Upstream PID Review Alan Bross MICE CM 16 October 12, 2006.

Slides:



Advertisements
Similar presentations
Data/MC discrepancy study Alessia Satta Roma 9 october 2014.
Advertisements

Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
A Day in the Life 2014 “Licensing Made Easy” TIM SHIELD.
Software Summary Database Data Flow G4MICE Status & Plans Detector Reconstruction 1M.Ellis - CM24 - 3rd June 2009.
MICE VC 15/3/07Chris Nelson MICE Hall. Issues Realistically, I would expect D2 drawings to go for tender by end next week 23/3 but I hope we can use same.
MICE CM16, RAL, 11 Oct 2006V. Palladino Plans for MICE PI detectors & Shielding MICE CM16, RAL Oct 11, 2006 V. Palladino, Univ & INFN Napoli for the small.
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
Detector Systems Update MICO April 14, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u H6533MOD PMT assembly reliability is the main concern.
Upstream PID Review at CM16 A.Bross VC September 13, 2006.
MICE PID, 6 Dec 2007 V. Palladino Introduction to the meeting Introduction to the meeting 1 ) TOF I shielding (Vittorio introduces discussion) 2) Discussion.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
MICE CM17, CERN, 24 Feb 2007 V. Palladino PID Detectors & shields MICE PID detectors & Shielding MICE CM17, CERN Feb 25, 2007 V. Palladino, Univ & INFN.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
F. Gianotti, AFP kick-off meeting, 20/9/2012 Recommendations for the next steps Reports from the:  Technical Review A.Henriques  Physics Review R.Hawkings.
Software Project Planning CS470. What is Planning? Phases of a project can be mostly predicted Planning is the process of estimating the time and resources.
Intro: Spin Report Update Hi Gerry (from S. Vigdor, 10/17/07), I would like to ask you to organize efforts, with the help of the others copied on this.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Research & Technology Implementation TxDOT RTI OFFICE.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
Executive Session Director’s CD-1 Review of the Mu2e Project April 3, 2012 Elaine McCluskey.
HFT face-2-face F.Videbaek Brookhaven National Lab.
Executive Session Director’s Progress Review of the NOvA Project August 4-5, 2010 Dean A. Hoffer.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
11 Nov 2008PC Analysis PC Schedule 2008 Tuesdays fortnightly 9 September  23 September  2 October  CM22  11 November  25 November 9 December.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Online Reconstruction 1M.Ellis - CM th October 2008.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
OFFICE OF SCIENCE 1 Closeout Presentation and Final Report Procedures.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE CMPB Alain Blondel 1 Highlights on MICE.
1 MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau.
1 Engineering Session Summary Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
OFFICE OF SCIENCE 1 Closeout Report on the DOE/SC CD-3b Review of the Utilities Upgrade Project (UUP) Fermi National Accelerator Laboratory August 11-12,
October 4-5, Status of ARRA funded AIPs Stochastic Cooling Alex Zaltsman October 4, 2010 Stochastic Cooling cost and schedule.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
M. Bonesini - MICE RAL M. Bonesini INFN Milano PMTs tests in B field.
SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
OFFICE OF SCIENCE Closeout Report by the Review Committee for the LHC-CMS Detector Upgrade Project Fermi National Accelerator Laboratory August 27, 2013.
CLOSING REMARKS. Following the Review Charge Cryo-Design  Review and comment on the overall cooling circuit and overall cryo-design. u Temperature Margin.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
Executive Session Director’s Conceptual Design Review of Muon g-2 Project June 5-7, 2013 Jon Kotcher.
Director’s Progress Review Closeout Meeting
MICE CM31 Schedule summary
Third Workshop on GEMs for CMS
MICE PM Report Progress with the Infrastructure A few problems
European Detector R&D: AIDA
Director’s Progress Review Closeout Meeting
S. Stepanyan (JLAB) HPS collaboration meeting May 3 – 5, 2017 JLAB
Schedule and Public Outreach Plan
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Presentation transcript:

Upstream PID Review Alan Bross MICE CM 16 October 12, 2006

Upstream PID Review  Charge: u Have the simulation studies/analyses accurately and reliable defined the detector needs for the experiment? u Is the design specification sufficient to meet the needs of the experiment? u Is it likely that the proposed system(s) (detector, electronics, DAQ) can achieve this specification? u Are the risks fully understood and being appropriately managed? u Is the proposed schedule realistic in terms of the available resources: funding and people? u Is the schedule likely to lead to a timely installation in the MICE hall? u Are the infrastructure needs clearly defined and being addressed? u The review is also free to pick up on issues which may arise during the review and are not covered by the above.

Process  At the close-out the committee will present preliminary findings u Findings u Comments u Recommendations  My Goal is to have a final report to the project manager in about 2 weeks

Downstream PID Review Reminder  Although the design of the downstream PID systems have progressed very nicely during CM16, there are still open questions: Magnetic shielding, detector size, calorimeter design. So it is still premature to schedule the DS-PID review at this time  We propose that we have a 1-2 day workshop in Frascati to help finalize the design of the DS-PID systems in early December  We (Vittorio and I) will try to pin down a date in the next 2 weeks.  Afterwards we should be in a better position to determine when to schedule the actual review u But with a strong goal of having it no later than MICE CM17