Dynamo Team Careful Harry Glenda Alvarenga J.J. Busse Emily Eggers Adam Kemp Gabrielle Massone Dalton Smith Corey Wilson Launch Readiness Review.

Slides:



Advertisements
Similar presentations
Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Advertisements

Clean Air Project: Team Big Green SpaceGasm Final Presentation Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong.
Space Debris Conceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth
Solar Cell Efficiency Flight Readiness Review Teddy Bounds Angela Dunn Joel Sasser.
Clean Air Project: Team Big Green SpaceGasm Launch Readiness Review Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin.
Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
Team Lightning Rod Launch Readiness Review Fall 2010 Rev C 11/2/2010 Trevor Luke Chris Bennett Matt Holmes Sushia Rahimizadeh Alex Shelanski Matthew Dickinson.
DYNAMO TEAM 2 CAREFUL HARRY CONCEPTUAL DESIGN REVIEW GLENDA ALVARENGA J.J. BUSSE EMILY EGGERS ADAM KEMP GABRIELLE MASSONE DALTON SMITH COREY WILSON SEPTEMBER.
Team 2 Careful Harry Glenda Alvarenga J.J. Busse Emily Eggers Adam Kemp Gabrielle Massone Dalton Smith Corey Wilson Dynamo Critical Design Review.
Team 7, Final Presentation December 1, Mission Overview Send up petri dishes containing bacteria Analyze the effects of temperature, pressure, and.
Adam Archuleta Katie Cartee Logan Farley Patrick Klein Kamron Medina Catherine Villa TEAM INFINITY AND BEYOND LAUNCH READINESS REVIEW Fall 2011 Rev C
Team Mate Final Presentation Amelia Weller, Ethan Long, Erick Chewakin, Jason Schelz, Will Hakes, Brendon Barela, Emma Mossinger 12/2/10.
{ Dynamo Careful Harry Glenda Alvarenga J.J. Busse Emily Eggers Adam Kemp Gabrielle Massone Dalton Smith Corey Wilson.
Brynn Larson Trey Karsten Terek Campbell Marcus Flores Marcell Smalley Shunsuke Miyazaki 2015/6/10 Team Ochocinco.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
Team Delta Special Recon Ops Launch Readiness Review Taylor Boe Andrew Gilbert Bobby Stillwell Emily Howard Grace Harsha Andrew Buckner November 11, 2008.
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Team D.S.R.O Taylor Boe Andrew Buckner Andrew Gilbert Gracie Harsha Emily Howard Bobby Stillwell September 23, 2008.
Daniel Sayle, Patrick Byrne, Sarah Kemp, Anna McLeland, Katie Thompson 11/2/10 TEAM MUNCHIES LAUNCH READINESS REVIEW.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Team Zephyr Critical Design Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright October 14, 2008.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.
Team R3D3 Final Presentation Devon Campbell Greg McQuie Kate Kennedy Henk Wolda Marisa Antuna Nicole Ela Tyler Smith 12/1/11.
Team S.H.I.E.L.D Launch Readiness Review Team Members Evan Coffey Aaron Holt Travis Pollok Matthew Ross Jared Turner Addison Woodward-Parrish 11/11/08.
Team Helios. Mission and Experiment Mission: Launch a balloonsat to determine the light filtering effect of the atmosphere and test the effectiveness.
Chouinard, John Getz, Jennifer Hewitt, Lisa Kim, Elise Salmons, Patrick Silva-Ortiz, Carlos.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn December 7, 2006.
Team BIOHAZARD Presents: Project CRUENTO. CRUENTO: Latin – to make bloody; stain with blood.
Space Debris Critical Design Review Cole Bostrom Corey Godwin Jonathon Kirchmaier Emily Logan Sean Murphy Seanna Renworth October 14, 2008 Fall 2008 Rev.
