The Pied Pipers Alyssa Visitacion Ken Shum Joanne Flores.

Slides:



Advertisements
Similar presentations
Proposal Presentation EE 396 – Micromouse Spring 2008 Saturday, February 9, 2008 Donald Kim Lab - POST 214.
Advertisements

Ramrod IV Micromouse 396. The Team  Andrew Igarashi – Programming  Kevin Li – Hardware  Amy Maruyama – Hardware  Stephen Nakamura – Hardware  Quang.
A fully autonomous robot designed to navigate and solve a maze.
The goals of Micromouse: to build an autonomous “mouse” Mouse should be able to navigate and solve any given maze Mouse should be no bigger than 25.
Design Presentation The Prodigy. Introduction Group Members: Dale Balsis Tyson Seto-Mook Calvin Umeda Keoni Wasano.
Design Presentation Fast D.A.D.I.. Team Members D - ale Balsis A - aron Tsutsumi D - ennis How I - kaika Ramos.
MICROMOUSE 2006 Version: Meat & Potatoes. Alex Zamora Tyson Seto-Mook Mike Manzano Alex de Angelis Aaron Fujimoto The Team:
Ramrod III Micro mouse. The Team  Andrew Igarashi – software  Kevin Li – hardware  Stephen Nakamura – hardware  Quang Ngu – software.
Thomas Kagawa, Kenyan Kawauchi, Christopher Lanuevo, Ronald Mangoaong, Joan Suniga.
EE 296-Micromouse Spring 2008 Team: CheeHeePono! Members: Mitchell La Puente Travis Suemori Travis Suemori William Chang William Chang Ashley Tomita Ashley.
Ramrod III Micro mouse. The Team  Andrew Igarashi – Hardware  Kevin Li – Programming  Stephen Nakamura – Hardware  Quang Ngu - Programming.
Preliminary Design Review Micromouse EE 296 Spring 2008.
EE 296 TEAM “DA KINE” MICROMOUSE PROJECT PROPOSAL Team members: Software Group - Henry, James Roles : tracking, mapping, guidance, interface Hardware Group.
Ramrod III Micro mouse. The Team  Andrew Igarashi – Hardware  Kevin Li – Programming  Stephen Nakamura – Hardware  Quang Ngu - Programming.
Micromouse Team:. Team Members Kanoa Jou (Leader) Ryan Sato (Organizer) KiWoon Ahn (Organizer) Brett Ikei (Recorder)
EE396 Project Micromouse Team: Ocha. Team Members Kanoa Jou (Programmer) Ryan Sato (Hardware) KiWoon Ahn (Recorder) Alan Do (Programmer)
Micromouse Projects LTD. Presents a STIG, Whitey, Zephyr Production.
Group Members Ikechukwu Mogbana Adewuyi Kupolati Frederick Tyson Advisor Prof. Mahmood February, Senior Project 2005/06 Undergraduate Project Proposal.
("/(o_O)\") RaWr! Design Review Presentation March 11, 2006.
FINAL PRESENTATION Lost Café 66 EE 296 5/6/2004. Introduction of Team Team Leader: Arthur Phanphengdy Members: Quincy Quach Kang Lu Jackson Ng.
Shane Sunada Malcolm Menor Joseph Longhi. - Autonomous maze solving robot -16x16 maze starting at corner - No contact after switched on - No going under.
Curry Mouse EE 296 Project Proposal Presentation February 11, 2006.
‘Iole o Mãnoa Mouse of Mãnoa. Team Members Jeff Fines Designer, Fabricator, Programmer & Thomas Matsushima Designer, Fabricator, Programmer.
Micromouse 296 Final Presentation Fall 2008 Group: Rabbitwagon.
Preliminary Design Review
1 Final Presentation Team Amaze Me May 8, Content Members Overview of Project Goals Structure of Design Design Decisions Problems & Improvements.
TEAM MECHAZAWA Jeong Bang Riley Ceria Grant Higa.
KTD Micromouse Overview Team Goals Approach Outstanding Problems Future Solutions Final Status.
The Pied Pipers Joanne Flores Ken Shum Alyssa Visitacion.
Design Review Presentation Lost Caf é 66. Introduction of Team Team Leader: Arthur Phanphengdy Members: Quincy Quach Kang Lu Jackson Ng Team Name: Lost.
TAKE YOUR JACKET OFF! Proposal Presentation  Members:  Jayson Nakakura: Chassis Design and Fabrication  Kellie Murakami: Circuitry Design and Fabrication.
M & M EE 296 Final Presentation Spring 2004 Presentation Overview Team Member Introduction Project Overview Overall Design Description Final Project.
1 Team Amaze Me (Micromouse 296/396) Brandon Gibu Chad Higa John Miyajima Justin Ogata (February 9, 2008) Fig. 1.1: Amaze Me 1.0Fig. 1.3: *Herbie the Mousebot*
("/(o_O)\") RaWr! Final Presentation May 9, 2006.
Micromouse Spring 2006 K A L The Pied Pipers. The Pied Pipers: Joanne – Programming Ken – Hardware Alyssa – Hardware Introduction of Team and Roles.
("/(o_O)\") RaWr! Proposal Presentation February
Ramrod IV Micromouse 396. The Team  Andrew Igarashi – Programming  Kevin Li – Hardware  Amy Maruyama – Hardware  Stephen Nakamura – Hardware  Quang.
Central Power Mouse Group Members: Stacey Mitani Jeremy Perron (team leader) Erica Salvador Reid Ueda.
Micromouse Team:. Team Members Kanoa Jou Ryan Sato KiWoon Ahn Brett Ikei.
Preliminary Design Review EE 296 – Micromouse Spring 2007.
Team Asphalt Kellen King Ikaika Ramos Brad Centeno.
Preliminary Design Review EE 296: Micro Mouse Spring 2007.
The EE296 MicroMouse. Team Members Eric Fune (Director of Programming)‏ David Hashisaka (Senior Circuitry Technician and Chief Fabrication Officer)‏ Jarret.
MicroMouse Final Presentation Jill Kobashigawa Min Mo Jon Shindo Christy Kaneshiro.
EE 296 Team Da Kine James Cuaresma – Software Wesley Mina - Hardware Regi Morales - Hardware Henry Do - Software.
Preliminary Design Review Micromouse Spring 08 8” Comb.
Preliminary Design Review Micromouse Team: Ocha. Team Members Kanoa Jou Ryan Sato KiWoon Ahn Brett Ikei.
Ramrod IV. The Team  Andrew Igarashi – Programming  Kevin Li – Hardware  Amy Maruyama – Hardware  Stephen Nakamura – Hardware  Quang Ngu – Programming.
The goals of Micromouse: to build an autonomous “mouse” Mouse should be able to navigate and solve any given maze Mouse should be no bigger than 25.
Curry Mouse EE296 Final Presentation Wednesday, May 10, 2006.
The goals of Micromouse: to build an autonomous “mouse” Mouse should be able to navigate and solve any given maze Mouse should be no bigger than 25.
KTD Micromouse OverviewApproach Potential problems Personal Expectations Team Goals.
Micromouse 296 By Lemmings. Introductions  Vicky- coordinator, software oriented  Bryce-morale booster, software oriented  Ruffer-time keeper, hardware.
Team P.A.C.K men EE 296 Project. Chris Mcleod Hardware specialist.
Super Space Monkey from Space Trent Robertson Krystle Dulatre Ben Ng Lori Nakamoto.
EE 296 TEAM “DA KINE” MICROMOUSE PROJECT PROPOSAL Team members: Software Group - Henry, James Roles : tracking, mapping, guidance, interface Hardware Group.
Final Presentation EE 296 – Micromouse Spring 2007 Friday, May 4, 2007 POST 214.
Fast D.A.D.I.. Team Members D - ale Balsis - Machinist D - ale Balsis - Machinist A - aron Tsutsumi - Electrician A - aron Tsutsumi - Electrician D -
Curry Mouse EE296 Design Review Presentation Saturday, March 11, 2006.
ECE 477 FINAL PRESENTATION TEAM 7  SPRING 2013 COST ROBOT ERIC OSBORNE, BRYAN DALLAS, ANDREW LOVELESS, CAROLINE TRIPPEL.
Team 4 Shane Sunada – Project Leader Malcolm Menor – Project Manager Nathan Umeda – Technical Supervisor Joseph Longhi – Documentation Final Presentation.
‘Iole o Mãnoa Mouse of Mãnoa. Team Members Jeff Fines Designer, Fabricator, Programmer & Thomas Matsushima Designer, Fabricator, Programmer.
Preliminary Design Review (PDR) Team Amaze Me. EE 296 Project (MicroMouse) Members –Brandon Gibu –Ah Ram Kim –John-Kalani Miyajima –Justin Ogata Website.
Team: CHEE WHOOO Spring 08. The Team Mitchell La Puente-Project Leader Josh Miyamoto-Software Richard Ordonez-Hardware.
MICROMOUSE EE296 Spring 2004 Team Name: Lost Café 66.
Micromouse 296 Team: Rabbitwagon Fall O8. The Team Richard Ordonez- Project Leader Bob Barfield- Software Manager Lance Lavarias- Mechanical Architect.
CSU-1 Project Updates Mechanical:
Proposal Presentation
Forward Until Touch Robot goes forward until it hits a wall.
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
Presentation transcript:

The Pied Pipers Alyssa Visitacion Ken Shum Joanne Flores

* To create an autonomous robotic mouse that will navigate a maze * M Project Overview

System Diagram

Program Module Tracking Algorithm Wall Hugger Algorithm Sense walls If offset sensors turn on, you are no longer centered. Increase speed on side of offset sensors until centered Go as long as there is a wall on the left if there is a wall on the front, turn right if there is no wall on the left, turn left

Mechanical Module Subsystems Chassis Sensor Placement Batteries Motor Electrical Circuitry

Chassis

Completed Chassis

Sensor Layout

Test Sensors

Completed Tasks Sensor layout Chassis Attached Wheels Determined type/placement of batteries Pillars Attained all necessary supplies

What Remains To Be Done Integrating the sensor circuit ( currently underway) Determine how many motor pulses needed to move one cell (pending) Attach motors to circuit (pending) Programming (in progress) Functionality Tests (in progress)

Potential Problems Subsystems not working as planned Parts breaking Too much time on troubleshooting Exams, quizzes, conflicting with working on project Spring Break: team availability not optimal

Updated Project Timeline March Tasks Build Sensors Circuit Build Motors Circuit Solder Test Motors Test Sensors Program Sensors Program Motors Program Mapping Program Solving Complete Forward Moving Mouse Complete Wallhugger First Draft of Paper Team Progress Meeting

Project Timeline (cont) April Tasks Debugging /Improvements Complete Mouse Finishing Touches Second Draft of Paper Final Draft of Paper Team Progress Meeting

May Tasks Finishing Touches Prepare Presentation Team Meeting Final Presentations

Questions?