1 Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation 13: Final Presentation.

Slides:



Advertisements
Similar presentations
Presentation #M2 EZ Parking Wontaek Shin (M2-1) Shanshan Ma (M2-2) Nan Li (M2-3) Stage 1: 1/24/2006 Design Proposal Overall Project Objective: Design a.
Advertisements

Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Viterbi Decoder: Presentation #10 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 10: 5 th April Final Design Corrections.
1 Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 12 MAD MAC th April, 2006 Short Final Presentation.
Virtual Wallet Gates Winkler Yin Shen Jordan Samuel Fei /23/2009 A handheld device that saves time and money through smart budget management and.
Noise Canceling in 1-D Data: Presentation #12 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 11 th, 2005 Final.
Noise Canceling in 1-D Data: Presentation #13 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 20 th, 2005 Short.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
Huffman Encoder Project. Howd - Zur Hung Eric Lai Wei Jie Lee Yu - Chiang Lee Design Manager: Jonathan P. Lee Huffman Encoder Project Final Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 10: April 5th Chip Level Simulation Overall Project Objective: Design an.
Noise Canceling in 1-D Data: Presentation #10 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 28 rd, 2005 Chip Level.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 11: April 12th Short Final Presentation Overall Project Objective: Design.
Group M3 Jacob Thomas Nick Marwaha Craig LeVan Darren Shultz Project Manager: Zachary Menegakis April 11, 2005 MILESTONE 12 Final LVS & Simulation DSP.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage IX: March 30 th 2004.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 27 Overall Project Objective : Dynamic Control.
Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
M3: The Pro-Diver 525 Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Design Manager: Steven Beigelmacher Stage 11: Mini-
Group M3 Nick Marwaha Craig LeVan Jacob Thomas Darren Shultz Project Manager: Zachary Menegakis April 4, 2005 MILESTONE 11 LVS & Simulation DSP 'Swiss.
M3: ProDiver 525 *Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 2 Feb 04 Size Estimates/ Floor Plan Overall.
GPS Waypoint Navigation 525 Team M-3: Nicholas Bannister, Charles Norman, Jeremy Weagley, Julio Segundo, Steve Nielsen Presentation 1: Preliminary Design.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Noise Canceling in 1-D Data: Presentation #10 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 4 th, 2005 Chip.
Random Number Generator Dmitriy Solmonov W1-1 David Levitt W1-2 Jesse Guss W1-3 Sirisha Pillalamarri W1-4 Matt Russo W1-5 Design Manager – Thiago Hersan.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel.
RF Triangulation: Indoor/Outdoor Location Finding Chip Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai Overall Project.
M2: Team Paradigm :: Pre-Final Presentation 2-D Discrete Cosine Transform Team Paradigm (Group M2): Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan.
GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
M3: ProDiver 525 *Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 9 Mar 29 Chip Level Simulation Overall Project.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage VIII: March 24 th 2004.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
High Dynamic Range Emeka Ezekwe M11 Christopher Thayer M12 Shabnam Aggarwal M13 Charles Fan M14 Manager: Matthew Russo 6/26/
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 8: March 24th Chip Level Layout Overall Project Objective: Design an Air-Fuel.
Sprinkler Buddy Presentation #8: “Testing/Finalization of all Modules and Global Placement” 3/26/2007 Team M3 Kartik Murthy Panchalam Ramanujan Sasidhar.
1. 2 Farhan Mohamed Ali Jigar Vora Sonali Kapoor Avni Jhunjhunwala 1 st May, 2006 Final Presentation MAD MAC 525 Design Manager: Zack Menegakis Design.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
E-Voting Machine - Design Presentation Group M1 Bohyun Jessica Kim Jonathan Chiang Chi Ho Yoon Donald Cober Mon, Nov 10 Analog Simulation for ExtractedRC.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 5: Feb. 18 th Component Layout Overall Project Objective: Design an Air-Fuel.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 4: Feb. 11 th Gate Level Design Overall Project Objective: Design an Air-Fuel.
ESE 570 Final Project Due Wednesday, May 5, 2004, 4:30 pm.
Sprinkler Buddy Presentation #12: “Final Presentation Outline” 4/25/2007 Team M3 Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Sasidhar Uppuluri Devesh.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Camera Auto Focus Group W1 Tom Goff Dave Hwang Kate Killfoile Greg Look Design Manager: Bowei Gai Final Presentation, April 30 th, 2007 Project Objective:
M2: Team Paradigm :: Milestone 7 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Sprinkler Buddy Presentation #10: “LVS” 4/11/2007 Team M3 Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Design Manager:
WaitLess*: Presentation #9 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan Overall Project Objective: Table/bar service interface.
GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 11 Overall Project Objective : Dynamic Control.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Group M3 Jacob Thomas Nick Marwaha Craig LeVan Darren Shultz Project Manager: Zachary Menegakis April 20, 2005 MILESTONE 13 Short Final Presentation DSP.
Virtual Wallet Gates Winkler Yin Shen Jordan Fei Project Manager: Prajna Shetty /02/2009 A handheld device that saves time and money through smart.
COBXXXX EXPERIMENTAL FRAMEWORK FOR EVALUATION OF GUIDANCE AND CONTROL ALGORITHMS FOR UAVS Sérgio Ronaldo Barros dos Santos,
Alpha Blending and Smoothing
Presentation transcript:

1 Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation 13: Final Presentation May 3, 2006 Overall Project Objective: Design a low-power chip that navigates an aircraft to pre-determined waypoints.