Carnivorous Ninja Warriors Launch Readiness Review Katie Brissenden, Hannah Williams, Aram Podolski, Kat Bryant, Arley Hendrick, Cam Comeau November 5,
GloboGym Fighting Cobras Conceptual Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards September 21, 2006 Project.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Team Zephyr Launch Readiness Review Joseph Sheehey, Huy Le, Andrew Zizzi, Alex Morrow, Sam Evans, Logan Wright November 11, 2008.
Team Hubble Jr. Final Presentation Rachel Small, Holly Zaepfel, Ryan Del Gizzi, Kyle Norman, and Evan Levy December 5, 2006.
Launch Readiness Review 11 Nov Brady Phillips, Elliot Guber, Brandon Campbell, Dushyant Dhundra, Joel Mendez, Cameron Trussell.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
Design Review Corinne Desroches Saad Alqahtani Charles MacCraiger Alexa Warly Connor Jacobson Kyle Skjerven Matt Busby.
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Conceptual Design Overview
Thomas Jeffries, Anthony Anglin, Dylan Cooper, Dustin Fishelman, Colin Harkins, Joao Mansur, Starteya Pais, Andrew Trujillo 10/2/2012.
SPIRIT of the Koala Project VOLT Critical Design Review Anthony Anglin, Colin Harkins, Dylan Cooper, Thomas Jefferies, Starteya Pais, Joao Mansur, Andrew.
Lucas Ibarra Alexis Sutker Evan Long Jack Oblack Jaevyn Faulk Dylan Anderson Devon Connor Eric Hardwick October 18, 2012.
Team Andromeda Lucas Ibarra Alexis Sutker Evan Long Jack Oblack Jaevyn Faulk Dylan Anderson Devon Connor Eric Hardwick 2 October 2012.
Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung Fall 2011 Rev A
Hang Seven Launch Readiness Review Lucas Migliorini, Becca Lidvall, Paul Smith Chase Goodman, Ethan Hollenbach, Nikhil Desai, Abby Caballero, Sierra Williams.
Hang Seven Critical Design Review Sierra Williams, Lucas Migliorini, Abby Caballero, Chase Goodman, Paul Smith, Becca Lidvall, Ethan Hollenbach, Nikhil.
Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya 5 November, 2009.
Space Monkeys Launch Readiness Review Project Curious George November 11, 2008 Project Curious George November 11, 2008.
Zachary Cuseo, Sydni Smith, Andrew Fruge’, Tyler Knappe, Christopher Nie, and Shweta Maurya 8 October 2009.
Evan Akselrad, Chris Anaya, Natalie Bixler, Melanie Dubin, Logan Finch, Ted Maritz, and Scott Williams November 11, 2008.
Team SSCSC Critical Design Review Nick Brennan, Kier Fortier, Tom Johnson, Shannon Martin, Dylan Stewart, and Adam Wright October 05, 2010 Fall 2010 Rev.
Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.
Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung Fall 2011 Rev C
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
Hillary Beltran, Edward Crawford, Nicole Harris, Edward Lowe, Emily Proano, and Kevin Wong 05 October 2010.
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Colorado State University Paul Scholz, Tyler Faucett, Abby Wilbourn, Michael Somers June
Spring REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL (RFP) NUMBER: 2500-SP03 FOR DESIGN CONCEPT OF THE Balloon Satellite (BalloonSat) PROPOSALS ARE.
Junk in a Box Critical Design Review
O2n Cloud Nine Critical Design Review
Team S.H.I.E.L.D. Final Presentation
Team Go Go Gadgets Launch Readiness Review
Team Thumbs Up Final Presentation
S^3 Launch Readiness Review
Space Debris Critical Design Review
Launch Readiness Review
Team Up, Up, and Away Launch Readiness Review
Team TWSS Launch Readiness Review
Team SCREAM Launch Readiness Review
Presentation transcript:

Dynamo Team Careful Harry Glenda Alvarenga J.J. Busse Emily Eggers Adam Kemp Gabrielle Massone Dalton Smith Corey Wilson Launch Readiness Review

Mission To investigate high altitude power generation from the motion of Dynamo using a Kinetic Energy Generator (K.E.G.)

Design Overview Foamcore Insulation Aluminum Tape

Design Overview Arduino Uno with microSD Shield Arduino configured with K.E.G

Design Overview Canon SD780 Camera HOBO Data Logger

Design Overview Heater and Batteries

Test Results 3 Primary Types of Testing  Generator (K.E.G.)  Technical  Structural

Min X Acceleration (-3.2 G) Min Z Acceleration (-2.1 G) Min Y Acceleration (-2.9 G) Baseline X, Y, Z acceleration at rest

Technical Testing  Arduino  Source code debugging through compiler  Ran all code for sensors through serial port/serial monitor to ascertain proper function  Installed and tested microSD shield and card for data logging  Precautions taken to avoid data overwrite upon start up  Files loaded onto computer from microSD card via SD Card to USB reader  Data transferred to excel worksheets and analyzed

Technical Testing  Camera  Allowed to run during all tests – successfully took pictures at 10 second intervals  HOBO  Successfully gathered internal/external temperature and humidity data throughout duration of cold test  Heater  Demonstrated some malfunction during cold test  Excessively low temperatures cause resistors to stop working  Performs successfully at all other times

Technical Testing  Cold Test  Tried 3 times – still inconclusive  Follow-up testing to determine if structure and insulation are adequate  Miscellaneous  All switches, wires, solder joints, and other circuitry are performing successfully

Final Temperature too high Starting Room Temperature

Temperature goes up?

Supposedly Internal Initial Temperature

Structural Tests  Whip test  Initially failed due to string breakage – string too weak  Successful test with proper flight string  Drop/kick Test  Survived inadvertent fall down three stories in DLC  Maintained integrity through most severe testing, with little visible damage

Predicted Results  Dynamo will generate a measurable amount of energy, likely in the range of millivolts to centivolts  HOBO will gather temperature and humidity data  Camera will take pictures at 10 second intervals throughout the flight  Structure will survive the trip and be ready for a relaunch

Biggest Worries  Satellite becomes too cold – cold test inconclusive 3 times  Energy generated is not significant enough to register on the sensor  Unnoticed errors in coding compromise data collection  General technological malfunctions  Flight string is compromised and Dynamo is lost

Compliance Matrix #RequirementFulfillment 1.01 Our experiment shall use the motion of the BalloonSat to generate electricity and charge a battery. Successful construction and testing of generator After the BalloonSat lands it shall still be in working order. Successful kick and drop tests The flight string interface shall be a PVC tube that runs through the BalloonSat and shall not pull through the BalloonSat or interfere with the string. We shall use washers on both sides of the tube and pins that dissipate the pressure onto the washer, preventing the string from being pulled through. Successful whip tests and integration of flight tube through center of structure The BalloonSat shall remain above -10° C internally during the entire flight. Successful cold tests and construction of heater The total weight shall remain less than or equal to 850 grams. Total weight was less than 850 grams We shall acquire the ascent and descent rates of the BalloonSat. Accelerometer measures changes in flight velocities Our design shall include a HOBO H Successful integration and data collection during cold test.

1.08 Our design shall include an external temperature cable. External cable is connected to HOBO Our design shall allow for a Canon SD780.Successful integration of camera in the corner of Dynamo BalloonSat shall include an active heater system weighing 100 grams with batteries. Successful construction and test of heater BalloonSat shall be made of foam core.Successful construction of structure using foam core Our budget shall include a parts list, including spare parts. Budget is complete and maintains a surplus The design shall allow for and present on the outside of the satellite contact information for the Careful, Harry! team as well as an American flag. Successful placement of USA flag and contact information on exterior All units presented in the design, construction, and use of the satellite shall be expressed only in the metric system. Metric system was used for all calculations and dimensions 1.15 The satellite shall be fully constructed and prepared for launch and recovery no later than November 5, 2011, and at least one team member shall agree to participate in the retrieval of the satellite. Successful construction and test of entire satellite and components.

1.16 Nobody, at any time, or in any phase of this project, shall be injured in any way. No one was injured during construction and testing All hardware and other materials used are a part of the Gateway to Space program, and shall return to Professor Koehler at the end of the semester in full working order and absolutely no damages. All material is in working order with no damages All purchases using Professor Koehler's CU Visa for parts shall be recorded in extreme detail on the budget, and all receipts from any purchase made shall be kept and turned in to Professor Koehler within 48 hours of the purchase. Furthermore, a copy of the Gateway order form, HW 04, shall be provided alongside every purchase that is made. These purchases shall only be made after an appointment with Professor Koehler. Successful recording of purchases, and submission of all receipts for payment and/or reimbursement The satellite design shall not allow for any living organism to be included on the payload. Payload does not include any living organisms The design of the satellite shall include a visual indicator on the outside of the craft that confirms the payload is fully functional and running. Switches, button, and flashing LED light indicate proper function.