Solid StateTracking R&D activities in Europe ALCPG 2004 Winter Workshop SLAC, January 7-10, 2004 World-Wide review of Linear Collider Tracking Aurore Savoy-Navarro,

Slides:



Advertisements
Similar presentations
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Advertisements

Hervé Lebbolo, François Rossel, Aurore Savoy-Navarro LPNHE-Universités de Paris 6&7 TOPICS: Main parameters of the Si-Envelope Front-End Issues: Long shaping.
Aurore Savoy-Navarro LPNHE-Universités de Paris 6&7 SilC Collaboration R&D Advances since St Malo Si-Envelope design Mechanics Electronics Future Prospects.
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
3/1/05 Status of the SHBD for the NUMI OPERA exposure D. Autiero IPN Lyon  Reminder about the proposed setup for the SHBD  Status of the sub-detectors.
Tracking Group Overview Bruce Schumm Cornell Linear Collider Workshop July
Snowmass 2005 SOI detector R&D Massimo Caccia, Antonio Bulgheroni Univ. dell’Insubria / INFN Milano (Italy) M. Jastrzab, M. Koziel, W. Kucewicz, H. Niemiec.
Third International Conference on Frontier Science Villa Mondragone – Monteporzio Catone Physics and Astrophysics in Space June 14, 2004 Mercedes Paniccia.
SiLC Front-End Electronics LPNHE Paris March 15 th 2004.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
SiTRA brief status report to the EUDET S.C., August 31 st 2009 Members: Helsinki University and VTT(Helsinki), LPHNE-UPMC/CNRS-IN2P3 (Paris), Charles University.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
Johann Zmeskal, Stefan Meyer Institute for subatomic Physics Vienna, Austria INPC 2010, Vancouver JointGEM Project Status Report 3 rd JointGEM Meeting.
SiLC (Silicon tracking for the International Linear Collider) H.J.Kim (KyungPook National U.) on behalf of the SILC R&D Collaboration.
1 Conceptual design adopts state-of-the-art silicon sensor techniques (compare ATLAS/CMS/ALICE inner tracker layers, BaBar tracking of B mesons). Design.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
ECFA-DESY Extended Studies NIKHEF, Amsterdam 1st to 4th April, 2003 Tracking session 31st March 2003 SilC: an International R&D Collaboration to develop.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
Silicon Tracking Systems in Mokka Framework Valeri Saveliev, Obninsk State University.
SILC:Silicontracking for the InternationalLinearCollider SILC: Silicon tracking for the International Linear Collider Aurore Savoy-Navarro, LPNHE-UPMC/IN2P3-CNRS.
Tobias Haas DESY 8 November 2005 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET First general ideas (with some interludes)
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Tracking Group Overview Bruce Schumm SLAC Linear Collider Workshop January
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
GLD Intermediate tracker task list Configuration & software Silicon Sensor Electronics Support structure H.J.Kim, Kyungpook U. for intermediate tracker.
Si Tracking Software ILD Software Meeting, 27 January 2010 Ecole Polytechnique, Palaiseau, France Winfried A. Mitaroff HEPHY Vienna, Austria Si Tracking.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
Ultra-Fast Silicon Detector 1 Aide memoire: we are exploring the possibility of using silicon detectors with moderate gain to achieve ~ 20 ps time resolution.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
Review of SiLC activities LPNHE/ IN2P3 / CNRS / U. Paris VI & VII: J.E.Augustin, G.Badet, A.Charpy, C.Ciobanu, J.David, M.Dhellot, W.da Silva, G.Daubard,
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Progress Report since last ECFA-DESY, Prague Nov ’02 Aurore Savoy-Navarro, LPNHE-Universités de Paris 6/IN2P3-CNRS  Sensor & Electronics Test bench 
1 JRA2-SITRA status report Z. Doležal, A. Savoy-Navarro for JRA2-SITRA partners (LPNHE Paris, Ch.U. Prague, Helsinki, Santander) and associates (CNM Barcelona,
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
On a eRHIC silicon detector: studies/ideas BNL EIC Task Force Meeting May 16 th 2013 Benedetto Di Ruzza.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
Vertex detector R&D Work Plan in /3/11 Y. Sugimoto for KEK-Tohoku-TohokuGakuin-Niigata- ToyamaCMT Collaboration.
Aurore Savoy-Navarro 1), Albert Comerma 2), E. Deumens 3), Thanh Hung Pham 1), Rachid Sefri 1) 1) LPNHE-Université Pierre et Marie Curie/IN2P3-CNRS, Fr.
Silicon Tracking for CLIC experiments Aurore Savoy-Navarro, LPNHE Université Pierre et Marie Curie/CNRS-IN2P3 CLIC08 WORKSHOP, October 2008, CERN.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Latest from the SiLC R&D Aurore Savoy-Navarro, LPNHE-Paris/IN2P3-CNRS On behalf of the SiLC collaboration: U. of Michigan, UCSC-Santa Cruz, IMB-CNM/CSIC,
Charles University Prague Institute of Particle and Nuclear Physics Zdeněk Doležal, Peter Kodyš, et al.
 13 Readout Electronics A First Look 28-Jan-2004.
Silicon Tracker Data Acquisition and Electronics for the Linear Collider Jean-Francois Genat LPNHE Universite Pierre et Marie Curie CNRS/IN2P3 On behalf.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Detector building Notes of our discussion
Electronics of the Silicon Envelope
Jean-Francois Genat LPNHE Universite Pierre et Marie Curie CNRS/IN2P3
TK Upgrade report.
Toward the final design of a TPC for the ILD detector
Valerio Re (INFN-Pavia) on behalf of the RD53 collaboratios
A First Look J. Pilcher 12-Mar-2004
Design and fabrication of Endcap prototype sensors (petalet)
Status report on the SiLC ongoing activities
5% The CMS all silicon tracker simulation
Vertex Detector Overview Prototypes R&D Plans Summary.
SiD Tracker Concepts M. Breidenbach
Peter Kodyš, Zdeněk Doležal, Jan Brož,
HL-LHC upgrade at IPHC news
SVT detector electronics
Presentation transcript:

