Carnivorous Ninja Warriors Final Presentation Katie Brissenden, Kat Bryant, Cam Comeau, Aram Podolski, Hannah Williams December 1, 2009.

Slides:



Advertisements
Similar presentations
Team K^3 + C Final Team Presentation Khin Oo, Kim Gleffe, Carlie Bolin, Katelyn Harder AEM /16/11.
Advertisements

Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Clean Air Project: Team Big Green SpaceGasm Final Presentation Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong.
Space Debris Conceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth
Clean Air Project: Team Big Green SpaceGasm Launch Readiness Review Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin.
Team 7, Final Presentation December 1, Mission Overview Send up petri dishes containing bacteria Analyze the effects of temperature, pressure, and.
Brynn Larson Trey Karsten Terek Campbell Marcus Flores Marcell Smalley Shunsuke Miyazaki 2015/6/10 Team Ochocinco.
Supernova Brigade Final Presentation Amanda Kuker, Michael Lotto, James Bader, Jordan Dickard, Blake Firner, Diana Shukis Rev
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Space Monkeys Final Presentation Michael Bartek, Jacob Blakely, Katelynn Finn, Katie Fletcher, Lance Markovchick, Michael Skeen, Thomas Snow Fall.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Team Name Final Presentation Team Members Date Fall 2010 Rev A
Team R3D3 Final Presentation Devon Campbell Greg McQuie Kate Kennedy Henk Wolda Marisa Antuna Nicole Ela Tyler Smith 12/1/11.
Team Helios. Mission and Experiment Mission: Launch a balloonsat to determine the light filtering effect of the atmosphere and test the effectiveness.
Carnivorous Ninja Warriors Critical Design Review Cameron Comeau, Katie Brissenden, Kat Bryant, Arley Hendrick, Aram Podolski, Hannah Williams 06OCT2009.
Teamo Supremo Final Presentation Kristen Brenner Kim Fornall Ahna Isaak Nick Martinez Wes Roos Bart Tofany RevD
Team Thumbs Up Launch Readiness Review Nick Lenk Eddie Cyrus Brian Inglis Chase Prichett Greg Nelson Jake Varey 11/11/08.
Chouinard, John Getz, Jennifer Hewitt, Lisa Kim, Elise Salmons, Patrick Silva-Ortiz, Carlos.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn December 7, 2006.
Space Debris Critical Design Review Cole Bostrom Corey Godwin Jonathon Kirchmaier Emily Logan Sean Murphy Seanna Renworth October 14, 2008 Fall 2008 Rev.
Final Presentation Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani December 5, 2006.
Carnivorous Ninja Warriors Launch Readiness Review Katie Brissenden, Hannah Williams, Aram Podolski, Kat Bryant, Arley Hendrick, Cam Comeau November 5,
GONS Final Presentation Steven Benedict Jake Danser Josh Hecht Brock Kowalchuk Erik Shuttlesworth Matthew Zemel December 4, 2007 Steven Benedict Jake Danser.
Team Name Final Presentation Team Members Date Rev
Skillz That Killz Team 3 Conceptual Design Review Travis Dowdy, Jocelyn Mulkey, Hunter Hoopes, Taylor Smith, Kaitlyn Zimmitti, Jess Davidoff September.
Cydonia Final Review Presentation 6 December 2007 Greg Rancourt, Sarah Flinn, Dominic Boiko, Kevin Stuth, Derek Houtz, Max LaFon.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Team Hubble Jr. Final Presentation Rachel Small, Holly Zaepfel, Ryan Del Gizzi, Kyle Norman, and Evan Levy December 5, 2006.
Echo  Final Presentation Andrew Berg, Shawn Carroll, Cody Humbargar, Jade Nelson, Jared Russell, Austin Williamson
JAKE BINNEY JAMEY GRAHAM LOUISE MARTINEZ JACK OAKES MARCUS RAHIMPOUR ERIN TUCKER JAKE BINNEY JAMEY GRAHAM LOUISE MARTINEZ JACK OAKES MARCUS RAHIMPOUR ERIN.
Team Dionysus Launch Readiness Review Elise Kowalski, Michael Beach, Josh Tiras, Chris Konciljia, Alijah Smith, Becca Seigel November 5, 2009.
CDR Presentation. - Team T.E.N.’s objectives are to fly Ralph with all the systems functioning properly. This includes the boom arm, radiation badge,
