GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectLAT Mgr’s meeting July 17-18, LAT Planning Meeting Mechanical Systems Marc Campell.
Advertisements

IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project I&T Meeting – Jan 29,2004 E. Gawehn 1 GLAST Large Area Telescope: MGSE Status Report Eric Gawehn SU-SLAC I&T MGSE Engineer
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review I&T Plan.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectACD CDR, January 7 & 8, 2003 Section 10 Integration and Test 1 GLAST Large Area Telescope: ACD Integration & Test Jim La/ACD I&T Lead.
GLAST LAT Instrument LAT Monthly Status Review Aug 1, 2007 W N Johnson, NRL 1 GLAST Observatory TVAC at NRL Aug 1, 2007 Neil Johnson NRL
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 7 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Environmental Test MGSE Design Concepts Rev 1.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Thermal-Vacuum Test Configuration.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
Mechanical Integration
Environmental Test Planning
Integration and Test GLAST Large Area Telescope:
Baseline Environmental Test Flow at NRL
GLAST LAT System Engineering
GLAST Large Area Telescope:
GLAST LAT System Engineering
LAT Pre-Environmental Test Plan
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope:
Integration and Test Organization Chart
Mechanical/Thermal Systems
Environmental Test Planning Meeting
GLAST Large Area Telescope
Integration and Test Organization Chart
Introduction and Overview
Design Integration and Analysis
Presentation transcript:

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration and Test Ken Fouts SLAC Gamma-ray Large Area Space Telescope

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 2 Presentation 8 of 12 Integration and Test Overview Review Current Status –LAT Instrument Configuration –Procedure Status Review Transportation Planning –LAT Transport and Shipping Container Procedures –Shipping Plan –LAT Transportation Plan Review Plan for Environmental Test –Pathfinding Summary –Test Plan Status –Test Configurations Schedule Review

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 3 Presentation 8 of 12 Integration and Test Current Configuration As built configuration –LAT-DS-1624 LAT Top Assembly –Radiators –ACD, Radiator & LAT MLI

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 4 Presentation 8 of 12 Integration and TestDocumentStatus LAT-MD LAT Instrument Performance Verification PlanReleased LAT-MD LAT Performance and Operations Test PlanReleased LAT-MD LAT Assembly SequenceReleased LAT-MD LAT Instrument Survey PlanReleased LAT-MD LAT Systems LAT Top AssemblyDraft LAT-DS LAT Systems Instrument AssemblyReleased LAT-DS LAT Tower and Electronics AssemblyReleased LAT-DS LAT Tower AssemblyReleased LAT-DS CAL-TEM-TPS Module AssemblyReleased LAT-DS TRACKER-LAT IDDReleased LAT-DS CAL-LAT IDDReleased Key I&T Requirement Documents Requirements Verified during Integration and Test

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 5 Presentation 8 of 12 Integration and TestDocumentStatus LAT-PS Fastener Installation and Torqueing ProcedureReleased LAT-PS Connector Mate and DemateReleased LAT-MD LAT I&T eLog Book Implementation PlanReleased LAT-PS Flight Hardware Bag and Purge ProcedureReleased LAT-PS AeroGo Bearing Reference GuideReleased LAT-PS LAT Data Collection ProcedureReleased LAT-MD LAT EGSE PlanReleased I&T Process Procedures I&T Standard Processes will continue to be used at NRL

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 6 Presentation 8 of 12 Integration and TestDocument Released Revision LAT-PS-6898 LAT Environmental Test Implementation PlanDraft LAT-PS LAT Shipping Container ProcedureIn Signoff LAT-PS LAT Environmental Test Handling ProcedureIn Signoff LAT-MD LAT Environmental Test SequenceReleased LAT-MD LAT Dynamics Test PlanReleased LAT-MD LAT Thermal Vacuum Test PlanReleased LAT-MD LAT EMI/EMC Test PlanReleased Key Documents for Environmental Test Assembly Inspection Data generated by I&T for requirement closure

