Marc Baumgartner 24.10.2014. 1983 FANS Committee EATCHIP 1996 Free Route ATM 2000+ Global concept 2005 1999 WTT 2002.

Slides:



Advertisements
Similar presentations
Unmanned Aircraft Systems EUROCONTROL ATM Integration
Advertisements

Single European Sky Conference, Limassol Lufthansa German Airlines October 11, 2012 Page 0 Single European Sky and Performance Scheme from an European.
Safety and Security in Air Traffic Management Rod Graff Agenda Item 2.
BULATSA 40 Years of Safety in Bulgarias Skies Sofia, 27 February 2009, CNATCC.
Performance Review Commission, and performance management of the European ATM system Keith C. Williams, Chairman PRC.
The Single European Sky ATM Research (SESAR) initiative
Marc Deboeck ADQ Implementation Workshop 29 May 2013 Directorate Single Sky (SES) Support to CAA-NSA Single Sky Implementation Support to NSAs.
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Single European Sky 1 CAeM Technical Conference Single European Sky and the Impacts for Aeronautical Met Services Geneva 21 November 2006.
SESAR TEN-T day. Content ●SESAR investments and timing ●Network effect ●Validation and certification activities ●Conclusion.
Information Management The ICAO Perspective
F. Schubert / page 1 Functional Airspace Blocks - Can they inspire the ANS World? Air Transport, Air & Space Law and Regulation International.
SES ll and SESAR -Presentation to BBGA Annual Conference Brian Humphries CBE President EBAA 12 Mar 2013.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
Safety Oversight System in India
International Civil Aviation Organization Block Upgrades Next Steps & AN-Conf/12 Alexander Korsakov Air Navigation Commissioner International Civil Aviation.
The European Organisation for the Safety of Air Navigation Ian Middleton, Deputy Director EUROCONTROL - Directorate Single Sky Amsterdam, 27 April 2012.
SINGLE EUROPEAN SKY ACAC Tripoli 3-4 November 2008.
Regional Cooperation Activity JOINT MEETING OF THE ADVISORY COMMITTEE AND THE EXECUTIVE BOARD Nicosia 17 Jan 2014.
5th INTERNATIONAL CONFERENCE Nicosia May 2014 Safety performance measurement in Air Navigation Services.
SESAR Single European Sky Air traffic management Research
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
Enav.it Channelling Finance and Innovation to Industry Steps towards the Air Traffic Management system modernisation.
Frank Brenner Director General, EUROCONTROL European ATM Israel Civil Aviation Conference, 18th November 2013.
ATM Conference, Oslo May 19 th, 2015 ATM Master Plan 2015 Consequences for cost, safety, performance and environment.
Regional ATFM in Europe
David Bowen Head of ATM Operations and Systems
Can our ATM systems cope?
24-25 June 2010 SWIM-SUIT Final User Forum, Rome SWIM-SUIT Final User Forum.
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
Cost effective ATM – from the perspective of airspace users Torbjørn Lothe, ATM Conference 19 May 2015.
State Aviation Administration The State Aviation Administration of the Ministry of Transport and Communications of Ukraine ICAO EUR Regional Preparatory.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
AVINOR FLYSIKRING AS AVINOR AIR NAVIGATION SERVICES INVESTMENTS AND FINANCING FOR AVINOR DEPLOYMENT PER INGAR SKAAR.
Victor Kourenkov ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 LEGISLATION AND ORGANISATION CONSIDERATIONS.
Visit of Mr Griffiths, DG CAA UK - 20 December 2007 EUROCONTROL.
Ensuring the Safety of Future Developments
Air Traffic Management activities in ETSI Jørgen Friis Deputy Director-General DOCUMENT #:GSC13-GRSC6-23 FOR:Presentation SOURCE:Jørgen Friis AGENDA ITEM:4.5.
Letové prevádzkové služby Slovenskej republiky, štátny podnikwww.lps.sk INAIR 2015 Amsterdam 13th November, 2015 Miroslav Bartoš CEO, LPS SR, š. p. Chairman,
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
MAK – EUROCONTROL WORKSHOP Moscow 1 -2 July 2004 Kenneth Eideberg Stakeholder Implementation Service EUROCONTROL European Organisation for the Safety of.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision OVERVIEW OF THE SINGLE EUROPEAN SKY Roderick.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 14 – Air Transport Bilateral screening:
Petros Stratis – BLUE MED Project representative – DCA Cyprus Co-financed by the EU (TEN-T)
Module 02 Essential Requirements for ATCOs. Training Objectives  Appreciate the content of the essential requirements for ATCOs as described within EASA.
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
IFATSEA General Assembly Keynote address Berlin, Germany November 2015
Safety Performance Review
Co-operating with the European Aviation safety Agency
SIP/2012/ASBU/Nairobi-WP/7
Eighth UK European ATM Stakeholders Forum 24th April 2006
Agenda Item 1 A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART I
ANConf/12 – Agenda H. Sudarshan
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
IFATSEA General Assembly
London 14 October 2015 Freek De Witte Head of Stakeholder Relations
PROGRESS & CHALLENGES ATCOS’ VIEWS
The Single European Sky Implementation Programme: SESAME
Aviation Innovation for Regional Integration
ANConf/12 – Agenda H. Sudarshan
International Federation of Air Traffic Safety Electronics Associations IFATSEA European Regional Meeting 2016 Update ICB by Robert Schneebauer 17.
Presentation transcript:

