MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February 2010 17 June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.

Slides:



Advertisements
Similar presentations
K. Long, 18 April, 2015 Beam-line status — red sky at night?
Advertisements

Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
1 MICE Video Conference Installations to date Future installation work Plans for May shutdown MICO organisation Use of Technical Board.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Summary 11/01/10 Due to the Inclement Weather it has perhaps been quieter than usual Water - Tank has been holding water fine. Some ice has been forming.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICE Video Conference April 22, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 11 th May 2009.
November 4th 2009MICE CM25 - RAL1 Commissioning Needs – MICO83 m. apollonio  g. cecchet.
MICO 22 nd February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
MOM’s report from G.CECCHET (abridged). MOM’s report First half of November we had normal operations with some data taking for Marco, Yordan, Maurizio.
MICE Commissioning Issues Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO Meeting—RAL.
MICO Meeting, 1 st March 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - March User Runs Plans - Suggestions.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 14 September, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
MOM - M.ApollonioMICO meeting - RAL - 17/3/20081 NEXT steps + proposed aims Today - START Cherenkov INSTALLATION (?) Tuesday 25 MARCH - MICO Meeting (?
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Pierrick Hanlet MICO June 6, 2011 MICE Operations Manager Report.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 26, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting June 7, 2010.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 4, 2011.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO April 6, 2009.
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
Commissioning needs: K.Long. Routine: LN2 bottle: –Needs to be sited in MICE Hall or outside vault so that routine checks of contents can be made.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
Commissioning needs MICO meeting 30 June 2008 MOM ( Roumen Tsenov)
Spectrometer Solenoid Update Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory MICO.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
MOM Report Linda R. Coney MICE Operations Manager University of California, Riverside MICO March 30, 2009.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICO Meeting May 24, 2010.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 7 September, 2009.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
MICE VC Aug '10J.S. GraulichSlide 1 MOM report o Achievements Since CM27 o Daily Operations o Run Plans o Summary Jean-Sebastien Graulich, Geneva.
MOM report – part I Roumen Tsenov as MOM ( )
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
MICE Operations Manager Report Linda Coney University of California, Riverside UKNF Meeting June 8, 2010.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
MOM Report Victoria Blackmore VC /06/11 1/7.
Click to add Text L. CONEY1 MICE Shifter Training June 2015.
Target Status Target installed in ISIS “Demonstrator” target in R78 Chris Booth Sheffield 7 th February 2008.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
Linda R. Coney – 24th September 2009 MOM Update Linda R. Coney 24 September, 2009.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MOM Report Paul Hodgson Paul Soler Victoria Blackmore VC-139: 14/04/111/8.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE VC MOM Report, 25 th February 2010 Terry Hart (MOM) - Decay Solenoid - Targets - DAQ - Machine Physics and User Runs - Suggestions.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
Running plan Step I.1 Basic radiation levels. I.1.1 ISIS running with beam elements on, target off, beam stop shut. Establish permanent MICE monitoring.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
MICE MICO Alain Blondel 23 December MICE Commissioning needs 22 December 08.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Beamline Update Adam Dobbs, MICE CM38 Feb Contents Recent and Upcoming Activities Target Conventional magnets Decay Solenoid Proton Absorber Summary.
MICE – UK Plan Roy Preece STFC RAL DOE Review of MAP Brookhaven National Laboratory 13 th August 2014.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
Overview of On-going Cryogenic Work At the MTA Barry Norris AD/Cryo February 14, 2005.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Step IV Step IV extended through 2016 QP/QD – in progress at FNAL Target dates SSU ECE for Feb now only 20% probability – no-field Feb Remainder for April/March.
MICE Operations Scenario Run 1
Presentation transcript:

MICO 1 st February 2010 Terry Hart (MOM)

MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent much of last week trying to clean helium in cold trap. Unfortunately this was unsuccessful due to probable leak contaminating helium with nitrogen. Linde to be contacted today to ascertain where to go from here. Large implications wrt what we will be able to achieve during machine physics. Some work to be delayed until User Run Target Target 2 commenced operation in R78 on Monday 25 th. As of Monday early afternoon, achieved 557,000 actuations. - Record for target run in R78! Plan is to run target to failure. - Mechanical fault - Excessive bearing wear

MICO 1 st February June 2015 MICE Hall Placed mylar sheet on Q6 girder box Modified covers over quadrupole cables Completed airline connection to decay solenoid valves Jan. 26 Health & Safety audit of MICE Hall went well Quote for hydraulic unit (beam stop back-up): £ 2.5K Compressor stands material arrived, work has commenced ELECTRICAL PS switch added to target and wired in situ – Ian Mullacrane DAQ Jean – Sebastian at RAL last week rewiring DAQ in control room Work complete but rewiring makes TOF calibration data necessary More details from Jean-Sebastien’s talk

MICO 1 st February June 2015 BLOC Rota Thursday, Jan. 28 th meeting established BLOC duties and rota until April 2010 BLOC will be on-call 24/7 to assist with any beamline/target issues during MICE operations Rehearsal Rehearsal on afternoon of Thursday 28 th January. The target operated for a few pulses. All magnets except DS (Q1 – Q9, D1 and D2) were ramped up to nominal currents. The beam stop tested All equipment functioned as expected, no problems to report.

MICO 1 st February June 2015 Machine Physics Four dates confirmed: Fri 5 th February16:00 – 00:00 Establish that DAQ and detectors work Sun 7 th February 08:30 – 00:00 Commission luminosity monitors Mon 8 th February16:00 – 00:00 Nothing has planned, left for contingency Wed 10 th February08:30 – 00:00 16h Activation study at 2V beamloss. TOF calibration probable (DAQ rewiring) Proton absorber studies (maybe, check with Marco)