1 MOSFIRE is a Multi-Object Spectrometer for the Near Infra-Red (wavelengths ~0.975-2.40 μm) We are deep in the component fabrication and procurement phase.

Slides:



Advertisements
Similar presentations
Used to Procure Goods & Supplies. Office supplies Operating supplies Computer hardware and software (non- capitalized
Advertisements

PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex.
Models. The Future of Building Services Model Content.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Organics Waste Processing Facility Construction Progress Update January 17, 2011.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
Dean R Walters Undulator Vacuum October 12-13, 2004 Facility Advisory Committee Undulator Vacuum System/Mechanical By Dean R Walters.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
LIGO-G M LIGO Laboratory1 Adv. LIGO Facilities Modifications (FAC) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update Vendor still expecting to complete first magnet by the end of November, before X-mas more.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
4/25/11 G v3 1 Facility Modifications and Preparations (FMP) Technical Status Annual NSF Review of Advanced LIGO Project April , 2011 John.
Experimental Facilities DivisionOak Ridge SNS INSTRUMENTS OVERVIEW R. K. Crawford Instrument Systems Senior Team Leader September 10, 2004 HYSPEC IDT Meeting.
Target Injection/Positioning Update Presented by Ron Petzoldt Neil Alexander 1, Lane Carlson 2, Dan Frey 1, Jonathan Hares 3, Dan Goodin 1, Jeremy Stromsoe.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
SPS Synchrotron Light Monitor -BSR- Status G. TRAD E. Bravin, A. Goldblatt, F. Roncarolo.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
First 200 MHz Superconducting Cavity for NuFact H. Padamsee, R. Geng, E. Chiaveri, R. Russo Presented by D. Hartill.
G5 Beam Line Vacuum System. G5 Beamline Vacuum System Design  Bakeable and Particulate free to Class 100 Clean Room quality Require Clean room QA and.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
September 19-20, 2007 L. Snydstrup Controls, Diagnostics, Vacuum, Cooling Systems, Installation DOE Annual Review Controls, Diagnostics, Vacuum, Cooling.
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
FourStar Status Eric Persson (OCIW) Presented By.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Extended Detector Cutoff Considerations WFIRST Project Office May
Experiments and Design of a wavelength calibration procedure for MOSFIRE Principal Investigator: David Guerrero, Cal Poly SLO Research Advisor: Ian McLean,
TPC Collaboration Meeting Peter Glassel 1 Reminder on Installation Schedule (ALICE Forum June 2002)  Install Muon magnet directly into experimental.
TTF3 Coupler Assembly Cleanroom SLAC March 26, 2007 Jeff Tice.
18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Tyson Hare, Ian Thompson, Greg Burley, Christoph Birk, Alan Dressler, Alan Uomoto.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Prototyping of Complex Systems Some Experiences Gilson Bootstrapping Series November 8, 2011 Farshid Feyzi Physical Sciences Laboratory.
Nanotechnology Research Leo Lau Materials Science & Technology Research Centre The Chinese University of Hong Kong.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
The Laboratori Nazionali di Frascati of the Istituto Nazionale di Fisica Nucleare 1.
Installation of the T600 at Fermilab
University of Wisconsin
Progress and Issues with VTS Upgrade
cooling and supports of the forward endcap EMC
MLC Schedule Plan Proven in-house expertise and infrastructure for fabrication, assembly, and testing cryomodules Confident in our technical expertise.
The situation is far better than I had thought.
Spectrometer Solenoid Fabrication Status and Schedule
CBRN Room inprocessing checklist
EVLA M/C Software PDR, 14 May 2002
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
FourStar 4K x 4K JHK imager
Injector / Linac Installation Current Status
X-Ray Endstations Update
Upgraded Injector Test Facility
NSS integrated installation plan workshop Introduction
Injector/Linac Design Status C. E
The Laboratori Nazionali di Frascati of the
East Hall under construction
Presentation transcript:

1 MOSFIRE is a Multi-Object Spectrometer for the Near Infra-Red (wavelengths ~ μm) We are deep in the component fabrication and procurement phase. Optics: Good progress at COSI, UCO, and other suppliers Mechanical & Facilities: –Lots of fabrication complete and in-process at Caltech/UCLA shops as well as outside shops for larger components such as dewar, structure. –Clean room installed in Synchrotron high bay –Test & Build Stand fabrication complete Software: good progress; waiting for hardware Electronics: ramping up, EE UCLA 1 st Cold Test in planned for May 5, 2008

MOSFIRE Fabrication Filter Wheel Mech Internal Structure Shield Fab. Vacuum Chamber Rear Cap in-process

MOSFIRE Facilities and Infrastructure Clean Room Construction Test Stand in Clean Room