Marc Baumgartner

1983 FANS Committee EATCHIP 1996 Free Route ATM Global concept WTT 2002

1983 FANS Committee EATCHIP 1996 Free Route ATM Global concept ASBU WTT 2002

12th Air Navigation Conference7 Aviation System Block Upgrades

The whole ATM system will be performance based, and changes based on performance cases (which includes safety cases and business cases) A high level of automation will be required in meeting the highest ATM performance requirements Air Traffic Control (reactive, tactical) will be replaced by Air Traffic Management (proactive, strategic) Management by trajectories will form the basis of all the controllers activities Airspace will be dynamic (move around) UAV in non-segregated airspace Less controllers needed. Local / Regional Implementation Airports will be controlled from remote facilities Completely automated systems Service provision will be decoupled from infrastructure management High predictability in extended TMA (Metroplex) versus freedom of movement in the rest of the airspace Cyber security will be integral part of the design of the future infrastructure New financial models will be the norm

New Aerodrome Tower concepts An example: Remote tower operations

DeploymentDevelopment Strength Weakness – 8 years of involvement of IFATCA in SESAR Involved Outdated technology Too many work packages Volunteers One R&D programme ACAS XACAS X SafetySafety DLS EMPLOYEES PCP

22 Attribute 1 European ambition Attribute 2 Bring forward the ambition Attribute 3 Level playing field Attribute 4 A stepping stone legal framework 1999 start of SES process COM (1999) 614 -Functional separation -FAB -Comitology -Change the role of NSA -Create SESAR, EASA -Etc SES I regulatory package 2009 SES II regulatory package 2013: SES II+ ?

Liberalisation of Aviation 1998 Establishment Performance Review Commission 1997 Revised Convention 1999 start of SES process COM (1999) SES I regulatory package 2009 SES II regulatory package 2013: SES II+ ? 1960 Creation of Eurocontrol 1995 Establishment of CFMU EU EU EU EU Creation of SESAR (2007) Creation of EASA (2008) Designation of PRC – PRB (2010) Designation Network Mgt 2011 Creation NM Board 2011 EC accession 2008 Centralisesd services EC High Level Agreement 2012 Deployment manager

5-13 new institutional actors 24 EU EU EU EU Establishment of NSA, functional seperation, ownership Infringement procedures

25

- Small airports - Big airports, regrouping smaller airports in vicinity and the airspace needed to provide an efficient service (like an air craft carrier group – or a Metroplex area) - Regional or flow driven “en-route” centres - One European oceanic centre - One Network Manager

European Institutions Several European Institution with real technical expertise and sufficient resources with “policing” rights will assume the following functions: - Regulation, certification and supervision in matter of safety of: o The ATM service providers o The airspace users (all categories) o The service providers o The technical systems - The development of technological standards (European RTCA) - The delegation of operational services - The negotiations and establishment of the technical service provision - The management of the European network (NM) And - Accident and incident investigation - Management of European research

28