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
SPIRIT of the Koala Project VOLT Critical Design Review Anthony Anglin, Colin Harkins, Dylan Cooper, Thomas Jefferies, Starteya Pais, Joao Mansur, Andrew.
Dionysus Final Presentation 12/01/09 Alijah Smith Josh Tiras Chris Koncilja Mike Beach Elise Kowalski Becca Seigel.
Hang Seven Launch Readiness Review Lucas Migliorini, Becca Lidvall, Paul Smith Chase Goodman, Ethan Hollenbach, Nikhil Desai, Abby Caballero, Sierra Williams.
Team Victorious Secret Final Presentation Crawford Leeds Jacob Broadway Tanya Hardon Devan Corona Dylan Reed November 29, 2011.
Team Hang 7 Final Presentation Lucas Migliorini, Sierra Williams, Chase Goodman, Ethan Hollenbach, Becca Lidvall, Abby Caballero, Paul Smith, Nikhil Desai.
Hang Seven Critical Design Review Sierra Williams, Lucas Migliorini, Abby Caballero, Chase Goodman, Paul Smith, Becca Lidvall, Ethan Hollenbach, Nikhil.
James Bader, Jordan Dickard, Blake Firner, Amanda Kuker, Michael Lotto, Diana Shukis
Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya 5 November, 2009.
Team Up, Up, and Away Final Presentation Trevor Arrasmith, Ty Bailey, Cameron Coupe, Samuel Frakes, Brandon Harris, Carolyn Mason, Soo Park, Peter VanderKley.
Chelsea Welch Beth Moger Colin Nugen Anthony Cangelosi Tully Baetz Charles Hartman December 1, 2009.
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Patrick O’Brien, Sara Monacelli, Tiffany Monroe, Madison Wiebe, Andy Broucek, Jacob Haynes 11/30/09.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.
Team Magnaritaville Final Presentation Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya December 1, 2009.
Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung Fall 2011 Rev C
Junk in a Box Final Presentation Frank Becky, Kyle Cummings, Jordan Haines, Villiam Klein, Matt Peoples, Ryan Scott and Aaron Young 4 December 2007.
Space Monkeys Conceptual Design Review Project Curious George Michael Bartek, Jacob Blakely, Katelynn Finn, Katie Fletcher, Lance Markovchick, Michael.
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
Skillz That Killz Critical Design Review Jocelyn Mulkey, Jess Davidoff, Kaitlyn Zimmitti, Taylor Smith, Travis Dowdy, Hunter Hoopes October 8, 2009.
Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong 05 October 2010.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Panoramic Rays Final Presentation
Mission Statement... The Space Wolverines will;
Brandi Casey Lee Wilson
Team S.H.I.E.L.D. Final Presentation
Skillz That Killz Team 3 Final Presentation
Team Thumbs Up Final Presentation
S^3 Launch Readiness Review
Clean Air Project: Team Big Green SpaceGasm Conceptual Design Review
Space Debris Critical Design Review
Launch Readiness Review
Team Super 8: Sat Morpheus Final Presentation
Team SCREAM Launch Readiness Review
Proposal Team 8: Grant Fritz, Jessica Brown, Stephanie Jalovec, Jennifer McGraw, Brian Roth, Evan Townsend.
Presentation transcript:

Carnivorous Ninja Warriors Final Presentation Katie Brissenden, Kat Bryant, Cam Comeau, Aram Podolski, Hannah Williams December 1, 2009

Mission Overview Analyze the world at high altitude because, due to climate changes on the Earth, humans may need to live in different environmental conditions. The viability of life sustaining environments in different atmospheric conditions Six ultra-violet photodiodes, one on each face of the satellite. Methane gas sensor and the carbon monoxide sensor will be embedded onto the top of the satellite. Dangerous levels of methane and carbon monoxide, and ultraviolet rays will be determined prior to the launching of the satellite. Following the recovery of the satellite, the data will be analyzed to determine if the dangerous levels for each sensor was reached.

