Tracker Subsystem1 GLAST LAT Project FM16 PSR, Nov. 4, 2005 GLAST LAT Tracker Tower16 Pre-Ship Review INFN-Pisa.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM15 PSR, Oct. 14, 2005 GLAST LAT Tracker Tower15 Pre-Ship Review INFN-Pisa.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM1/3 PSR, April 20, 2005 GLAST LAT Tracker Tower-1/3 Pre-Ship Review INFN-Pisa.
Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMarch 24, 2003 HPS Tracker Peer Review, WBS Section 2-D 1 GLAST Large Area Telescope: Tracker Subsystem WBS Structural.
2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT Silicon Tracker Marcus ZieglerAPS April Meeting The GLAST Silicon Tracker Marcus Ziegler Santa Cruz Institute for Particle Physics University.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
July GLAST Project Installation Review LATLAT 1 Tracker Tower Installation Review Peter Amnuaypayoat
GLAST LAT Project TKR Tower 4 and 5 hand-off review – June 8,2005 Hiro Tajima, TKR Tower 4 and 5 hand-ff review 1 GLAST Large Area Telescope: TKR Hand-off.
GLAST LAT Project – Cost and Schedule ReviewNovember 3, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review November 3, 2004.
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.
GLAST LAT ProjectSubsystem Managers Face to Face, November 17, GLAST Large Area Telescope: Darren Marsh Stanford Linear Accelerator Center Performance.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
GLAST LAT Silicon Tracker Marcus ZieglerIEEE The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus Ziegler.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project18 July GLAST Large Area Telescope: NCR 529 Systems Engineering R. Bright Gamma-ray Large Area Space Telescope.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST Large Area Telescope:
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Engineering Model Tower.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: Mechanical Parts and Materials.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST Large Area Telescope:
Dave McComas on behalf of the ISʘIS Team
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
Mini-Tower test results
Open Issues Modification of Cactus Arm bending tool required
7E: Tower test plans GLAST Large Area Telescope: Tracker Subsystem
GLAST Large Area Telescope:
GLAST Large Area Telescope
CRaTER Pre-Ship Review (I-PSR) Instrument Configuration Bob Goeke
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
March ’05 Face to Face Meeting Introduction
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

Tracker Subsystem1 GLAST LAT Project FM16 PSR, Nov. 4, 2005 GLAST LAT Tracker Tower16 Pre-Ship Review INFN-Pisa

Tracker Subsystem2 GLAST LAT Project FM16 PSR, Nov. 4, 2005 Tower 16 - Assembly and test highlights October 25-28, 2005 (INFN-Pisa) : –assembly of complete tray stack (15 non- flight trays) –complete cable set (3 non-flight cables) –sidewalls, alignment No environmental tests performed No Solithane, No EMI taping Full EIDP details at: –  TOWER 16 is a spare, non-flight module and will be used for calibration studies tray17 replacement tray to be replaced

Tracker Subsystem3 GLAST LAT Project FM16 PSR, Nov. 4, 2005 Tower 16 – configuration details Tower PN: LAT-DS (rev3) Tower SN: non-flight trays: 5 from tower0 – some needed rework 4 from flight towers 1,14,7,8 and showing anomalies at high T and/or vacuum – removed and reworked where necessary 1 with anomalous GTFE 5 with minor mechanical problems 3 non-flight cables: C0-023, C6-008, C7-009 Tracked in NCR INFN/PI 593

Tracker Subsystem4 GLAST LAT Project FM16 PSR, Nov. 4, 2005 Tower 16 – functional test details 39 issues to deal with when testinglayers with more than 16 bad chans or rare anomalies Overall bad channels Tracked in NCR INFN/PI 594

Tracker Subsystem5 GLAST LAT Project FM16 PSR, Nov. 4, 2005 Tower 16 – efficiency performance Average tower efficiency is 99.5% (waiting enough for FE2 on Y11 to warm-up and taking into account also Y15 with ~160 bad chans)