Solid StateTracking R&D activities in Europe ALCPG 2004 Winter Workshop SLAC, January 7-10, 2004 World-Wide review of Linear Collider Tracking Aurore Savoy-Navarro, LPNHE-Paris, on behalf of the European component of the SiLC Collaboration

R&D Framework = SiLC SiLC = Worldwide R&D Collaboration on Si-Tracking for the Linear Collider, proposal submitted to the PRC-DESY, 7-8 May 2003 (DESY-PRC ) and Addendum on October 31 st 2003 (PRC-Addendum): R&D program for 3 years, i.e. until end European Institutes in SiLC (in parenthesis ongoing Si-tracking activity apart from SiLC): CNM-Barcelona (Spain) (SCT-ATLAS) DPNG-University of Geneva (Switzerland) (AMS & SCT-ATLAS) Helsinki University (Finland) IEKP, University of Karlsruhe (Germany) (Si-tracker in CMS) Obninsk State University (Russia) LPNHE-Paris (France) INFN-Pisa (Italy) (Si-tracker in CMS, Si-tracker CDF II and GLAST) Charles University in Prague (Czech Republic) (SCT-ATLAS) University of Roma 1, La Sapienza (Italy) Torino University (Italy) (Si-tracker in CMS and in ALICE) Academy of Sciences, Wien (Austria) (Si-tracker in CMS) Large expertise from LEP, B-factories, CDF, LHC and AMS + GLAST and several well equipped Lab/test bench capabilities

1.- R&D on sensors  Existing expertise and close contacts with Industrial firms from ongoing (LHC, CDF or AMS) or previous experiments (LEP and B-factories)  This activity is coordinated by Vienna  Main Institutes and firms involved: Vienna with Hamamatsu & others LPNHE=Paris with Hamamatsu Torino with ST Microelectronics & connected small firms in Italy (Catania and Trento) Obninsk CNM is developing possibility to produce wafers  For the time being the goals are on developing larger, thinner, higher yield, possibly double-sided wafer keeping the pitch ≤ 100 µm  Most of the Institutes are concentrating on long microstrips, some have also experience on Si-drift (ex: Torino)  Test bench facilities are existing in: Geneva, Karlsruhe, Prague, Paris, Torino, Vienna, using LD 1060 nm and/or radioactive source Interest in cross checking results (see next transparency)

First results on the Long Ladder prototype Pedestal Signal Sigma(Pedestal) Sigma(Signal) Labview based test bench (Paris) Test with the laser LD1060nm on 224cm long strip Prototyped long ladder (made by Geneva + ETHZ + Paris), read out with VA64hdr Special output Kapton designed to allow serpentine cabling such as to have strips of variable length, i.e.: (1, 2, 4 and 8) modulo 28 cm = 28, 56,112 and 224 cm strip length on this prototype.

First results on Long ladder prototype cont’d Good signal reproducibility over time and channels. Preliminary results are encouraging. Much more to come. The results between the Geneva & Paris test benches are cross-checked and show a good agreement.