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 7 Presentation 8 of 12 Integration and Test Environmental Test Configuration Drawings DrawingTitleStatus LAT-DS-06188Acoustic Test Configuration AssemblyReleased LAT-DS Thermal-Vacuum Test Configuration Assembly Draft in Review LAT-DS Horizontal Vibration Test Configuration Assembly Released LAT-DS-06190Vertical Vibration Test Configuration AssemblyReleased LAT-DS-06186Handling Configuration AssemblyReleased LAT-DS-06184Transport Configuration AssemblyReleased LAT-DS-06189EMI/EMC Test Configuration AssemblyReleased LAT-DS-06191Mass Properties Configuration AssemblyDraft in Development

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 8 Presentation 8 of 12 Integration and Test I&T Documentation CM processes for document control, release and completion will be the a same as those used at SLAC.

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 9 Presentation 8 of 12 Integration and Test Shipping Plan (1 of 2)

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 10 Presentation 8 of 12 Integration and Test Shipping Plan (2 of 2)

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 11 Presentation 8 of 12 Integration and Test LAT Transport Container Process Transport Container Onto Pallet Frame Transport Container Onto Pallet Frame Clean Container Clean Container Lift LAT Out Of Integration Stand Lift LAT Out Of Integration Stand Install LAT On Container Base Install LAT On Container Base Install Lower Cover To Base Install Lower Cover To Base Desiccant Into Container Desiccant Into Container Install Purge Line Install Purge Line Install Environmental Monitoring Equipment Install Environmental Monitoring Equipment Install Cover Install Cover Install Transport On Truck Install Transport On Truck Install Ground Cables To LAT & Container Install Ground Cables To LAT & Container Transport To NRL Transport To NRL Remove Container From Truck Remove Container From Truck Remove Environmental Monitoring Equipment Remove Environmental Monitoring Equipment Remove Container Cover Remove Container Cover Remove Purge Line Remove Purge Line Remove Lower Cover Remove Lower Cover Ready For Test Phase Ready For Test Phase Remove GPR From LAT Remove GPR From LAT LAT-PS LAT Transport & Container User Procedure

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 12 Presentation 8 of 12 Integration and Test Shipping Container Operations

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 13 Presentation 8 of 12 Integration and Test GPR/Grid Lift Operations at SLAC 4X4 Lift fixture with GPR Installing GPR in rotation stand GPR with the Grid in the rotation stand

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 14 Presentation 8 of 12 Integration and Test SLAC Facility Readiness for LAT Critical Lift 4 Certified Crane Operators 15 ton crane recertified –New controller added to improve speed control –New drum brake installed and certified MGSE Required: –4x4 Lift Fixture (SLAC Proofload Completed 3/11/05) –NRL Transport Container

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 15 Presentation 8 of 12 Integration and Test Environmental Test Sequence Final Pre-TV Sine Vibe L Mount Radiators Acoustic L T-CycleT-Bal Remove Radiators Weight CG Ship to Spectrum C L L Receive, Unpack T L Pack LAT CSSCS Baseline FCS at SLAC Ship to NRL L LL Pre Post-Axis L Limited Performance Test Comprehensive Performance Test SVAC Test C S F T E TCS Functional Test EMI/EMC Emissions/Susceptibility Test L Limited Performance Test Comprehensive Performance Test SVAC Test C S F T E LAT Functional and FSW Test TCS Functional Test EMI/EMC Emissions/Susceptibility Test Rev date: 24 April 2006 F NRL Post-Ship C EMI/EMC L E L TESTING IN THERMAL VAC CHAMBER

