August 7, 2013 Luke Lortie, EIT 651.266.7123 Jerry Auge, PE 651.266.7117.

Slides:



Advertisements
Similar presentations
Hot Springs Public Meeting Reconstruction of US 18 & US 385
Advertisements

LOR-U.S. 20 / S.R. 113 Center Ridge Rd. Widening Center Ridge Rd. at Avon Belden Rd. (S.R. 83)
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
6 th Street Water Main And Street Reconstruction 2013.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
West Contra Costa Unified School District
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
AIWW Deep Creek Bridge Replacement Information Update
Maryland Avenue and Westminster Street Jerry Auge, PE Project Manager Ramsey County Paul St. Martin Traffic Engineer City of St. Paul September 10, 2013.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County
Caltrans Approval Process: Update Van Ness Avenue BRT Citizens Advisory Committee September 8 th, 2009.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
In association with: THOMAS ROAD STREETSCAPE 73 RD STREET TO HAYDEN ROAD PROJECT NO. T0606 City of Scottsdale.
Access Management: Why And How? An Introduction To Access Management Problems, Principles and Treatments.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
INTERSECTION SAFETY PERFORMANCE AND AUDIT Andy Loonan Basak Aldemir-Bektas Intersection: Welch Avenue & Lincoln Way.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Crash Impediments Ordinance Update Orange County BCC September 1, 2015.
Project Update Colorado Esplanade Project.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Status Report Update Mike Miles Caltrans District 7 Director January 25, 2012.
S.R. 930 and Green Street Intersection Improvement Project Tuesday, May 22, :00 p.m. Presentation Park Hill Learning Center Auditorium New Haven,
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
U.S. 33 Road Reconstruction Goshen High School Auditorium 6 p.m. Wednesday, August 20, 2014.
STA Safety Project PID #76439 December 12, 2006.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Maryland at Edgerton Channelization  Maryland Avenue – Ramsey County Roadway  ADT 20,000 plus  Maryland/Edgerton Intersection in top 10 Citywide for.
Engineering Study Griffin View Drive & Harbor Hills Blvd. Prepared for Lake County Public Works Engineering 437 Ardice Avenue Eustis, Florida Purchase.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
October 15 th, 2013 The City of Akron SUM – Exchange Street / Cedar Street Corridor Safety Study.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
Visit Our Website at: Click to edit Master title style.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
2nd Street Drainage and Paving Improvements
Four Winds Condominium Association August 2, 2017
Project Status & Right-of-Way Acquisition
The Oakton Condominium Association September 12, 2017
IA 122 RECONSTRUCTION PRE-BID MEETING
PROJ. 566(17) LOR PID MAJOR WIDENING
Meadow Lake Boulevard Street Extension Project
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Harbour Island Force Main Replacement
Parks Highway Reconstruction: Lucas Road to Big Lake Road
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

August 7, 2013 Luke Lortie, EIT Jerry Auge, PE

 Project Overview  Project Layouts o Alley Way Access o Storm Sewer Treatment o Alternative Layouts o Right Turn Lane o Edgerton Street Intersection  Right of Way Acquisition Process  Project Schedule

 Improve Safety ◦ Provide Designated Left Turn Lanes ◦ Upgrade Signal System ◦ Improve Pedestrian Facilities ◦ Increase Lane Widths

 Maryland Avenue ADT:19,800  Payne Avenue ADT: 9,000  130 Crashes at the Inters. ( ) ◦ Average of 26 Crashes per Year ◦ 53% of Crashes Involve Left Turning Vehicles ◦ 25% of Crashes involve Sideswipe or Rear-Ends ◦ 22% Pedestrian, Right Turns

Top 50 Intersections Number of Accidents June 2007 – June 2012 Maryland & Payne #11

 40 foot Roadway Width  4-Lanes  10 foot Lane Width  No Left Turn Lanes  30 mph Speed Limit  Split Phase West Bound  5 Alley Accesses to Maryland Avenue  Sidewalks

 44 Foot Roadway Width (55 Feet at Intersection)  4 Lanes  11 Foot Lane Width  Left Turn Lanes on Maryland Avenue  30 mph Speed Limit  Sidewalks

 Current access to alleys poses a safety concern o Sight Distance Issues o Left turns into/out of alleys  Possible ways to address alleys: o Install a median o Closure of alleys o Relocate alleys o Alley diverter o No “left turn” signage

 Storm water treatment is a requirement of local Watershed Districts  Options for treatment include: o Infiltration o Biofiltration o Ponding o Tree boxes

 4-lane section with median  4-lane section without median o Removal of alleys to the roadway  4-lane section without median o Relocation of alley on South side – Mid block  Signing alleys with no left turns  Installation of a diverter on alleys

 Acquisition of Yannarelly’s o Right turn lane east Maryland to south Payne Avenue  Pros/Cons of Right Turn Lane: o Allows dedicated right turn lane o Decreased green light time for Maryland Ave. due to an Increase in pedestrian crossing time o Less safe for pedestrians

Right of Way Acquisition  Southeast Quadrant – Future Edgerton Street Project

 Consultants o Appraisers (3 Different Appraisers) o Right of Way Agents

Commercial Appraisal 1 Church Appraisal1 City Park Appraisal1 Residential Appraisals28 Total Number of Parcels31

 Appraiser viewing of property  Survey staking (July 15 th )  Appraiser o Sending out letters for viewing o Meeting with property owners

 Right of Way Agents o Notify property owners via letters o Meet with property owners o Make Offers o Negotiations o Settling

 Future of the Acquired properties  Water Services  Sewer services

Appraisals Preparation June –September 2013 Approve Layout July 2013 Written Offers September 2013 Purchase Agreements December 2013 Design Approval Dec 2013/Jan2014 Right of Way Cert. #1 March 2014 Advertise for Bids April 2014 Bid Awarding May 2014 Construction June – August 2014

 For the most up-to-date project information and to receive project updates regularly throughout the duration of the project, visit the Ramsey County website at: Click on ‘Subscribe to Maryland and Paine Updates’ to receive future updates on the status of the project

July 10, 2013 Luke Lortie, EIT Jerry Auge, PE