CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.

Slides:



Advertisements
Similar presentations
East Hampton High School July 2013 – July 2014 Design Phases.
Advertisements

General Infrastructures Services Department LIU-SPS external beam dump - Internal Review Civil Engineering Aspect for Option B (LSS4) 30/7/2014 Martin.
L.A. Lopez Hernandez Route Goward and Septum 16 shielding increase LS1 Committee - 21 st - 20 September 2013.
Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
Plasma Wakefield (AWAKE) Project Meeting 18 October 2012 Civil Engineering Feasibility Issues for the West Area EDMS : John Osborne GS-SE.
Industry information day INDUSTRY INFORMATION DAY Assembly & Installation Laurent Schmieder Buildings Infrastructure and Power Supplies Project.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
1 FUTURE EXPLOITATION OF THE EAST AREA Infrastructure and Equipment - Civil Engineering issues. Jonathan Carr – GS / SE.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
John Osborne GS/SE March 2013
Process Protocol Demonstrator Implementation of the Process Protocol at the Britannia Walk Development Stuart Carmichael Process Network 7 March 2002.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Construction Drawing Occupational Safety and Fundamentals
CENF target facility civil engineering specifications – summary M. Calviani (EN/STI) for the CENF-SBWG team Neutrino Platform Meeting 30 th October 2014.
19 February Summary: Updating on the activities completed (Done) since the last meeting List activities on going (Next steps) and related Actions.
128 May 2013 CENF Near Far Integration For the Safety Folder + Environmental impact Study Simple process: Identify Safety issues >> description >> risk.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
09 July EHN1 civil engineering project status (JUNE) Summary: Updating of the activities carried out on-site (Done) in JUNE List activities on going.
06 August EHN1 civil engineering project status (JULY) Summary: Updating of the activities carried out on-site (Done) in JULY List activities on.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Status of Radiation Protection studies in support of ELENA R. Froeschl and J. Vollaire DGS-RP-AS.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
22 October Summary: Updating of the activities carried out on-site (Done) in SEPTEMBER List activities on going (Next steps) and scheduled for OCTOBER.
15 January Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
CENF CIVIL ENGINEERING : - DESIGN TENDER AND ESTIMATED COSTS John Osborne GS/SE 19 July 2013.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
General Infrastructures Services Department Civil Engineering planning for LSS4 Option, presented at review workshop 30/7/ months Planning and Resources:
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES - 3D VISUALS FOR SURFACE STRUCTURES.
CENF CIVIL ENGINEERING UPDATE : - SITE INVESTIGATION - CALL FOR TENDER FOR DESIGN & CONTRACT ADMINISTRATION SERVICES John Osborne GS/SE 16 May 2013.
HiRadMat : Coordination meeting 02 October S. Evrard 1 News from project team General information : access,... PR532 repair : plans Existing services.
19 February Extension of Building Neutrino Platform General Meetings N.Lopez – M.Manfredi EHN1 civil engineering project status Summary: Updating.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
WP 17.1 Civil Engineering Platform height / vs option Status on M. Manfredi on behalf of WP17.1 team.
INFORMATION ABOUT ASBESTOS EDMS No General, 2.Materials, 3.Risks, 4.Effects on health, 5.Prevention at CERN, 6.Work management, 7.Your role as.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
21 January Summary: Updating of the activities carried out on-site (Done) in DEC + ½JAN List activities on going (Next steps) and scheduled till.
10 December Summary: Updating of the activities carried out on-site (Done) in NOVEMBER List activities on going (Next steps) and scheduled for DECEMBER.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
WP 17.1 Civil Engineering Point 1 - Networks LS2 COMMITTEE – CERN – Pieter Mattelaer (SMB-DI)
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
25 June EHN1 civil engineering project status (MAY) Summary: Updating of the activities carried out on-site (Done) in MAY List activities on going.
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
SuperB Experimental hall General considerations on the Babar experimental area Preliminary space requirements hall proposal. A floor plan. Specification.
Session 1: Identifying Construction Drawings and Drawing Components.
EHN1 Cryogenics Integration
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
Safety in the Neutrino Platform Hall
IT-4337/SMB – Bidders Conference
Equipment simplified model SMR UR safety
Safety Documentation EHN1
CERN Neutrino Project 26th November, 2013 M.Nessi.
CE Status: Activities executed until 03/08 and ongoing
RIBA Plan of Work 2013.
EHN1: CE Integration process updating
Special LS1 day on 12 June 2012, EDMS:
EHN1 Neutrino Installation Plans
East Hall under construction
INFORMATION ABOUT ASBESTOS
RDR Baseline Layouts for Interaction Region
RIBA Plan of Work 2013.
LINAC 3 Meeting ICL machines Injectors
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension #1 Coordination Meeting N.Lopez, M.Manfredi (GS-SE) 13 November