Design –15 x 15x 15cm cube –¾ inch insulation on all internal sides –6 UV photodiodes on each face –1 Methane gas sensor on top –1 Carbon monoxide sensor on top –Parts –Foam Core, AVR microcontroller, digital camera, resistor heater, HOBO, insulation, CO sensor/module, CH4 sensor/module, 8 UV photodiodes, tubing, wires, aluminum tape, 9V batteries, aluminum tubing, circuit board, –UV photodiodes in aluminum tubes –Gas sensors embedded in foam core –Camera positioned horizontally to look out of one face, Plexiglas covering opening to seal, anti-fog on Plexiglas –All hardware secured inside of cube with Velcro, hot glue

AVR programmed to turn on gas sensor heaters, camera, heater Output Programmed to collect data from UV, gas sensors, temperature, pressure, and X and Y accelerometer. Input Take data every 20 milliseconds How it works:

Differences between proposal and final product: Dropped humidity sensor Budget problems Dimension Change Smaller, more compact and greater heater efficiency UV sensors wired in series instead of parallel Ensures data from any face of the cube Used Velcro to secure components instead of just hot glue Plexiglas window for camera Change of team positions/specialties Lost a team member

Results and Analysis UV sensor data on ground Spike in data when exposed to UV light 1.1 to 1.18 Fluctuating from 1.16 to 1.19 because cube was being rotated and different amounts of UV light were being detected Dropped when UV source removed

Methane Gas Sensor Ground Data When exposed to the pre-calibrated level of methane, alarm is triggered causing voltage to jump from about 0 to approximately 4 V. Used propane tank Singular trigger If gas level not reached, no jump in voltage would be recorded.

Carbon Monoxide Gas Sensor Ground Data Sensor was turned on when the gas was already present, causing the voltage to start at 4V. Car exhaust used to calibrate, approximately 7000ppm. When moved away from source, alarm was no longer triggered and voltage dropped to about 0.

Ground data, no outside stimulation: Constant Temperature readings not correct

HOBO Data Turned on at 4:26 AM, not correct Turned off at 8:07 AM At 8:05: temperature changed from 71.77°F to 71.08°F Dew point changed from 4.6 to 4.5 Not a big enough change At 8:07, very last reading, everything went back to original values except secondary temperature The relative humidity stayed the same through the entire time recording data Doesn’t seem that any of the data collected from HOBO is accurate

Date TimeTemperature (*F) c:1RH (%) c:1 2Dew Point (*F) c:1 2Abs Humidity (gm/M3) c:1 2Uncomp RH (%) c:2 Temperature (*F) c:*4 11/12/09 04:26: /12/09 04:26: /12/09 04:26: /12/09 04:26: /12/09 04:26: /12/09 04:26: /12/09 04:27: /12/09 04:27: /12/09 04:27: /12/09 04:27: /12/09 04:27: /12/09 04:27: /12/09 04:27: /12/09 04:27: /12/09 04:27: /12/09 04:27: /12/09 04:27: /12/09 04:27: /12/09 04:28: /12/09 04:28: /12/09 04:28: /12/09 04:28: /12/09 04:28: /12/09 04:28: /12/09 04:28: /12/09 04:28: Hobo Data:

Flight Recap At launch: Both red and green lights were on Power to board Camera did not deploy Gas sensor heaters did not get warm At recovery: Camera still not deployed Gas sensor heaters not warm Opened Cube: All wires intact Solid LED on AVR Not armed Heater not warm

