Presentation is loading. Please wait.

Presentation is loading. Please wait.

July 2010 doc.: IEEE 802.11-10/0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: 2010-07-16 Authors:

Similar presentations


Presentation on theme: "July 2010 doc.: IEEE 802.11-10/0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: 2010-07-16 Authors:"— Presentation transcript:

1 July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors: S. McCann (RIM), B.Kraemer (Marvell) Stephen McCann, RIM

2 July 2010 doc.: IEEE /0872r1 July 2010 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11u to RevCom. This document (11-10/0872r0) was approved during the closing plenary session of the working group on July 16, 2010. Passed in the Working Group x-x-x S. McCann (RIM), B.Kraemer (Marvell) Stephen McCann, RIM

3 IEEE 802 Sponsor Ballot Results – P802.11u
July 2010 doc.: IEEE /0872r1 July 2010 IEEE 802 Sponsor Ballot Results – P802.11u Draft Opened Closed Days Ballot Type Pool Approve Disapprove Abstain Return D8.0 30 Initial 154 106 [90%] 12 [10%]* 13 [10%] 132 [86%] D9.0 15 1st Recirc 115 [92%] 10 [8%]** 140 [90%] D10.0 2nd Recirc 120 [94%] 7 [6%]* 14 [10%] 142 [92%] D10.0a 123 [97%] 4 [3%]*** D10.0a indicates post ballot changes * Includes one commenter with no comments ** Includes two commenters with no comments *** Since ballot close, 3 of the 7 commenters have indicated vote change to “Yes/Approve” S. McCann (RIM), B.Kraemer (Marvell) Stephen McCann, RIM

4 Mandatory Coordination
July 2010 June 2009 doc.: IEEE /0674r0 doc.: IEEE /0872r1 July 2010 Mandatory Coordination Coordination Entity Draft Date Status IEEE-SA Editorial (MEC) D7.0 July 09 “Meets all editorial requirements. “ Quantities, Units and Letter Symbols (SCC14) Not required Terms and Definitions (SCC10) Registration Authority Committee (RAC) Slide 4 S. McCann (RIM), B.Kraemer (Marvell) Page 4 Stephen McCann, RIM Bruce Kraemer, Marvell; Adrian Stephens, Intel

5 Comments by Ballot – P802.11u July 2010 November 2008
doc.: IEEE /0872r1 July 2010 Comments by Ballot – P802.11u Draft Ballot Not Required Satisfied Known Unsatisfied Assumed Unsatisfied Total D10.0 Recirc 2 73 2 75 D9.0 Recirc 1 59 66 3 131 D8.0 Initial 190 139 7 336 322 174 5 10 542 S.McCann (RIM), B.Kraemer (Marvell) Bruce Kraemer, Marvell

6 Unsatisfied Comments by Commenter
July 2010 doc.: IEEE /0872r1 July 2010 Unsatisfied Comments by Commenter Commenter D8.0 D9.0 D10.0 Total Stephen Palm (Broadcom)* 7 3 10 Gabor Bajko (Nokia) 2 1 Clint Chaplin (Samsung) Jon Rosdahl (CSR) 6 15 * Assumed unsatisfied, no response to repeated s to commenter S. McCann (RIM), B.Kraemer (Marvell) Stephen McCann, RIM

7 Vote Changes since last ballot I
July 2010 doc.: IEEE /0872r1 July 2010 Vote Changes since last ballot I From: Christopher Hansen Sent: 13 July :51 To: Stephen McCann Subject: Re: 11u sponsor ballot I'll change my vote to yes. Chris ==================================================================================== From: WORSTELL, HARRY R (HARRY R) Sent: 15 July :53 To: Stephen McCann Subject: Sponsor Ballot Vote on IEEE "u" Stephen, As my only comment left on the IEEE TG u Sponsor ballot that constituted my Do Not Approve vote was answered in document u, I now change my vote to Approve. <cut> Best regards, Harry S. McCann (RIM), B.Kraemer (Marvell) Stephen McCann, RIM

8 Vote Changes since last ballot II
July 2010 doc.: IEEE /0872r1 July 2010 Vote Changes since last ballot II From: "Venkatesan, Ganesh" Date: Thu, 15 Jul :22: To: Stephen McCann Subject: FW: TGu negative voter Hello Stephen: I am satisfied with resolutions to all my sponsor ballot comments on TGu. I write this mail to inform you that I change my vote on the TGu to “APPROVE”. Thanks for your patience and diligence in addressing all concerns in a fair manner. I really appreciate it. Cheers -- ganesh S. McCann (RIM), B.Kraemer (Marvell) Stephen McCann, RIM

9 July 2010 doc.: IEEE /0872r1 July 2010 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the ballot resolution committee during sponsor ballot is attached. Double click on the icon to the right to open this. A copy of the unsatisfied comments presented using MyBallot access database report format is attached. S. McCann (RIM), B.Kraemer (Marvell) Stephen McCann, RIM

10 TGu Timeline Recirculation (TGu Draft 11.0) Open 2010-07-23 Close
July 2010 doc.: IEEE /0872r1 July 2010 TGu Timeline Recirculation (TGu Draft 11.0) Open Close Recirculation (TGu Draft 12.0) Recirculation (Unchanged 12.0) Revcom Submission EC to RevCom RevCom to SB S. McCann (RIM), B.Kraemer (Marvell) Stephen McCann, RIM

11 802.11 EC Motion – Conditional Approval to send P802.11u to RevCom
July 2010 June 2009 doc.: IEEE /0674r0 doc.: IEEE /0872r1 July 2010 EC Motion – Conditional Approval to send P802.11u to RevCom Request the IEEE 802 Executive Committee for conditional approval to forward P802.11u D12.0 to RevCom. Moved: Bruce Kraemer nd: <tbd> Yes No Abstain WG vote on the Motion Passed: xx y, x n, x a Slide 11 S. McCann (RIM), B.Kraemer (Marvell) Page 11 Stephen McCann, RIM Bruce Kraemer, Marvell; Adrian Stephens, Intel


Download ppt "July 2010 doc.: IEEE 802.11-10/0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: 2010-07-16 Authors:"

Similar presentations


Ads by Google