2 Agenda  Marketing - Nan  Project Description  How It Works  Verification  Floorplan  Layout  Final Specifications  Conclusion

3 SkyNav is a low-power solution to today’s high demand of autonomous vehicles, utilizing intelligent judgments for flight corrections.

4 Unmanned Aerial Vehicle  Commercial  Military

5 The Market  The most dynamic sector of the aerospace industry  Will more than double over the next decade, from current worldwide UAV expenditures of about $2 billion in 2005 to $4.5 billion in Forecast International research report - Forecast International research report

6 Why Use a Chip?  Low-power Consumption  Compact  Decrease Manpower SKY NAV

7 Agenda  Marketing  Project Description  How It Works  Verification  Floorplan  Layout  Final Specifications  Conclusion

Project Description  The system will be able to autopilot the craft through a series of 5 user specified GPS coordinates in 3 dimensions  Our chip will calculate the correction for altitude, latitude, longitude, speed.

9 Pre-Blackbox Data Current Coordinates Application Description Waypoint Coordinates Post-Blackbox Data Calculator (AKA Blackbox) Coordinate Corrections Avionics

10 Agenda  Marketing  Project Description  How It Works – Shanshan  Verification  Floorplan  Layout  Final Specifications  Conclusion

11 Clock Division

12 Flow Path

13 Flow Path

14 Flow Path

15 Flow Path

16 Flow Path

17 Flow Path

18 Flow Path

19 Flow Path

20 Flow Path

21 Agenda  Marketing  Project Description  How It Works  Verification – Julio  Floorplan  Layout  Final Specifications  Conclusion

22 Verification Chip Functions -2-d v. 3-d -2-d v. 3-d -Calculate our speed or use an input -Calculate our speed or use an input -Units: What is conventional? -Units: What is conventional? -Accuracy -Accuracy -Calculation Outsourcing -Calculation Outsourcing Exhaustive Testing -Overflow Cases Layout Schematic Structural Behavioral Matlab

23 Verification Chip Functions -2-d v. 3-d -2-d v. 3-d -Calculate our speed or use an input -Calculate our speed or use an input -Units: What is conventional? -Units: What is conventional? -Accuracy -Accuracy -Calculation Outsourcing -Calculation Outsourcing Exhaustive Testing -Overflow Cases Layout Schematic Structural Behavioral Matlab Serialization added Test, Test, Test!

Scenario Scenario Verification

25 Verification Chip Functions -2-d v. 3-d -2-d v. 3-d -Calculate our speed or use an input -Calculate our speed or use an input -Units: What is conventional? -Units: What is conventional? -Accuracy -Accuracy -Calculation Outsourcing -Calculation Outsourcing Exhaustive Testing -Overflow Cases Serialization added Test, Test, Test! Warning: Writing Sim files can cause Arthritis! Solution: Have a Script write your Sim Files Layout Schematic Structural Behavioral Matlab

26 Verification

27 Agenda  Marketing  Project Description  How It Works  Verification  Floorplan  Layout  Final Specifications  Conclusion

28 Floorplan Inputs Blackbox Outputs

29 Agenda  Marketing  Project Description  How It Works  Verification  Floorplan  Layout – Charles  Final Specifications  Conclusion

30 Layout Comparators & Calculators SRAM FSM Registers Clock Dividers

31 Poly (10.27)

32 Metal 1 (30.95)

33 Metal 2 (18.65)

34 Metal 3 (11.20)

35 Metal 4 (3.68)

36 Agenda  Marketing  Project Description  How It Works  Verification  Floorplan  Layout  Final Specifications  Conclusion

37 Chip Specifications Size µm x µm Area124,724µm² Transistor Count 28,242 Aspect Ratio 1.30 Overall Trans. Density.226

38 Pin Specifications Vdd! / Gnd! In/Out2 User Input In8 “Blackbox” Outputs Out5 “Blackbox” Inputs In27 CorrectionsOut36 DoneOut2 Total80

39 Power Specifications Functional Component Navigation - Schematic Navigation - Extracted RC Setup - Schematic Setup - Extracted RC SRAM11.97nW12.09nW594.8nW674.2nW FSM2.3nW2.7nW30.4nW32.3nW RegistersBuffers Clock Dividers Done Logic 1.20uW8.98uW3.09uW31.92nW1.22uW9.10uW3.29uW38.12nW5.6uW16.56uW3.09uW31.92nW5.9uW16.75uW3.29uW38.12nW Speed Comparator Altitude Comparator Waypoint Comparator Heading0.8nW1.3nW16.8nW10.7nW0.8nW1.3nW17.5nW10.7nW0.8nW1.7nW58.1nW11.7nW0.8nW1.7nW61.9nW11.7nW Distance Calculator Speed Calculator Angle Calculator 10.4nW5.5nW4.3nW10.4nW6.0nW4.3nW11.3nW5.8nW4.5nW11.4nW6.0nW4.5nW Total Modular Power 13.37uW13.71uW26.0uW26.78uW

40 Agenda  Marketing  Project Description  How It Works  Verification  Floorplan  Layout  Final Specifications  Conclusion

41 Reaching Our Main Goal  I/O Count > 200  Serialization  Increased Power  This led to…

42 Conclusion  Gripe is always up to increase your quota  Changing schematics while someone is trying to LVS the top-level layout leads to tears  We are proud of our design (no pre- discovered algorithms used)

43 Q & A