Presentation is loading. Please wait.

Presentation is loading. Please wait.

18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Tyson Hare, Ian Thompson, Greg Burley, Christoph Birk, Alan Dressler, Alan Uomoto.

Similar presentations


Presentation on theme: "18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Tyson Hare, Ian Thompson, Greg Burley, Christoph Birk, Alan Dressler, Alan Uomoto."— Presentation transcript:

1 18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Tyson Hare, Ian Thompson, Greg Burley, Christoph Birk, Alan Dressler, Alan Uomoto

2 18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress 11 e2v CCD44-82 detectors received (10 science, 1 engineering) Test dewar (MIKE red) finished Test electronics finished (saddlebag + preamp plate) Cryotiger cold heads received Cryotiger compressors on order, hoses to be ordered

3 18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Building solid model of dewar Redesign focus mechanism, front plate, dewar body, CCD plate, and G10 spaceframe Drawings released to shop include backplate, A-frame, focus flexure and counterweight, 3 sideplates, cooler housing and hardware, CCD electronics box

4 18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress RFQ issued for PI components Investigating installation of ion pump


Download ppt "18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Tyson Hare, Ian Thompson, Greg Burley, Christoph Birk, Alan Dressler, Alan Uomoto."

Similar presentations


Ads by Google