PKI-Anwendungen 6/2/2015 1 Base framework. PKI-Anwendungen 6/2/2015 2 Bottom frame.

Slides:



Advertisements
Similar presentations
Common Components of a Traditional Wood Framed Building
Advertisements

Magnet mur de plomb PRS, SPD Photo: Peter Ginter.
Mezzanine Floor.
Drawing furniture using One Point Perspective
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Glenn Murcutt SRT 251 Construction and Structures Warehouse and Office complex scenario Stacy Ambelas
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
1 Light 1 C 70” Project Layout AFF. AFF is the abbreviation for 2 1.After first fire 2.Above finished floor 3.Above flat floor 4.At first floor 5.Average.
Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, Copying permitted for purchasing institution.
Foundation Systems.
Chapter 4: Sheet Metal Forming
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Wood Frame Construction Common Components of a Traditional Wood Framed Building Gateway – Unit 7 – Green Architecture © 2012 Project Lead The Way, Inc.Green.
ATLAS End-Cap C Proposed Transport Box P Cooke 15 June 2005.
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
Rectangular framed structures
5.8m Solar House Installation Instruction. Introduction Step 1. connect the corner panels Step 2. connect the back and side wall panels Step 3. Install.
Chapter 4: Air Leakage Control: Materials and Techniques
1 CNS/GSS/2008/M4 1 Module 4 Metal Enclosures – Various types.
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
SeaPerch Design Challenge and Construction Overview.
The Microwave Oven Introduction.
ASSIGNMENT Begin on page 197 “The Foundation”.
Energy Performance and Moisture Control of Ceilings and Roofs 1.
The electricians have first to mark the walls so they know where to cut tracks for the conduit and the joiner fits the stud walls so first fix plumbing.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Common Components of a Traditional Wood Framed Building
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
1 PFP Peer iCDR /9-11 Particles and Fields Package (PFP) Peer Instrument Critical Design Review SWIA Mechanical Gregory Dalton Gregory Johnson UCB-SSL.
Attentuators & Outlets Attentuators & Outlets. Outlet Connections ESP >
JLAB CLAS12 Torus Structure The cold mass is composed of 6 coils, each inside a coil case, joined together at the inner radius by a hub and at the outer.
Beekeeping Equipment What you Really Need Vs. What you Think You Need Vs. What you Want.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
The Skeletal System (HB Chapter 2) Lesson 1. Backbone made up of 26 small bones. vertebrae.
1 Presentation 15: WALL COMPONENT IDENTIFICATION.
WALL COMPONENT IDENTIFICATION
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
SIZE - Top SERVER ROOM Designed by – openbox |
APPLICATIONS OF TECHNOLOGY
Exercise #2 (part 2) Based on what you read in Chapter 4, determine if the corridors and exit doors meet the requirements for egress width, according to.
GROWING A NUC The first year's task after receiving a nuc is to grow it into a colony that can survive the winter This requires a population of bees and.
How can I find the area and perimeter of a rectangle? MCC.4.MD.3.
When all the walls have been coated with Carlite finish and dried the plumbers can return to fit all the necessary pipe work and the radiators. Then a.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
First Wall Panel - Overview
Common Components of a Traditional Wood Framed Building
Common Components of a Traditional Wood Framed Building
ATLAS Internal ID Service Integration
APPLICATIONS OF TECHNOLOGY
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Baby-MIND Modules & Services
Drawing Alcoves using One Point Perspective
Wood Frame Systems Civil Engineering and Architecture®
First of all we will remind some numbers:
Test box for ProtoDUNE SP – Integration Test
Objective 6.02 part 1: Recognize components of construction
Common Components of a Traditional Wood Framed Building
Beekeeping Equipment What you Really Need Vs. What you Think You Need
Wire Wrap Pipe Base Well Screens. Pipe Based Well Screens.
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Common Components of a Traditional Wood Framed Building
Project 2018 October 31, 2018.

Common Components of a Traditional Wood Framed Building
Reader Swap out Guide.
Using electricity safely
Common Components of a Traditional Wood Framed Building
After service guide for changing PCB
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

PKI-Anwendungen 6/2/ Base framework

PKI-Anwendungen 6/2/ Bottom frame

PKI-Anwendungen 6/2/ Setting up of frame bars

PKI-Anwendungen 6/2/ Setting up of Cover frame

PKI-Anwendungen 6/2/ Frame bar connection

PKI-Anwendungen 6/2/ Frame bar skeleton

PKI-Anwendungen 6/2/ Subassembly of outer cover

PKI-Anwendungen 6/2/ Connector pipes

PKI-Anwendungen 6/2/ Inner wall partly assembled

PKI-Anwendungen 6/2/ Floor construction

PKI-Anwendungen 6/2/ Feed Throughs

PKI-Anwendungen 6/2/ Penetration Detector wiring

PKI-Anwendungen 6/2/ Connections inside

PKI-Anwendungen 6/2/ Detector connection box

PKI-Anwendungen 6/2/ Inner Seals

PKI-Anwendungen 6/2/ Finishing artwork

PKI-Anwendungen 6/2/ Read for use...