Presentation is loading. Please wait.

Presentation is loading. Please wait.

LAT Pre-Environmental Test Plan

Similar presentations


Presentation on theme: "LAT Pre-Environmental Test Plan"— Presentation transcript:

1 LAT Pre-Environmental Test Plan

2 Pathfinder Planning Objective: Identify all operations included in pathfinder at NRL. List required MGSE, Simulators and other equipments required to complete pathfinder operations and identify owners. Estimate time required to complete operations. Operations Lifts Shipping Container (GPR) Test Stand Vibe Table (GPR) (EMI no Lifting) (Acoustic Cell) Turnover Complete Mass Simulator SLAC lift slings TVAC table/Trolley Turnover Shipping Container Moves Transport weighted shipping container To Sine Vibe To EMI To Acoustic To TVAC Action Items: I&T to support Radiator installation at LM Review LM lift fixture for radiator handling. Evaluate pathfinding radiator handling at NRL. Vibe table lift pathfinding with mass simulator w/GPR dimensional feature. Interference check with Test stand and vibe cell.

3 Required Equipment Test Stand/SLAC LAT Mass Simulator/ Spreader Bar/Wire rope for turnover/SLAC 4x4 Lift Fixture/SLAC Tug/Forklift/NRL Ramp for EMI/NRL Ramp for Acoustic/NRL GPR Simulator/NRL TVAC table/NRL TVAC Trolley/NRL Shipping container/NRL Hydroset/SLAC Inclinometers/SLAC Shock recorders/NRL Radiator Simulator/SLAC Radiator lift fixture/SLAC


Download ppt "LAT Pre-Environmental Test Plan"

Similar presentations


Ads by Google