Failure Analysis Data retrieval: Status was partially armed Verifies that it was armed prior to launch, then turned on If not armed, status would have been in “safe mode” meaning disarmed Switches were turned on in the correct order If not, status would have been armed Approximately 7.16 seconds of data taken 359 data points Last data point was 0 If there had been no data, all points would read 5 No change in X or Y Stationary when turned on Pressure and temperature constant On ground when turned on Not able to repeat failure Everything worked during post-launch with no additional changes

xytemppressureUVCOCH Portion of flight data

Conclusions  We suspect between the time that we armed the board and the time of launch, the satellite was turned on and turned off, therefore disarming the board and not allowing any data to be collected during the flight.

Expected Data Increase in UV CO detected CH4 not detected

Conclusions Continued… Discovered that we could use what little data we collected in order to find out what went wrong with our satellite. While we did not get data from the flight, our ground data is accurate and using research we can predict what the results should have been.

Lessons Learned We should have… Found one focus instead of trying to take on several experiments Focused more on programming earlier Divided tasks earlier To get different results… Removed the latch from the programming so that it would stay armed

Ready to Fly Again No special storage conditions, but there should be care taken when handling the satellite. To activate payload: –Prior to flight replace camera, heater, and AVR batteries –Arm payload –Flip power and then G-switch –Make sure red and green LEDs are on –Make sure LED on AVR is blinking –Camera should deploy when turned on

Appendix A RFP/Proposal/Requirement Compliance RequirementBalloonSatCompleted 850 gram max814.1gYes $100 budget$158.29No- remaining balance paid for by team members Digital CameraCanon A570IS Digital Camera Yes Foam CoreStructure- Foam Core Insulation- Foam Yes Additional ExperimentsUV photodiodes Gas Sensors Yes Analog Sensor InputsDo not exceed 5 volts for experiments Yes Flight string interfaceNon-metal tube, secured with washer/paperclip Yes Internal Temperature remains above -10°C Internal heater, gas sensor heaters Yes

Appendix B: Mass Budget PartWeight (grams) Canon A570IS Digital Camera(with 2 AA Batteries)220 AVR Microcontroller board (with batteries)150 Active Heater System (with batteries)100 CH4 Gas Sensor Module23.14 CO Gas Sensor Module23.14 Structure200 UV photodiodes (6)30 Breadboard for UV sensor20 Op amp for UV sensor20 Hot Glue10 Total Actual814.1

Appendix C: Financial Budget ComponentPricePart #Vendor Name 1 CH4 Gas Sensor Module$ Parallax 1 CO Gas Sensor Module$ Parallax 1 Camera$0.00 Canon A570IS DigitalSpace Grant 1 Microcontroller$0.00 Space Grant 1 Heater$0.00 Space Grant Aluminum Tape$0.00 Space Grant Hot Glue$0.00 Space Grant 3/4 inch insulation$0.00 Space Grant 2 Heater Batteries$0.00 Space Grant 8 Ultraviolet Super Bright LED's$11.92RL5-UV1215SuperBrightLEDS.com Electrical Wire$1.00 McGuckin Hardware Aluminum Tubing (36 inches)$ McGuckin Hardware 9V batteries (per set of 8)$23.98 McGuckin Hardware Anti-fog$4.99 McGuckin Hardware Propane Torch$15.99 McGuckin Hardware Fishing Line$1.99 McGuckin Hardware Shipping and Handling$33.65 Total Cost =$158.29

Appendix D: Messages to Next Semester –Choose a simple mission objective and stick with it. –Start as early as possible and always be aware of deadlines. –Don’t be afraid to ask EVERYONE and ANYONE for help- they will help you! –Don’t be afraid to bribe for help (i.e. cookies) –Divide tasks and conquer ASAP! –If have team issues, tell your team…don’t bottle up your feelings and have an awkward session about it later.