2.- R&D on Electronics Two main streams are presently pursued for the long microstrips:  Design of a new F.E. architecture (LPNHE-Paris)  Developing a new version of existing F.E. based on IDEAS chips (Vienna, Karlsruhe and IDEAS) Main features of the new FE architecture under designed at LPNHE: Submitted for foundry towards May 2004

LPNHE-Paris 6, November 2003 Charge amplification & analog storage + time tagging Readout &processing stage

Shared ADC and Storage Ramp Counter Clock Vernier Channel #, Charge & Time Storage Comparators Charge data Time data Control Start Data out Shared ADC function Deep SubMicron CMOS: (UMC 0.18  m) LPNHE-Paris6, November 2003 UMC 0.18 µ techno 4µsec conversion time 10 bits (250MHz internal clock) 40 µWatt/ch A/D working at the end of the bunch train (during DAQ period) (Wilkinson ADC type)

ADC simulations (techno UMC 0.18 micron) ECFA Montpellier 11/13/03 LPNHE-Paris Power dissipation/ch = 40 µWatt Ramp generator One comparator/ch Comparator Output (in Volts) time(µsec) 4 µsec A/D conversion of 5 equally spaced voltages: SPICE output

3.- R&D on Mechanics Main issues: Material budget thus XXXXXXXXXXXLight structure & long microstrips (ladders) Material choice (light, good mechanical & thermal properties) Reduction of the cooling system at minimum minorum Integration studies including electronics & cabling on detector Very large surfaces with: Modularity (long ladder = basic element of the architecture) High stability & high precision positioning Integration issues with the rest of the experiment These issues are addressed in:  The CAD design of the Si-tracker system for the LC  The development of the technique to build long ladders  The mechanical cooling studies  The development of alignement and mechanical calibration systems  The construction and tests (mechanical constraints) of mechanical prototype

 CAD design of the detector Long ladder: 6 sensors Long drawer: 5 long ladders Si-envelope LC-DET : SET Si-FCH SIT FTD Si-envelope includes all the elements of a all-Si tracker (SIT+FTD, SET, Si-FCH) Achieved by LPNHE-Paris a full CAD design for the large dimension barrel device Now Torino has joined Paris for collab on CAD Overall alveolar structure Feasibility test of the drawer structure at the Lab & acknowledged by Industry

Detailed CAD design of the end-caps (Si-FCH) is the present focus at LPNHE-Paris Detailed CAD design of the end-caps (Si-FCH) is the present focus at LPNHE-Paris The detailed CAD design of the Si-FCH in XUV is underway (also requested for G-based performance studies) Present stage of the CAD design Projective design XUV Design for end caps

 Developing technique to build long ladders= crucial basic element design, metrology, construction & industrialisation (Presently interested: Geneva, Paris, Torino, Vienna & Karlsruhe) Ex: Si-tracker of AMS (Geneva) But now it is required to go from homemade to industrialisation Going to a much more compact electronics on detector

The prototype is within a box maintained at desired T=35ºC (ex) G10 careenage (isolation), but allowing air circulation FE = resistors & thermocouple to measure the power dissipation on various points along the drawer Air cooling by wind turbine The 2.5 m long drawer made of 5 long ladders is cooled by:  Forced convection  Conduction (C-fiber with high λ)  Mechanical cooling studies (Paris)

Ta=30°C Aluminium ( =134 W/m.K) Results on mechanical cooling test bench: cooling at the end of the long drawer with air cooling and forced convection looks OK. Results from SAMCEF agree with those on the test bench. Very encouraging as cooling system is responsible for a Large % of material budget. with air 17 o C. Tests in progress with air 10 and 5 degrees C.

4.- Test benches & calibration systems Most of the European Institutes have very well equipped Large Labs and test bench facilities (CNM, Geneva, Helsinki, Karlsruhe, Pisa, Prague, Torino, Vienna), other are developing them (ex: Paris). Scheduled at the end of the 3 year SiLC program to have a test beam with a full prototype. Possibility to have meanwhile more focused test beams (Frascati and/or DESY or ???) under discussion. Calibration systems: Mechanical stability and high precision positioning impose monitoring/calibration systems to be studied and developed. Not yet started but several teams have a large experience and intend to apply it to the LC challenging case. Among them: Pisa, Roma1, Paris.

5.- Simulations studies (Fast and Geant-based) Work to be done or underway: Detailed pattern reconstruction GEANT-3&4 detailed simulation development Comparison of various detector set-ups & technologies including TPC Background studies[ including results of beam line simulation & related detector issues (forward) ] Calorimeter-assisted tracking (for SD) Physics studies to establish performance requirements MOKKA-geometry DB detector definition using detailed CAD mechanical design ttbar event display (SGV) (Obninsk, Paris & more to come)