Presentation is loading. Please wait.

Presentation is loading. Please wait.

Make CSUN Shine Brighter Vehicular and Pedestrian Flow Improvement Projects as of January 2014 Status Update – Active Projects Only.

Similar presentations


Presentation on theme: "Make CSUN Shine Brighter Vehicular and Pedestrian Flow Improvement Projects as of January 2014 Status Update – Active Projects Only."— Presentation transcript:

1 Make CSUN Shine Brighter Vehicular and Pedestrian Flow Improvement Projects as of January 2014 Status Update – Active Projects Only

2 Plummer St. Sidewalk, Darby to Etiwanda Ave. The existing sidewalk along the south side of Plummer is an aging asphalt walk with significant cracking and buckling. This project will construct a new ADA compliant walkway leading into the campus core, along with lighting and landscape improvements. Status: Currently in design, with construction scheduled for summer 2014.

3 Lindley Ave Pilot Closure Project In response to safety and pedestrian safety concerns from the survey, in Fall 2013 Lindley Ave. (from the F2 Parking Lot to Vincennes Avenue) was closed to non-essential traffic (Monday-Friday). The closure of Lindley Avenue facilitates safer and free flowing pedestrian street crossings along Lindley Ave through the center, or core, of the campus. While this project was not specifically named as project, the closure has been extremely successful and continues into the Spring Semester 2014.


Download ppt "Make CSUN Shine Brighter Vehicular and Pedestrian Flow Improvement Projects as of January 2014 Status Update – Active Projects Only."

Similar presentations


Ads by Google