CENF – Civil Engineering Extension B887 CE Design Phases & Work Supervision: Tender Design phase  completed in July-2014 Construction Design phase  started in Sept months Construction Supervision phase  foreseen in Jan months EHN1 Extension #1 Coordination Meeting N.Lopez, M.Manfredi (GS-SE) 13 November GS-SE Main activities ongoing : Preparation Works study started in Oct-2014 (trees removal, networks deviation study, etc..)  involves other CERN group.. Execution Drawings (Ref. EDMS: ) and CE Calculation Notes (Ref. EDMS: ) received  A first EDMS Approval procedure launched. As agreed Ilias has been notified as person in charge for the integration coordination.. Analysis of the Technical Documents submitted by the awarded firms (GC&CM works) after the Tender phase  GS-SE internal evaluation..

Extension Site Installation Area Tunnel TDC85 Experimental Hall B.887 (EHN1) Technical Aspect: Location CENF – Civil Engineering Extension B887 The EHN1 is a large industrial building situated on french territory, in Prévessin. The building has to be extended for the new generation of experiments on the neutrinos. The Extension will extend northwards from the building for about 70 m in the direction of the beams. EHN1 Extension #1 Coordination Meeting N.Lopez, M.Manfredi (GS-SE) 13 November

CENF – Civil Engineering Extension B887 Technical Aspect: General info The Extension's dimensions are 72 m long by 50 m wide and 20 m high. The Extension includes two large pits of 7.35m and 9.0m deep. The top metallic structure is similar to the existing building, allowing for an easy continuation of the overhead crane and services. The technical gallery will be prolonged. Swallow service trenches will provide the access from the sidewalls to the pits Extension PIT A: 7.35m deep PIT B: 9.0m deep EHN1 Extension #1 Coordination Meeting N.Lopez, M.Manfredi (GS-SE) 13 November External concrete slabs for Cryo and electrical equipment.

Section A-A A A B B The works to be carried out will include: Construction sheet piles Construction diaphragm wall and final tie beams Construction of reinforced concrete structure (raft foundations, slabs, walls, etc.) Demolition of the existing gable retaining wall Technical Aspect: Civil Engineering main activities (1/2) CENF – Civil Engineering Extension B887 EHN1 Extension #1 Coordination Meeting N.Lopez, M.Manfredi (GS-SE) 13 November Section B-B Plan view

General worksite installation Rerouting and cutting existing underground networks Mass and ditch earthworks Drawdown of the water table Road works, car parks and landscaping. Rainwater treatment structures (worksite and definitive) Notes: Particular attention should be kept to the extracted cut material within 5.50m of distance from the TDC85 Radiological Protection: People allow to enter the technical gallery or inside the existing building 887 should equipped (passive/operational dosimeter) and accredited by CERN. No special measure need to be planned to work outside Technical Aspect: Civil Engineering main activities (2/2) CENF – Civil Engineering Extension B887 EHN1 Extension #1 Coordination Meeting N.Lopez, M.Manfredi (GS-SE) 13 November

