1 Nuclear Safety and Regulatory Considerations for Nuclear Hydrogen Production
William D. Reckley, Branch Chief Project Management & Technical Review Branch Advanced Reactor Program Office of New Reactors

2 Energy Policy Act of 2005 The NRC shall have licensing and regulatory authority.... The DOE and NRC shall jointly submit ...a licensing strategy for the prototype nuclear reactor... Not later than September 2011, DOE shall select the technology for high temperature hydrogen production and initial design parameters for the prototype nuclear plant... Not later than September 2021, complete construction and begin operation...

3 Part 50 Licensing Process
NRC Review x Construction Permit Hearing NRC Review x Operating License Hearing Construction Operation Construction Permit Application Operating License Application Wolf Creek Nuclear Generating Station

4 New Plants Proposed in the US
TBD - TBD - ABWR -

5 NRC History with Gas-Cooled Reactors
Licensed Peach Bottom 1 Fort St. Vrain Pre-application review of Modular High Temperature Gas-Cooled Reactor (MHTGR) Preapplication Discussions with Exelon/PBMR Ongoing Discussions with DOE/NGNP

6 Preparing for NGNP NUREG/CR-6944
NGNP Phenomena Identification and Ranking Tables (PIRTs) Volume 6: Process Heat and Hydrogen Co-Generation Chemical Releases Process Thermal Events Heat Transport System Failures Reactor Events that Impact the Chemical Plant

7 Hazards from hydrogen/chemical facility: Chemical releases Explosive
Flammable Corrosive Toxic Suffocation Operators Nuclear Plant

8 Close Coupling of Nuclear and Process Plant: Loss of heat load
Temperature transients / cycles Process heat exchanger failure Intermediate heat exchanger failure Loss of intermediate fluid PHX (IHX)

9 Reactor Impacts on Process Facility
Tritium Migration to Product Radiological Releases through Hxs General reactor transients (e.g., reactor trips)

10 NGNP Licensing Strategy
Joint DOE/NRC Licensing Strategy submitted to Congress in August 2008 Success depends on: productive use of pre-application period (now to 2013) meeting major milestones, including supporting research and code development developing supporting regulatory infrastructure Prototype may include compensatory measures to address uncertainties in the design (e.g., caused by delayed demonstration testing)

11 Going Foward Assess gaps in regulations and guidance
Identify and propose resolution of key technical and policy issues, such as: Process heat applications Emergency preparedness Staffing requirements Containment functional requirements Coordinate licensing and research programs