August 7, 2013 Luke Lortie, EIT Jerry Auge, PE
Project Overview Project Layouts o Alley Way Access o Storm Sewer Treatment o Alternative Layouts o Right Turn Lane o Edgerton Street Intersection Right of Way Acquisition Process Project Schedule
Improve Safety ◦ Provide Designated Left Turn Lanes ◦ Upgrade Signal System ◦ Improve Pedestrian Facilities ◦ Increase Lane Widths
Maryland Avenue ADT:19,800 Payne Avenue ADT: 9,000 130 Crashes at the Inters. ( ) ◦ Average of 26 Crashes per Year ◦ 53% of Crashes Involve Left Turning Vehicles ◦ 25% of Crashes involve Sideswipe or Rear-Ends ◦ 22% Pedestrian, Right Turns
Top 50 Intersections Number of Accidents June 2007 – June 2012 Maryland & Payne #11
40 foot Roadway Width 4-Lanes 10 foot Lane Width No Left Turn Lanes 30 mph Speed Limit Split Phase West Bound 5 Alley Accesses to Maryland Avenue Sidewalks
44 Foot Roadway Width (55 Feet at Intersection) 4 Lanes 11 Foot Lane Width Left Turn Lanes on Maryland Avenue 30 mph Speed Limit Sidewalks
Current access to alleys poses a safety concern o Sight Distance Issues o Left turns into/out of alleys Possible ways to address alleys: o Install a median o Closure of alleys o Relocate alleys o Alley diverter o No “left turn” signage
Storm water treatment is a requirement of local Watershed Districts Options for treatment include: o Infiltration o Biofiltration o Ponding o Tree boxes
4-lane section with median 4-lane section without median o Removal of alleys to the roadway 4-lane section without median o Relocation of alley on South side – Mid block Signing alleys with no left turns Installation of a diverter on alleys
Acquisition of Yannarelly’s o Right turn lane east Maryland to south Payne Avenue Pros/Cons of Right Turn Lane: o Allows dedicated right turn lane o Decreased green light time for Maryland Ave. due to an Increase in pedestrian crossing time o Less safe for pedestrians
Right of Way Acquisition Southeast Quadrant – Future Edgerton Street Project
Consultants o Appraisers (3 Different Appraisers) o Right of Way Agents
Commercial Appraisal 1 Church Appraisal1 City Park Appraisal1 Residential Appraisals28 Total Number of Parcels31
Appraiser viewing of property Survey staking (July 15 th ) Appraiser o Sending out letters for viewing o Meeting with property owners
Right of Way Agents o Notify property owners via letters o Meet with property owners o Make Offers o Negotiations o Settling
Future of the Acquired properties Water Services Sewer services
Appraisals Preparation June –September 2013 Approve Layout July 2013 Written Offers September 2013 Purchase Agreements December 2013 Design Approval Dec 2013/Jan2014 Right of Way Cert. #1 March 2014 Advertise for Bids April 2014 Bid Awarding May 2014 Construction June – August 2014
For the most up-to-date project information and to receive project updates regularly throughout the duration of the project, visit the Ramsey County website at: Click on ‘Subscribe to Maryland and Paine Updates’ to receive future updates on the status of the project
July 10, 2013 Luke Lortie, EIT Jerry Auge, PE