Report to JMPB Topics: Progress Hall Clearance Programme Hall Layout Beam Line RF Power System MICE Management Structure Common Funds 14 th October 2003.
Advertisements

“Aggressive schedule” seen by MJPB (just for WP1) (incl. VAT) Needed to be aggressive to meet 2005/6 shutdown….
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
January 14, 2004 TJR - - UPDATED 1/25/04 1 MICE Beamline Analysis Using g4beamline Including Jan 25 Updates for Kevin’s JAN04 Beamline Design Tom Roberts.
Technical Coordinator’s Report (KL for PD) Solenoid problems & Schedule Actions on –KL/CN: plan for work to December shutdown –KL/CN: plan for work in.
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Upstream PID Review Alan Bross MICE CM 16 October 12, 2006.
1 paul drumm; ; FAC-PR MICE Project Status Funding Agency Committee 19 th September 2005.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
Paul Drumm 9 Feb 2004 MICE at RF system: power source, distribution Paul Drumm RAL Ambitious title!
1 On MICE Coordinate System Yury Ivanyushenkov RAL MICE Collaboration CERN, 29 March - 2 April 2004.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Paul Drumm 30 March 2004 MICE at RF Power System: power source, distribution Paul Drumm RAL Ambitious title!
1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.
K. Long, 26 June, 2015 Phase II: introduction to discussion Background (reminder) Responses Assumptions Presently planned bids Input to summary table Summary.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
UK Funding PPRP Meeting on Monday 30 th June Accepted need for urgent work this year –no discussion on this –but also no indication of the level of funds.
1 paul drumm; ; FAC-PR MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Paul Drumm 25 March 2004 MICE at Project Report CERN Collaboration Meeting 29 March 2004.
May 12, 2004 TJR1 Effects of Downstream Iron Shield Position on MICE Good- Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
K. Long, 10 October 2015 Project Manager’s report Status/progress since CM18 Looking forward Organisation Conclusions.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
MICE CM in New York Alain Blondel, June MICE COLLABORATION Columbia University June 2003 Action List (online) 1.Funding and some organization.
MICE CM at OSAKA Alain Blondel, August MICE collaboration meeting at OSAKA (thanks to Mike Zisman, Makoto Yoshida, and Koji Yoshimura)Mike ZismanMakoto.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards.
1 Layout and Installation MICE Collaboration Meeting, RAL, October 27-29, 2004 Elwyn Baynham, Tom Bradshaw, Paul Drumm, Matthew Hills, Yury Ivanyushenkov,
1 MICE Mtg Oct 2002 Elwyn Baynham RAL Implementation of MICE at RAL Work done in Engineering and ISIS Departments Rutherford Appleton Laboratory Contributors.
1 Forces Yury Ivanyushenkov RAL. 2 Goal: find maximal (static and dynamical) possible forces in MICE magnetic system. Method: calculation of axial magnetic.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
Overview of HINS Operations and Radiation Shielding Considerations in the Meson Detector Building Bob Webber August 16, 2006.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.
MICE RF Power Status Paul Drumm ~ Sunday August 1 st 2004.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
MICE VC Alain Blondel, April MICE exectutive board met on 1 April 2004 after the collaboration meeting and remarked the very large amount of.
MICE CM31 Schedule summary
MICE PM Report Progress with the Infrastructure A few problems
Introduction Jason Tarrant – Integration Engineering Step IV Removal
Presentation transcript:

MICE Project Report Paul Drumm ~ Sunday August 1 st 2004

Absorber FNAL – MuCool RF-Cavity & Coupling Coil – MuCool RF Power Source Design Safety Review - Responses Cryo cooler implementation –Sign off on this? Work in MICE hall – Completed plan WBS – Schedule & Costs –Involves few people – but needs review… Progress since CERN CM8

Technical ISSUES for Now Cryo coolers –Appropriate for MICE? –Appropriate for a NF –Consequence to use of Liquid Helium Shielding Downstream of MICE –Larger gap; reduced forces; bigger detectors –Can we sign off on this? Shielding of MICE tracker –Positive moves – benefits to optics, coupling & forces (although forces are larger)

Technical ISSUES for Next CM Layout in hall –Alignment & Fixation – compatible with… Force Distribution & Control Staging of MICE Opened up the understanding of the optics –Does MICE do what we want? proposal; MICE notes 49, 83…

ISIS Schedule Significant issue since March has been a change in the ISIS shutdown schedule ISIS normal “long” shutdown is a few weeks 6 month shutdown in ’04 current –300  Amp upgrade –Installation of ISIS RFQ Next long shutdown moved into ’06 –Beam line to TSII Mid

2004 Shutdown

Engineering Schedule - Funding Driven Factors not yet Known/applied

Cost Estimates From WBS in round numbers £2.3M £3.2 £5.0 £6.5 £7.3 £9.6 £11… “with additional costs ~£24M ”

NOTES WBS –At some point will need to be reviewed –At that time, we will need to look at the provenance of the information & the assumptions behind the contingency TRD –Available on web since CM8 –Not polished to the point of publication but is as complete as can be; useful reference; –Review/Revise for October CM10 GW2 in mind - INFN… - NSF&DOE

And Finally Cryo coolers Shielding Downstream of MICE Shielding of MICE tracker MICE Beam Optics Force Distribution