PSS®E 34.0 Release Webinar 23 April 2015

Slides:



Advertisements
Similar presentations
IQuote User Guide (1.2) Use your portal username and password
Advertisements

1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Restricted © Siemens Industry, Inc All rights reserved.Answers for infrastructure and cities. Node-Breaker Modeling in PSS®E Joe Hood Siemens Power.
Arsalan A Rahim EED, UET Lahore. The Edit Mode is used to create a new case or to modify existing cases. In Edit Mode: Create a new case Create a.
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
SRWG Activity Report (as presented) March 21-23, 2012 TSS Meeting #160 WECC Offices Salt Lake City, Utah Mark Graham, SRWG Chair/David Franklin TSS.
Model W Wall Mount Static Transfer Switch. Why choose a model W static transfer switch? Increases power availability. Integrated maintenance bypass. True.
January TSS J. Gronquist, S. Kincic
ZXM10 EISU Training.
Siemens Power Technologies International
© 2011 Siemens Energy, Inc. All rights reserved. Answers for energy. PSS ® ODMS a proven solution for CIM-based network modeling Anna Geevarghese T&D Service.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Chapter 10 Database Applications Copyright © 2011 by The McGraw-Hill Companies, Inc. All Rights Reserved. McGraw-Hill.
Geographical Visualisation of CIM networks using Google APIs Alan McMorran.
Introduction to Qualtrics for Online Surveys Claire Goverts; Office of Research Analysis, and Planning (RAP)
HossamTalaat - MATLAB Course - KSU - 19/09/ IEEE Student Branch - College of Engineering - KSU Getting started with Power System Blockset By Prof.
Hands-On Microsoft Windows Server 2003 Administration Chapter 5 Administering File Resources.
Distribution Management System Implementation at Florida Power & Light
Doug Tucker and Jon Jensen WECC Staff SRWG Workshop July 15-16, 2014 ColumbiaGrid.
1 EMC Storage Plug-in for Oracle Enterprise Manager 12c Version Product Overview.
Supervisory Systems.
1 Kyung Hee University Prof. Choong Seon HONG Network Control.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
Jay Britton
©Kwan Sai Kit, All Rights Reserved Windows Small Business Server 2003 Features.
Electrical Distribution Training
Siemens Power Generation, Instrumentation &Controls
10-1 aslkjdhfalskhjfgalsdkfhalskdhjfglaskdhjflaskdhjfglaksjdhflakshflaksdhjfglaksjhflaksjhf.
London April 2005 London April 2005 Creating Eyeblaster Ads The Rich Media Platform The Rich Media Platform Eyeblaster.
Monthly TCR Calculation DRAFT 3 James J. Teixeira 05/11/02 Also review ERCOT Protocols Section 7 for more details and additional data.
1 © 2008 Avaya Inc. All rights reserved. IPOffice Configuration Service Emil Ratnam.

1.8History of Java Java –Based on C and C++ –Originally developed in early 1991 for intelligent consumer electronic devices Market did not develop, project.
SIMPLE TRANSMISSION OUTAGE. Nodal Protocol Definition 2.26 Simple Transmission Outage A Planned Outage or Maintenance Outage of any Transmission Element.
My Workspace ELearning in Sakai Randy Graff, PhD HSC Training.
Status Update: Using NMMS for Building SSWG Cases Wes Woitt CenterPoint Energy 2010 SSWG Chair.
Configuring File Services. Using the Distributed File System Larger enterprises typically use more file servers Used to improve network performce Reduce.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 9 Virtual Trunking Protocol.
AdLib eDocument Solutions Scott Mackey AdLib eDocument eDocument Solutions.
PSS/E RAW File Format for appending to case
© 2015 Eaton Corporation. All rights reserved. This is a photographic template – your photograph should fit precisely within this rectangle. Eaton software.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
DWG Procedural Manual: Wind Model Requirements DWG Request to ROS August 11, 2006.
InLoox PM Product Presentation Slide 1 InLoox PM Product Presentation © InLoox, Inc. InLoox PM 8 for Outlook Product Presentation The Project.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
Simulation of O2 offline processing – 02/2015 Faculty of Electrical Engineering, Mechanical Engineering and Naval Architecture Eugen Mudnić.
Data Requirements For Calculating Geomagnetically Induced Currents PGDTF Meeting March 21, 2016 Michael Juricek PGDTF Chairman 1.
Computer Networks.  Which is the best definition of a circuit switched network?  An electric circuit where the connections get switched based on who.
Analysis. This involves investigating what is required from the new system and what facilities are available. It would probably include:
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
1 PSSE Playback Model Validation with PMU Data Damien Sommer, P.E. Senior Transmission Planning Engineer.
Technical Panel Session. Sunday January 11, DC System Failure Modes IEEE PES SBC Winter Meeting. January 11 – 15, New Orleans, LA Part 3.
6 Week industrial Training Presentation
This is a photographic template – your photograph should fit precisely within this rectangle. © 2016 Eaton. All rights reserved. Eaton software tools xSpider.
SharePoint 101 – An Overview of SharePoint 2010, 2013 and Office 365
IBM Rational Rhapsody Advanced Systems Training v7.5
GIC Analysis using PSS®E
PSS®E Update for WECC Good morning, welcome to psse presentation for the UGM I’m glenn pietrow, PSSE product manager and GUI developer Currently manage.
Introduction to the New SSA OnePoint Online Website
Industry Mall User Administration Webinar
NetworkManager CIM Users Group Prague
Accurate Fault Location Using Modeling and Simulation
PitchBook For MS Dynamics Plugin
Utilizing the ring operation mode of MV distribution feeders
PSS®E Update for WECC Good morning, welcome to psse presentation for the UGM I’m glenn pietrow, PSSE product manager and GUI developer Currently manage.
Doug Tucker and Jon Jensen WECC Staff
Integrated gateway-server
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
PCP – Industry Focus.
Using GitHub for Papyrus Models Jessie Jewitt – OAM Technology Consulting/ ARM Inc. January 29th, 2018.
Presentation transcript:

PSS®E 34.0 Release Webinar 23 April 2015 Siemens Power Technologies International PSS®E 34.0 Release Webinar 23 April 2015

Announcements PSSE 34.0 will be available for download within the next few days You will receive an email with the download link and new password. PTI User Group Meetings 2015 Europe May 5th-7th (PSS®E meeting on 6th, PSS®E training on the 7th) Prague, Czech Republic Ibis Praha Wenceslas Square US (filled to capacity) May 12th-14th (PSS®E meeting on 13th, PSS®E training on the 14th) New Orleans, Louisiana Crowne Plaza French Quarter PSS®E Customer Advisory Board Play an active role in directing the future of PSS®E Will be rolled-out during upcoming UGMs Look for information for how to participate in the next few weeks

PSS®E 34.0 Highlights Integrated Node-Breaker Support Node-Breaker topology support in engine Automatic substation topology generation Novel approach for linking Bus-Branch and Node-Breaker worlds Node-Breaker contingency analysis Updated study file management system Improved power flow models Solution parameters saved in SAV, RAW and SEQ Support for branch names 12 Customizable ratings groups Results spreadsheets Geomagnetic Induced Current (GIC) improvements New dynamics models Many user interface, diagram, settings and plotter improvements

Automatic Substation Building Choose from several common substation configurations (breaker and a half, ring bus, etc) Easily add multiple buses at different voltage levels 90% of the work is done for you. Terminals can easily be moved after the initial layout is generated

Linked Bus-Branch and Node-Breaker Diagrams Visual indication and clickable link for substation diagram in bus-branch view Easily drill down to substation detail from the bus-branch model Customized substation diagrams will automatically be loaded if available, or diagrams will be create dynamically as needed.

Example Node-breaker Contingencies fault line from bus 101 to bus 102 ckt 1 / open line with brkrs isolate branch from bus 201 to bus 202 ckt 2 / open line with brkrs fault bus 3005 / clear bus with brkrs disconnect swd sub 4 from node 5 to node 2 / open brkr or switch close swd sub 2 from node 1 to node 7 / close brkr or switch isolate swd sub 1 from node 3 to node 8 / isolate brkr with brkrs contingency "stuck_brkr_example" fault line from bus 101 to bus 102 ckt 1 / open line with brkrs isolate swd sub 1 from node 1 to node 2 / stuck brkr at remote term end Notes: PSS®E 34.1 will have expanded NB contingency support including automatic NB contingency generation

PSS®E 34 Node-Breaker Demo

Improved Study File Management System Formally known as Scenarios Streamlined operation New Study Explorer view for simple file management

Power Flow Modeling Additions Distributed generation mode and parameters in load model In-feed control mode for machines

Solution Parameters in RAW and SEQ Power flow and short circuit solution parameters are stored in the SAV, RAW and SEQ files The exact solutions can be replicated when re-opening or transferring case data

Branch Names and 12 Ratings Sets Branch names are supported Must be unique (future PSS®E versions will use as key fields for APIs, contingency definitions, reports, etc) There are now 12 ratings sets with customizable names and descriptions Use for various conditions, seasons, time limits, or anything you want. Select from these 12 ratings for single line diagram loading results, ACCC violations, etc

Results Spreadsheets Spreadsheets for results (and totals data) for network elements and aggregations Examples: Branch spreadsheet with all branch flows and losses Fixed shunts spreadsheet with actual MVAR Area spreadsheet with total load, losses and interchange

Dynamics Models New IEEE 421.5 Models ST1C, ST5C, ST7C, AC1C, AC2C, AC3C, AC4C, AC5C, AC6C, DC1C, DC2C, AC6A New Governor Model (Pratt amp; Whitney Turboden turbine-governor) PWTBD1 New Machine Protection Model (V/Hz Generator Relay Model) VPERHZU1 The following user models have been converted to standard models DCTC1 is now DCTC1T LOEXR1 is now LOEXR1T

PSS®E 34 Demo

Questions siemens.com/answers Joe Hood PSS®E Product Manager Phone: +1.803.397.8539 email: joseph.hood@siemens.com Glenn Pietrow PSS®E Development Manager Phone: + 1.518.395.5196 email: glenn.pietrow@siemens.com siemens.com/answers