Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go.

Similar presentations


Presentation on theme: "Doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go."— Presentation transcript:

1 doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot Authors: NameAffiliationAddressPhoneemail Michael Montemurro Research in Motion 4501 Tahoe Blvd, Mississauga, ON. CANADA L4W 0B4 +1 (905) 629-4746 mmontemurro@rim.com Bruce KraemerMarvell 5488 Marvell Lane, Santa Clara, CA, USA 95054 +1 (321) 427-4098 bkraemer@marvell.com

2 doc.: 11-11/0962r2 Submission July 2009 Menzo Wentink (Qualcomm), Bruce Kraemer (Marvell) Slide 2 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11ae Draft 6.0 to Sponsor Ballot. This document (11-09/962r2) was approved during the closing plenary session of the 802.11 working group on 22 July 2011. –Passed in the Task Group yes, no, abstain –Passed in the Working Group yes, no, abstain

3 doc.: 11-11/0962r2 Submission P802.11ae Draft Stability DraftDateNumber of Pages 1.0Nov-201049 2.0Feb-201149 3.0Apr-201155 4.0Jun-201154 5.0Jul-201154 July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 3

4 doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 4 802.11 WG Letter Ballot Results – P802.11ae Ballot ID Ballot Close Date TitleBallot Type Pool Return %Return Abstain %Abstain Approve Disapprove %Approve 169 8 Dec 2010 Technical Letter Ballot for TGae draft 1.0 Technical278 7441191343281 172 18 Feb 2011 First Recirculation Ballot for TGae draft 2.0 Recirculation2781557938171552686 176 26 Apr 2011 Second Recirculation Ballot for TGae draft 3.0 Recirculation2781637937171632189 180 18 Jun 2011 Third Recirculation Ballot for TGae draft 4.0 Recirculation278180803516180896 180.1 22 Jul 2011 Post letter ballot vote changes Recirculation278----183597

5 doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 5 802.11 WG Letter Ballot Comments – P802.11ae Ballot ID Ballot Close Date TitleBallot Type Number of Comments received 169 8 Dec 2010 Technical Letter Ballot for TGae Draft 1.0 Technical461 (309 T, 152 E) 172 18 Feb 2011 Recirculation Letter Ballot for TGae Draft 2.0 Recirculation386 (246 T, 140 E) 176 26 Apr 2011 Second Recirculation Ballot for TGae Draft 3.0 Recirculation142 (58 T, 84 E) 180 18 Jun 2011 Third Recirculation Ballot for TGae Draft 4.0 + 802.11 MC Recirculation79 (54 T, 25 E)

6 doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 6 Unsatisfied comments by commenter VoterLB169LB172LB176LB180Total Liwen Chu77 Harish Ramamurthy718 Sudhir Srinivasa325 Solomon Trainin33 Hongyuan Zhang11 Total133824

7 doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 7 Unsatisfied Comments – Topics Topic#Comments Default MFQ Policy8 MFQ Policy Negotiation5 MFQ Priority Signaling6 Cryptographic Encapsulation4 MLME1 Total24

8 doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 8 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: –Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. –Double click on the icon to the right to open this.

9 doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 9 TGae Timeline OpenClose Fourth recirculation (TGae D5.0)25-Jul-119-Aug-11 Fifth recirculation (TGae D6.0)15-Aug-1130-Aug-11 First sponsor ballot9-Sep-119-Oct-11 Second sponsor ballot16-Nov-111-Dec-11 Third sponsor ballot16-Jan-1231-Jan-12 Fourth sponsor ballot27-Feb-1213-Mar-12 EC to RevCom Mar-12 RevCom to SB Jun-12


Download ppt "Doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go."

Similar presentations


Ads by Google