DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.

Slides:



Advertisements
Similar presentations
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Advertisements

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.
Status Brussels GANTRY Ê We have observed a significant influence due to temperature 4 we had a lot of problems with our cooling system (ventilation) Ë.
Module Production Brussels Ê Problems with vacuum chambers in plate solved 4 Almost all plates back in Brussels (repaired in Aachen) Ë Problem with rotation.
TEC Production in the US N. Bacchetta, J. Incandela,…and October 14, 2003.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 4 August 2003 Sam Burke UCSB HEP Group.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
TEC Production in the US J. Incandela Level 2 Manager US CMS Silicon Tracker Project October 8, 2003.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 28 July 2003 Sam Burke UCSB HEP Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 21 July 2003 Sam Burke UCSB HEP Group.
…an innovative shell and tube heat exchanger with an exceptionally high heat transfer coefficient for industrial fluid cooling and air conditioning.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Construction and Installation of the CLIC Experimental Area
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
Michel Della Negra/Karlsruhe May PbWO4 Crystals: Energy Resolution  m /m = 0.5 [  E1 /E 1   E2 /E 2  cot(  /2)  ] H   Simulation (100.
David Bailey Gluing. Silicon /pcb assembly Previously Using Sony Robot and precision dispenser Have established acceptable glue dot parameters Dot electrical.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Booster L12/Noker-L13/Absorber Update PIP Update Talk August 15, 2012 Salah Chaurize.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
Status Brussels GANTRY
Far Detector Activities Late 2017 – Early 2018
Status Brussels GANTRY
UCSB Hybrid Bonding & Testing
US Module Production Status
Results from module testing
CMS Perugia Modules Production Review
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
OGP Surveying & DB Entry
Electrical Testing at UCSB: Hybrids & Modules
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
TOB Module Production Overview and Plan
Presentation transcript:

DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara

DOE REVIEW 1/20/04 – Dean White 2 Talk Overview Gantry Personnel New 5 th floor clean room Gantry design Gantry module precision Gantry production capabilities Summary

DOE REVIEW 1/20/04 – Dean White 3 Gantry Module Assembly Personnel Technicians: Andrea Allen David Staszak Post-doc: Russel Taylor Engineers: David Hale Dean White  These are the key people in module assembly. They also are involved to greater and lesser degrees in other areas of module production.

DOE REVIEW 1/20/04 – Dean White 4 New 5 th Floor Clean Room Reasons for new 5 th floor clean room: Temperature stability of +/- 1deg C needed for gantry. Availability of Emergency Power. Future need of high-bay clean room for Rod Production

DOE REVIEW 1/20/04 – Dean White 5 New 5 th Floor Clean Room Better than class 10,000 clean room. Main production room (5324) has new gasket sealed grid ceiling and lighting. Hard wall anteroom entrance added in room New compressed air drier, filters and clean copper piping was added in the building core to deliver clean/dry air to clean rooms. ~$45,000 of University funds were used for these improvements.

DOE REVIEW 1/20/04 – Dean White 6 Gantry Design BREIF DISCUSSION OF UCSB GANTRY AND MODUDE ASSEMBLY TOOLING Aerotech AGS 1000 gantry X,Y,Z & U (rotational) positioning system Gantry image recognition system and electronics. Vacuum/Pressure control values

DOE REVIEW 1/20/04 – Dean White 7 Gantry Design – Assembly Plates CERN style assembly plate Laminated assembly plate Vacuum chuck plate PVC support and vacuum posts

DOE REVIEW 1/20/04 – Dean White 8 Gantry Design – Assembly Plates Vacuum chucks and vacuum transfer lines on gantry base plate

DOE REVIEW 1/20/04 – Dean White 9 Gantry Design – Assembly Plates ASSEMBLY PLATE TEFLON PADS ARE MACHINED TO FINAL HEIGHTS (+/- 25um) REFERENCED OFF OF FEET ON BOTTOM Vacuum channels and o-ring grove machined into assembly plate for each sensor

DOE REVIEW 1/20/04 – Dean White 10 Gantry Design – Assembly Plates Assembly plate feet that rest on vacuum chucks - precision machined flat and parallel Sensor vacuum Hybrid vacuum Hybrid supply vacuum

DOE REVIEW 1/20/04 – Dean White 11 Gantry Design – Assembly Tooling TOB / TEC HYBRID AND SENSOR PICK-UP TOOLS. TOB HYBRID BRIDGE

DOE REVIEW 1/20/04 – Dean White 12 Gantry Design – Assembled Modules 3 completed modules on the assembly plate.

DOE REVIEW 1/20/04 – Dean White 13 Gantry Precision - Sensors

DOE REVIEW 1/20/04 – Dean White 14 Gantry Precision - Hybrids

DOE REVIEW 1/20/04 – Dean White 15 Gantry Production – Assembly Time Rough module assembly timeline using two people for producing 15 modules / day. (this probably could be increased for short periods, but over the long run it would be hard to do more than this in an 8 hour day) Technician One: 8-9:00Survey modules, install into carrier plates for 5 plates (50 min) 9-9:45Run 1 st assembly plate (45 min) Break 10-10:45 Run 2 nd assembly plate 11-11:45 Run 3 rd assembly plate 12-1:00Lunch 1-1:45Run 4 th assembly plate 2-2:45Run 5 th assembly plate Break 3-5:00Make-up time for assemblies with problems Technician Two: Load assembly plate, DB entry, glue prep (50min) Prepare 2 nd assembly plate Prepare 3 rd assembly plate Prepare 4 th assembly plate Prepare 5 th assembly plate Prepare parts for next day’s assembly plates Receive parts, DB transfers, maintenance, etc.

DOE REVIEW 1/20/04 – Dean White 16 Gantry Production Capabilities TOB 5 TOB R-phi assembly plates commissioned during TOB Stereo assembly plate commissioned during 2003

DOE REVIEW 1/20/04 – Dean White 17 Gantry Production Capabilities TEC 1 TEC R6 assembly plate fully commissioned (designed and built over the last 2 months of 2003). Part of new responsibilities for TEC module assembly at UCSB. TEC hybrid tool

DOE REVIEW 1/20/04 – Dean White 18 Gantry Production Capabilities Additional Assembly Plates 10 more module assembly plates in different stages of design and construction: 2 more TOB R-phi plates – dwgs are in the Physics machine shop 2 more TOB stereo plates – dwgs are in the Physics machine shop 2 more TEC R6 plates – dwgs are in the Physics machine shop 2 TEC R5N plates – design in progress 2 TEC R5S (stereo) – design in progress These 10 plates + the 7existing plates will give us the capability to build 2750 TOB and TEC modules (R6, R5N & R5S) at UCSB. Switching between assembly plate types is easily, so modules can be built from whatever parts that are available.

DOE REVIEW 1/20/04 – Dean White 19 Summary During 2003: New 5 th floor clean room installed Production of TOB and TEC modules, that are will within specification, has been accomplished on the UCSB gantry. New assembly plate design developed here at UCSB. 79 modules assembled on gantry. Fabrication of multiple assembly plates of modules/day (4) has been demonstrated. Gantry team is ready for 150 module production run over 2 weeks that will begin the last week of January 2004.