Licensing Options for the First US Demonstration Fusion Power Plant S. Abdel-Khalik ARIES Meeting, San Diego (February 3, 2008) G. W. Woodruff School of.

Slides:



Advertisements
Similar presentations
New Reactors: NRC Plans, Process, and Progress David B. Matthews Director Division of New Reactor Licensing February 28, 2008.
Advertisements

New Nuclear Plants in the United States
A Joint Code of Practice Objectives and Summary Presentation
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Action Plan Skills Building: Module 2 Defining Action Plan Purpose and Scope January 2013.
Albert Coons April 21, 2009 Emergency Preparedness and New Reactor Licensing Process: An Update on Where We Are Now Federal Emergency Management Agency.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
Dr. Jose Pires Structural, Geotechnical and Seismic Engineering Branch
PERMITTING CHALLENGES FOR THE NEW GENERATION OF NUCLEAR POWER PLANTS Ping Wan Bechtel Power Corporation Ninth Nuclear Utility Meteorological Data Users.
Licensing of Nuclear Power Plants in Pakistan
School for drafting regulations Nuclear Safety Combined licensing approach Vienna, 2-7 December 2012 Tea Bilic Zabric.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
FDA’s Pharmaceutical Inspectorate Robert Coleman National Expert Drug Investigator Food and Drug Administration.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
The Nuclear Renaissance & Research Opportunities in the Nuclear Field Dr. Annie Kammerer PEER NEES Quake Summit 2010 San Francisco, California October.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative Larry Burkhart, Chief, AP1000 Projects Branch (LB4) Division of New Reactor Licensing NRC’s.
Nuclear Energy: Safety, Radiological Protection and Physical Security in the post-carbon era (Energía Nuclear: Seguridad, Protección Radiológica y Seguridad.
New Nuclear Power Plants Need and Status ASQ-EED 31 st Energy & Environmental Division Conference September 12, 2004 Adrian Heymer, NEI
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
A NUCLEAR RENAISSANCE Ping Wan The Tenth Nuclear Utility Meteorological Data Users Group Meeting June 2005.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
ACADs (08-006) Covered Keywords CFR policy, CFR violation, CFR enforcement Description Supporting Material
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
1 RIC 2009 Engineering Issues Design Acceptance Criteria Laura Dudes Deputy Director, Division of Engineering NRO/DE March 11, 2009.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
Project Licensing Status Jim Kinsey Director, Regulatory Affairs NGNP Project.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
New Reactor Licensing R. William Borchardt Director, Office of New Reactors US NRC February 19, 2008.
Developing a Data Base Supporting Very long- term Storage of Spent Nuclear Fuel R E Einziger, Ph.D., E. Benner, and C. Regan Spent Fuel Storage & Transportation.
1 Moving Forward with the USEPR Greg Gibson Vice President Regulatory Affairs.
1 RIC 2009 Perspectives on Digital I&C Licensing in the 10 CFR 52 Environment Thomas R. Fredette, PE NRO/DE/ICE2 March 11, 2009.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
A Mid-Process Review Marilyn C. Kray Vice President, Exelon Generation President, NuStart Energy Development Regulatory Information Conference March 10,
NPP Vendors Perspectives TM/WS Infrastructure Development 9-12 February 2010 Breakout session – Group 4.
International Atomic Energy Agency M. El-Shanawany IAEA Technical Support & Capacity Building Programme M. El-Shanawany Department of Nuclear Safety &
RIC 2009 Construction Inspection Program: Industry Perspectives Russ Bell Director, New Plant Licensing March 11, 2009.
1 NRC Update R. Brad Harvey, Leta Brown US Nuclear Regulatory Commission th NUMUG Meeting, Wilmington, NC.
1 RIC 2009 NRO New Reactor Design Reviews and Engineering Jennifer Dixon-Herrity USNRC/NRO/DE March 11, 2009.
Adding Nuclear Power to the Grid ASQ Energy and Environmental Conference August 28, 2006.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
1 RIC 2009 Design Acceptance Criteria: Searching for Acceptance Andrea Sterdis Tennessee Valley Authority March 11, 2009.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
Quality Assurance National Nuclear Standards C. H. Moseley, Jr. 33 rd National Energy & Environmental Conference August 28, 2006.
1 IRDP Courses and Workshops ― March 2015 U.S. NRC INTERNATIONAL REGULATORY DEVELOPMENT PARTNERSHIP (IRDP) UPDATE on COURSES AND WORKSHOPS Presented by.
New Plant Regulatory Issues Kati Austgen Washington International Representatives Meeting July 12, 2012.
NFPA 805 AND CONFIGURATION MANAGEMENT JIM LECHNER JUNE 7, 2016.
United States Nuclear Regulatory Commission NRC’s Risk-Informed and Performance- Based Approach to Decommissioning DOE Workshop on Risk-Based End States.
Proposed Revisions to 10 CFR Part 61
Flooding Walkdown Guidance
Nuclear Power Update for The Society of American Military Engineers
NRC Cyber Security Regulatory Overview
Dr. Nils J. Diaz 28th Annual Bonbright Center
Regulatory review and assessment
Regulatory review and assessment
Adding Nuclear Power to the Grid
Plant Parameter Envelope for Early Site Permits
Research and Test Reactor Decommissioning Inspections
Instrument PDR Summary of Objectives
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
William D. Reckley, Branch Chief
Anna Bradford, Deputy Director Division of New Reactor Licensing
RESOLUTION OF GENERIC SAFETY ISSUE 191
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Licensing Options for the First US Demonstration Fusion Power Plant S. Abdel-Khalik ARIES Meeting, San Diego (February 3, 2008) G. W. Woodruff School of Mechanical Engineering Atlanta, GA 30332–0405 USA