Structural steelwork and associated components (Main and Secondary structures, Internal structures, Travelling crane structures) Metalwork: guardrails, stairs, ladders, doors Removal of the north gable of the existing building (not before the extension is water- tight and air-tight) CENF – Civil Engineering Extension B887 Technical Aspect: Structural steel main activities (1/2) EHN1 Extension #1 Coordination Meeting N.Lopez, M.Manfredi (GS-SE) 13 November

façade roofing doors glazed windows ladders with safety cages safety barriers rainwater pipes cryogenics roof etc. CENF – Civil Engineering Extension B887 Technical Aspect: Structural steel main activities (2/2) EHN1 Extension #1 Coordination Meeting N.Lopez, M.Manfredi (GS-SE) 13 November

CENF – Civil Engineering Extension B887 Schedule: Start date (T0): CERN Work order + 15 days Completion date: T months Key dates: T months: WP1: Civil engineering structure completed WP2: Access for WP2 contractor to work area T months: WP2: Structural Steel work completed WP1: Access for WP1 contractor to work area T0 + 7 months: WP2: Supply of all metal inserts in the concrete T0 + 4 months: WP2: Provision of WP2 detailed design EHN1 Extension #1 Coordination Meeting N.Lopez, M.Manfredi (GS-SE) 13 November

EL -EL: Worksite Power Supply Earthing Design and Installation for the EHN1 extension and coordination during construction works CV -CV: Firefighting network work (North Area) Potable Water for the worksite (from EHN1) Drainage water network from ECN3-TCC8 to be repaired GS-SE -GS-SE: Trees felling + B.918 storage RP -RP: Monitoring System removal TSO TT85 -TSO TT85: Access condition for the TT85 visit 72m 50m Extension Area IT -IT: Internet connection -Before the start of the works (now  Dic-2014) CENF – Civil Engineering Extension B887 EHN1 Extension #1 Coordination Meeting N.Lopez, M.Manfredi (GS-SE) 13 November

CENF – Civil Engineering Extension B887 -At the beginning of the works (Jan-2015), RP -RP: Monitoring System removal IT -IT: Internet connection GS-SE -GS-SE: Trees felling + B.918 storage TSO TT85 -TSO TT85: Access condition for the TT85 visit EHN1 Extension #1 Coordination Meeting N.Lopez, M.Manfredi (GS-SE) 13 November CV -CV: Firefighting network work (North Area) Potable Water for the worksite (from EHN1) Drainage water network from ECN3-TCC8 to be repaired (Worksite Area layout) EL -EL: Worksite Power Supply Earthing Design and Installation for the EHN1 extension and coordination during construction works

CENF – Civil Engineering Extension B887 -During the works (beginning-2015), CV -CV: Firefighting network work (North Area) Potable Water for the worksite (hydrant?) Temporary drainage water (ECN3-TCC8) deviation RP -RP: Monitoring System removal TSO TT85 -TSO TT85: Access condition for the TT85 visit IT -IT: Internet connection GS-SE -GS-SE: Trees felling + B.918 storage Drawing reference: EP see also: EP , for the General Plan View (Existing EHN1 earthing layout) EHN1 Extension #1 Coordination Meeting N.Lopez, M.Manfredi (GS-SE) 13 November EL -EL: Worksite Power Supply Earthing Design and Installation for the EHN1 extension and coordination during construction works

-During the works (end-2015), CENF – Civil Engineering Extension B887 (Existing services & platforms removal on the North gable  all groups involves) EHN1 Extension #1 Coordination Meeting N.Lopez, M.Manfredi (GS-SE) 13 November

EHN1 Extension #1 Coordination Meeting N.Lopez, M.Manfredi (GS-SE) 13 November CENF – Civil Engineering Extension B887 Thanks for your attention.. Questions?