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 16 Presentation 8 of 12 Integration and Test Environmental Test MGSE/STE Transport Container –Manufacture complete; Analyses complete –Proof test complete –Demo Road Test complete –Available at SLAC Test Interface Plate –Complete Test Stand/Spreader Bars –Complete, used in pathfinding TVAC Sink Plates – ACD & S/C Simulator –Complete, used in pathfinding 2 TVAC Cal-Rod Cage –Complete, used in pathfinding 2 Acoustic Simulator –Complete Mass Properties Plate –Load Cell Interface in manufacture – Complete

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 17 Presentation 8 of 12 Integration and Test Facilities Thermal Vacuum Test –Cables and Port Plates – complete –Mechanical analyses complete –Trolley (cart) – complete, used in pathfinding –Chamber rails upgrade – complete and proof tested –Pathfinding 2 – complete –Chamber refurb, cleaning and recommissioning - complete –GSE bakeout and STE Validation – ECD: 5/16/06 Acoustic Test –Ramp manufacture complete Vibration Test –Expander head load frame procurement - delivered –Load frame manufacture – complete –Installation and proof test - complete EMI/EMC Test –Ramp manufacture – complete, used in pathfinding

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 18 Presentation 8 of 12 Integration and Test Pathfinding Part Deux Executed Mar , 2006 Objectives –Radiator installation/removal procedures including timed trial runs (adhesive pot life) –TVAC prep work – mount S/C simulator sink plate –TVAC configure – another rotation and install on Table / Cart Improved handling procedures for installation and use of test stand extensions –Installation of TVAC STE – heater cages, ACD sink plates –Transport into TVAC chamber and working around LAT and STE inside chamber. –TVAC cable installation and routing

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 19 Presentation 8 of 12 Integration and Test Pathfinding Summary Part Deux was very successful and beneficial to all involved. –No major handling or operations issues identified. –Minor mods to MGSE and procedures will improve safety and or execution efficiency. Radiator Installation –Process could be performed within adhesive pot life –Need some special tools to facilitate installation –Improvements to scaffolding to protect radiators / personnel –Apply adhesive to panel flanges TVAC Preps –S/C sink plate installation – protect the radiators –Heater cage setup – protect the radiators –ACD sink plates – cable interferences require modifications, in process –Detailed timeline and sequence for STE installation was developed based on lessons learned.

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 20 Presentation 8 of 12 Integration and Test Thermal STE S/C Sink Plate Configuration Heater Cage Configuration Installation of ACD Sink Plate Panels (5)

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 21 Presentation 8 of 12 Integration and Test Sine Vibe Configuration

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 22 Presentation 8 of 12 Integration and Test Radiator Installation Radiator installation test Radiator flange access

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 23 Presentation 8 of 12 Integration and Test EMI/EMC Test Configuration

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 24 Presentation 8 of 12 Integration and Test Acoustic Test Configuration

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 25 Presentation 8 of 12 Integration and Test TVAC Configuration

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 26 Presentation 8 of 12 Integration and Test Network Configuration for LAT Operations at NRL

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 27 Presentation 8 of 12 Integration and Test Environmental Test Schedule (1 of 3)

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 28 Presentation 8 of 12 Integration and Test Environmental Test Schedule (2 of 3)

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 29 Presentation 8 of 12 Integration and Test Environmental Test Schedule (3 of 3)

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 30 Presentation 8 of 12 Integration and Test Staffing Plan Current staffing plan for NRL: –Single long shift 5 days per week for Sine Vibe, Acoustic, EMI/EMC tests. –24/7 staffing for TVAC duration. –SLAC will average 14 people including I&T Management I&T Electrical I&T Mechanical Mechanical Design Online SVAC QA DAQ

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 31 Presentation 8 of 12 Integration and Test Staffing Plan

GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 32 Presentation 8 of 12 Integration and Test Summary The LAT instrument as-built configuration is in accordance with current engineering. Documentation, preparation and pathfinding for transporting and handling the LAT and have been completed. All EGSE and MGSE has been identified and its use has been demonstrated. The LAT instrument is ready for shipment and preparation for environmental test are on track.