2 Current Licensing Options Applicability to First US Demonstration Fusion Power Plant Conclusions/Observation Outline

3 10 CFR Part 50:  Preliminary Design at Construction Permit (CP) stage  Final Design at Operating License (OL) stage  More detailed information can be provided at CP stage 10 CFR Part 52:  Combined License (COL)  Early Site Permit (ESP) & COL  Design Certification & COL  ESP, Design Certification, and COL Licensing Alternatives

4 Preliminary Design at CP; Final Design at OL:  Could start construction sooner  Providing preliminary design will result in greater licensing and financial risk, but applicant may provide final design information under 10 CFR 50.35(b) to reduce risk  There is reduced predictability on construction verification because Part 50 does not provide for Inspections, Tests, Analysis, and Acceptance Criteria (ITAAC) 10 CFR Part 50 Processes

5 COL:  Reduced Licensing & Financial Risk; 1 mandatory hearing; 1 opportunity for hearing on ITAAC Design Certification & COL:  Longer review duration; Design certification of prototype may not be desirable;1 mandatory hearing; 1 opportunity for hearing on ITAAC ESP & COL:  Location on remote government property reduces need for ESP; 2 mandatory hearings; 1 opportunity for hearing on ITAAC ESP, Design Certification & COL:  Longer review duration; design certification of prototype may not be desirable; 2 mandatory hearings; 1 opportunity for hearing on ITAAC 10 CFR Part 52 Processes

6 Optimum Approach:  First Demonstration Fusion Power Plant Applicant should submit a COL application under 10 CFR Part 52 for a prototype reactor. –Results in shortest review duration –Reduced licensing risk –Lowest resource expenditure –NRC review would likely require a minimum of 5 years. Applicability to Demonstration Fusion Power Plant

7 Defense-in Depth Use of PRA in the Licensing Process Source Term Containment Functional Performance Potential Policy Issues

8 Phenomena Relevant to Fusion Power Plant Safety  Assessment of Knowledge base for important Phenomena  Assessment of data gaps and adequacy of analytical tools  Development needs for analytical tools Confirmatory Analysis Tools in Various Technical Areas  Modify/adapt existing tools for fusion reactor applications; supplement with special purpose tools as necessary  Using tools and data from domestic and international programs to the maximum extent possible while maintaining independence of the analysis Potential Needs/Gaps in Licensing

9 Technical Basis Infrastructure  Development of Codes and Standards  Technical Basis to support development of Tech Spec Requirements Licensing Review Infrastructure  Regulatory guidance  Staff training and skill development Other Infrastructure Needs/Gaps

10 Current US Licensing Processes may impose significant constraints on the timeline for development/commissioning of the first demonstration fusion reactor  Staffing needs and methods development to assure thoroughness and independence of the regulatory review may result in significant delays  Technical Bases to support development of Tech Spec Requirements Early discussions with (and involvement of) the US NRC in technology development process will be vital to successful commercialization of fusion power reactors Conclusions/Observation