results of the tests. 8.Commissioning new set-up for PC and on-chamber electronics test.

Plans on PC commissioning and integration with CSCs. 2.PC and CSC integration with XDAQ. 3.PC and CSCs integration with cross- DAQ (DQM).

M&O of CSC system Full calibration of CSC and CSC’s electronics. 2.Using particles coming from interaction point make calibration of: I.HV sectors (18 for small CSC and 30 for big ones) II.Time adjustment of ALCT delays for precision BX III.Trigger time adjustment of CSC in PCs IV.ALCT-CLCT trigger time decision for the chambers in PCs 3.M&O of the system: –Control and monitoring CSC performance –CSC repair –Failed board replacement –Participation in data taking runs – shifts on duty