Doc.: IEEE 802.11-15/0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to.

Slides:



Advertisements
Similar presentations
Doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go.
Advertisements

Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0726r1 Submission July 2013 Rich Kennedy (BlackBerry)Slide 1 P802.11af Report to EC on Conditional Approval to go to Sponsor Ballot.
Doc.: IEEE /0320r1 Submission March 2013 Osama Aboul-Magd (HuaweiTechnologies)Slide 1 P802.11ac Report to EC on Conditional Approval to go to.
Doc.: IEEE /1447r3 Submission November 2011 Eldad Perahia, Intel CorporationSlide 1 Date: Authors: P802.11ad Report to EC on Conditional.
Doc.: IEEE /0674r0 Submission June 2009 Bruce Kraemer, Marvell; Adrian Stephens, Intel Corporation Slide 1 P802.11n report to EC on request for.
IEEE mc Closing Report for March 2015
Doc.: IEEE /0287r6 Submission March 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to Sponsor.
P802.11ah Report to EC on Conditional Approval to go to Sponsor Ballot
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: Submission July 2011 D. Denteneer (Philips), B.Kraemer (Marvell) Slide 1 P802.11s report to EC on request for approval to proceed to.
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v report to EC on request for conditional approval to proceed.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
xxxx doc.: IEEE /xxxxr0 March 2017
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 August 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
September 2009 Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2011
P802.11aq Report to EC on approval to forward draft to RevCom
Presentation transcript:

doc.: IEEE /0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to Sponsor Ballot Date: Authors:

doc.: IEEE /0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 2 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11REVmc Draft 4.0 to Sponsor Ballot. This document was approved during the plenary session of the working group on xx March –Passed in the Working Group xx yes, x no, x abstain

doc.: IEEE /0287r0 Submission WG Letter Ballot Results – P802.11REVmc February 2015 Dorothy Stanley (Aruba Networks)Slide 3 Ballot ID Ballot Close Date TitleBallot Type Pool Return %Return Abstain %Abstain Approve Disapprove %Approve Mar 2013 First Recirculation Ballot for P802.11REVmc draft 1.0 Recirculation Oct 2013 Second Recirculation Ballot for P802.11REVmc draft 2.0 Recirculation Jun 2014 Third Recirculation Ballot for P802.11REVmc draft 3.0 Recirculation Feb 2015 Third Recirculation Ballot for P802.11REVmc draft 4.0 Recirculation LB 206 Post-Ballot vote change* * indication of “Approve” from Alex Ashley

doc.: IEEE /0287r0 Submission WG Letter Ballot Comments – P802.11REVmc February 2015 Dorothy Stanley (Aruba Networks)Slide 4 Ballot ID Ballot Close Date Title Total Number of Comments received (Yes and No voters) Mar 2013Technical Letter Ballot for P802.11REVmc Draft (296 T, 505 E) Oct 2013First Recirculation Ballot for P802.11REVmc Draft (379 T, 118 E) Jun 2014Second Recirculation Ballot for P802.11REVmc Draft (300 T, 479 E) Feb 2015Third Recirculation Ballot for P802.11REVmc Draft (21 T, 25 E)

doc.: IEEE /0287r0 Submission Unsatisfied comments by commenter February 2015 Dorothy Stanley (Aruba Networks)Slide 5 VoterLB193LB199LB202LB206Total Bajko, Gabor Erceg, Vinko Fischer, Matthew Hart, Brian Hedayat, Ahmadreza Hunter, David Jindal, Nihar Kolze, Tom Porat, Ron Rison, Mark Smith, Dwight Wang, Lei Wang, Qi

doc.: IEEE /0287r0 Submission Unsatisfied Comments – Topics February 2015 Dorothy Stanley (Aruba Networks)Slide 6 TopicPHYMAC (frame formats) MAC (Others) EditorialTotal

doc.: IEEE /0287r0 Submission Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: –Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. –Double click on the icon to the right to open this. February 2015 Dorothy Stanley (Aruba Networks)Slide 7

doc.: IEEE /0287r0 Submission TGmc Timeline February 2015 Dorothy Stanley (Aruba Networks)Slide 8 OpenClose Fourth recirculation (TGac D5.0)17-March-1501-April-15 First sponsor ballot07-April-1507-May-15 Second sponsor ballot20-July-1504-Aug-15 Third sponsor ballot04-Sept-1519-Sept-15 Fourth sponsor ballot19-Oct-153-Nov-15 Fifth sponsor ballot3-Dec-1518-Dec-15 EC to RevCom Jan-16 RevCom to SB Feb-16

doc.: IEEE /0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 9 References