March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have.

Slides:



Advertisements
Similar presentations
Portland Bureau of Transportation Lent Elementary/Mill Park Elementary School.
Advertisements

Complete Street Analysis of a Road Diet Orange Grove Boulevard Pasadena, CA Aaron Elias Engineering Associate Kittelson & Associates Bill Cisco Senior.
Washington Street Redesign Andrew Brunn, Kamila Misiak, Sarah Thomas The Long Term Solution.
Haller Lake Community Club, March 6, 2014 Northgate Link Project: Transmission Line Relocation Update.
Walnut Creek Pedestrian Master Plan Summary of results of April–May 2014 online survey June 9, 2014 E ISEN |L ETUNIC.
PEDESTRIANS Osama Tabash Khaled El-Yazory Dr. Essam Almasri
VILLAGE OF NORTH SYRACUSE VILLAGE CENTER STREETSCAPE PLAN 2014 Prepared by: CHA Consulting Inc.
How to get from the Nebraska Parking lot to the Mary Graydon Center.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Kirby & Richmond. D C A B KIRBY 3 Lanes each way Center continuous turning lane Utilities Run along the West side Green space on the side between street.
Titusville to Edgewater Bike Loop PD&E Study
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
University of Connecticut-Stamford Campus Safety Orientation.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
July 23, 2013 Street by Street Committee. 2 Projects SW 48 th Ave & Garden Home 3900 block of NE 59 th Ave.
Examples of Context Sensitive Solutions in an Urban Environment ITD Project Development Conference April 7, 2005 Doug Camenisch, P.E. Parametrix.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Contact: Beth Morris
Chap 4 Cross Section Elements (pp.4-1 – 4-66 ) The following topics (pages) are covered in this lecture: Pavement (p.4-1 – 4-7) Pavement (p.4-1 – 4-7)
Slide 1. Slide 2 Introduction How did you get to school as a child?
How Walkable and Bike-able Is UCLA ? Multi-Modal Level Of Service Analysis in the UCLA Campus HYERAN LEE CLASS OF 2014 MASTER OF URBAN AND REGIONAL PLANNING.
Make CSUN Shine Brighter Vehicular and Pedestrian Flow Improvement Projects as of January 2014 Status Update – Active Projects Only.
Car Rider Safety To Avoid. Do not Double Park - you might hit someone. curb curb curb curb curb curb curb curb curb curb curb curb curb curb curb curb.
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
80 th and Foster Intersection Analysis Kevin Hace Chris Hass Matt Palmer CE 410/510: Bicycle and Pedestrian Engineering Design.
Transportation Tuesday TRANSPORTATION TUESDAY Stopping & Parking You should never park or stop your vehicle on busy traffic lanes or in no waiting and.
With Pictures.  Bus Bus Schedule CarBike BicycleTruck.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Project Update Colorado Esplanade Project.
Agreement with Town of Tioga, LLC. Total Cost Estimate: $6,420,000 Total Estimate for Agreement Portion: $3,700,000 Developer responsible for 9.7% of.
Outdoor Learning Area School Parking School Playground Existing Recreation. Facilities School Parking Neighborhood Tree Buffer Basketball Courts Abandoned.
Phillips Ave. Fire Station. The Fire Station: Phillips Ave. Fire Station RFP to be issued  Retain Historic Building  Allow Residential Use – Single.
23 rd Avenue Corridor Greenway Community Open House November 6, 2013.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
March 8, 2005 Commonly Used Bike Routes  Roughly half are located on arterials.  Topography makes east-west movement more difficult.  No marked bike.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
 Rice Street Traffic Study Proposal Presentation to the Saint Paul CIB Committee March 31, 2015.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
Complete Streets Training
39 th Ave NE Greenway – NPSF Curb Ramps Grant Andres Salomon.
Lompoc Walkability Assessment September 24, 2009.
A PRESENTATION BY THE DISTRICT 1 COMMUITY COUNCIL SIDEWALK TO BATTLE CREEK REC.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
HOW GOVERNMENT REGULATION CREATES SPRAWL: JACKSONVILLE AS A CASE STUDY.
University Drive Road Diet September 8, Goals and Objectives A. Reduce vehicular speed in the corridor. B. Provide an attractive bicycle accommodation.
Street design survey and data collection
Walk Audit Results Florida Consumer Action Network Foundation
APTA Sustainability Conference July 2016
District 3 Complete Streets Projects
Overview of Transportation in Greenwood
UL Stadium - Student Parking walk on S. Floyd St
Opportunity Lost, Again Opportunity to be Regained
Transportation Projects
Driving in City Traffic
APTA Sustainability Conference July 2016
Old Palm Avenue and 2nd Street
DDOT Western Avenue, NW Project
Fulton Transit The Fulton Street catchment area for the transit system comprises a remarkable seven stations of the subway and PATH. These are centered.
New Urbanism Concepts for Community Redevelopment Nicholas Zaferatos
Presentation transcript:

March 8, 2005 Pedestrian Connections  Some key arterial segments are missing sidewalks (Meridian, 1 st and 15 th Ave).  ¼ of the residential areas have sidewalks (south of NE 94 th St). NORTHGATE URBAN CENTER

March 8, 2005 Pedestrian Crossings  Street lighting levels vary.  Pedestrian feel exposed.  Short walk signal – 3 rd Avenue NE & Northgate Way (8 sec to cross Northgate).  Long wait time – 1 st Avenue NE & Northgate Way (70 sec wait to cross Northgate).  Some mid-block pedestrian refuges are needed at key locations. Roosevelt Way NE north of NE Northgate Way

March 8, 2005 Within Urban Center  Adequate lighting overall.  Sidewalks are continuous but width may not be adequate at some locations.  Roosevelt Way:  Sidewalks need repair  Street trees compete with pedestrian space  Northgate Way:  Many mid-block driveways  Access management NE Northgate Way near 5 th Avenue NE

March 8, 2005 Neighborhoods to Urban Center  Over 75% of arterials have sidewalks on both sides (benchmarks call for 90%).  Some sidewalk widths are not adequate.  Large trees obscure lighting but adequate overall. Roosevelt Way NE near NE 103 rd Street

March 8, 2005 Within Residential Neighborhoods  North of NE 92 nd sidewalks are lacking.  Vehicles and pedestrians compete for shoulder/ parking lane.  Several missing gaps along arterials.  15 th Ave NE  Meridian Ave N  1 st Ave N/NE  Corliss Ave N  Densmore Ave N 1 st Avenue N near Northgate Elementary