2012 Citilabs Asia User Conference

Slides:



Advertisements
Similar presentations
THURSTON REGION MULTIMODAL TRAVEL DEMAND FORECASTING MODEL IMPLEMENTATION IN EMME/2 - Presentation at the 15th International EMME/2 Users Group Conference.
Advertisements

Overview Examples of TranSight Applications What Does TranSight Analyze? Model Structure.
Iran Network and Transit Modeling and Forecasting Using EMME/2 Mahboobeh Zakeri Sohi ENTRAConsultants 21st International EMME Users Conference October,
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
TRAVEL DEMAND FORECASTING FOR THE OLYMPIC GAMES ATHENS 2004 ATTIKO METRO S.A. Anna Anastasaki.
SCATTER final seminar, Brussels, 9 November 2004 SCATTER Testing and evaluating potential solutions to control urban sprawl, through simulation.
Jeannie Wu, Planner Sep  Background  Model Review  Model Function  Model Structure  Transportation System  Model Interface  Model Output.
GREATER NEW YORK A GREENER Travel Demand Modeling for analysis of Congestion Mitigation policies October 24, 2007.
The Current State and Future of the Regional Multi-Modal Travel Demand Forecasting Model.
The SoCoMMS Model Paul Read Dan Jones. The Presentation Outline of the Study The Modelling Framework Accessibility Model.
What is the Model??? A Primer on Transportation Demand Forecasting Models Shawn Turner Theo Petritsch Keith Lovan Lisa Aultman-Hall.
Status of the SEMCOG E6 Travel Model SEMCOG TMIP Peer Review Panel Meeting December 12, 2011 presented by Liyang Feng, SEMCOG Thomas Rossi, Cambridge Systematics.
SCAG Region Heavy Duty Truck Model Southern California Region Heavy Duty Truck Model.
Intercity Person, Passenger Car and Truck Travel Patterns Daily Highway Volumes on State Highways and Interstates Ability to Evaluate Major Changes in.
GEOG 111 & 211A Transportation Planning Traffic Assignment.
Transportation Data Palooza Washington, DC May 9, 2013 Steve Mortensen Federal Transit Administration Data for Integrated Corridor Management (ICM) Analysis,
Junction Modelling in a Strategic Transport Model Wee Liang Lim Henry Le Land Transport Authority, Singapore.
Session 11: Model Calibration, Validation, and Reasonableness Checks
CE 2710 Transportation Engineering
Agenda Overview Why TransCAD Challenges/tips Initiatives Applications.
Planning Process ► Early Transport Planning  Engineering-oriented  1944, First “ O-D ” study  Computational advances helped launch new era in planning.
Regional Travel Modeling Unit 6: Aggregate Modeling.
Title: Energy Saving & Carbon Reduction in Transportation Sector in Chinese Taipei Name: Organisation: Institute of Transportation, MOTC Economy: Chinese.
THE PLANET99 MODEL DEMAND AND REVENUE FORECASTING TOOL FOR RAIL OPERATORS 8th EUROPEAN EMME/2 USERS CONFERENCE Jeremy Douch GIBB Transport Planning May.
SCATTER-SELMA joint workshop, Brussels, 8 June 2004 Testing potential solutions to control urban sprawl The Brussels case city.
May 2009 Evaluation of Time-of- Day Fare Changes for Washington State Ferries Prepared for: TRB Transportation Planning Applications Conference.
An Experimental Procedure for Mid Block-Based Traffic Assignment on Sub-area with Detailed Road Network Tao Ye M.A.Sc Candidate University of Toronto MCRI.
BETTER AIR QUALITY 2004 SPECIFIC TRANSPORT MEASURES TO REDUCE EMISSIONS IN HYDERABAD, INDIA Yash Sachdeva, RITES Ltd Viresh Goel, RITES Ltd D.S.Chari,
A Brief Comparison on Traffic System Between London and Shanghai Allen Liu, Shanghai Feb. 16 th 2012.
1 Using Transit Market Analysis Tools to Evaluate Transit Service Improvements for a Regional Transportation Plan TRB Transportation Applications May 20,
Implementing a Blended Model System to Forecast Transportation and Land Use Changes at Bob Hope Airport 15 th TRB National Transportation Planning Applications.
Timo Elolähde 1 Traffic Model System and Emission Calculations of the Helsinki Metropolitan Area Council.
Source: NHI course on Travel Demand Forecasting (152054A) Session 10 Traffic (Trip) Assignment Trip Generation Trip Distribution Transit Estimation & Mode.
Travel Demand Modeling At NCTCOG Presentation For IOWA TMIP Peer Review March 30 – April 1, 2004.
15 th TRB Transportation Planning Applications Conference Tuesday, May 19 th, 2015 – Atlantic City, NJ Integrating Travel Demand Models & SHRP2 C11 Tools:
Seoul Development Institute Building a TDM Impact Analysis System for the Introduction of a Short-Term Congestion Management Program in Seoul Jin-Ki Eom,
Seminar 23rd November 2001 Other Policies: Demand Management & Highway Investment Professor Marcial Echenique.
鼎漢國際工程顧問股份有限公司 THI Consultants Inc. The Taiwan Intercity Transportation Demand Model Version 2012 Derek Jenq, Planner THI Consultants Inc. Sep. 5, 2012.
Calculating Transportation System User Benefits: Interface Challenges between EMME/2 and Summit Principle Author: Jennifer John Senior Transportation Planner.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Modelling of Trips using Strategic Park-and-Ride Site at Longbridge Railway Station Seattle, USA, Oct th International EMME/2 Users Conference.
Multimodal Corridor System Management – Incorporating Analysis of Transit, Demand Management Programs and Operational Strategies Presented by Bill Loudon,
Green Transport Dr Lina Shbeeb Minister of Transport. Jordan.
Computers in Urban Planning Computational aids – implementation of mathematical models, statistical analyses Data handling & intelligent maps – GIS (Geographic.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 16, 2009.
Is Transit Part of the Equation? Is Transit Part of the Equation? Travel Data Users Forum: How Will the Changing Cost of Energy Affect Personal Travel?
Technical Session 4 – Model Development & Calibration 4.1 Calibration of the TRANS Model for the National Capital Region (Ottawa-Hull) Don Stephens P.
Transportation Planning, Transportation Demand Analysis Land Use-Transportation Interaction Transportation Planning Framework Transportation Demand Analysis.
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
Cal y Mayor y Asociados, S.C. Atizapan – El Rosario Light Rail Transit Demand Study October th International EMME/2 UGM.
Major Transportation Corridor Studies Using an EMME/2 Travel Demand Forecasting Model: The Trans-Lake Washington Study Carlos Espindola, Youssef Dehghani.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
Integrated Travel Demand Model Challenges and Successes Tim Padgett, P.E., Kimley-Horn Scott Thomson, P.E., KYTC Saleem Salameh, Ph.D., P.E., KYOVA IPC.
Transportation leadership you can trust. presented to Safety Data Analysis Tools Workshop presented by Krista Jeannotte Cambridge Systematics, Inc. March.
How Does Your Model Measure Up Presented at TRB National Transportation Planning Applications Conference by Phil Shapiro Frank Spielberg VHB May, 2007.
Presented to Time of Day Subcommittee May 9, 2011 Time of Day Modeling in FSUTMS.
an Iowa State University center SIMPCO Traffic Modeling Workshop Presented by: Iowa Department of Transportation and Center for Transportation Research.
1/14 Next Steps for Participating Economies to Develop EE Urban Passenger Transportation 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
Impact of Aging Population on Regional Travel Patterns: The San Diego Experience 14th TRB National Transportation Planning Applications Conference, Columbus.
Application of Statistics on Cross-boundary Transport Planning in Hong Kong Sorais Lee, Planning Department, Hong Kong IAOS/SCORUS Conference Shanghai.
Travel Demand Forecasting: Traffic Assignment CE331 Transportation Engineering.
By Alain L. Kornhauser, PhD Professor, Operations Research & Financial Engineering Director, Program in Transportation Faculty Chair, PAVE (Princeton Autonomous.
CHALLENGES OF URBAN GROWTH November 6, 2009 Jose A. Gomez-Ibanez OUTLINE: 1.CITIES AND ECONOMIC GROWTH 2.HCMC PROBLEMS  GROWTH, CONGESTION, FLOODING,
Transportation Modeling – Opening the Black Box. Agenda 6:00 - 6:05Welcome by Brant Liebmann 6:05 - 6:10 Introductory Context by Mayor Will Toor and Tracy.
Quantify Uncertainty in Travel Forecasts
Metro Railway How it began
Modelling Sustainable Urban Transport
Travel Demand Forecasting: Mode Choice
Ventura County Traffic Model (VCTM) VCTC Update
Presentation transcript:

2012 Citilabs Asia User Conference The Transportation Demand Forecasting Model of Taichung Rapid Transit System (TCModel 2011) Teresa Chang, Planner Sept. 5, 2012

Presentation Outline Background of the Study Area What Do We Want to Know? Why Do We Update? How Do We Update? Introduction of TCModel 2011

Background— Study Area Changhua Taichung Nantou Taichung(29) Changhua(19) Nantou(2) Study Area – Taichung Urban Countys: Taichung, Changhua, Nantou Towns: 50 Area: 3,062.3 KM2 Population: 3.95million people

Background -Railway Master Plan Operations Taiwan Rail(gray) Taiwan High Speed Rail (yellow) Taichung Changhua Nantou Construction TR-Red Line (the project completion year is 2015) MRT-Green Line completion year is 2017) Planning MRT-Blue Line MRT-Orange Line

Background -Orange Line Taichung Changhua Nantou Taichung Airport Downtown $ Depot OA4 OA3 OA2 OA1 O1 O2 O3 O4/G7 O9/B9 O5 O6 O7 O8 O14 O16 O17 O15 O13 O12 O11 O10 MRT — Orange Line From OA4 To O17 Length,km (elevated) 14.7 Length,km (underground) 14.8 Total Length,km 29.5 Stations (elevated, ) 8 Stations (underground, ) 13 Total number of stations 21 MRT System MCT Depot 1 Transfer Stations ( , ) 2

What Do We Want to Know? When the future wil build Orange Line , …… 1 Percent of Private Trips to Total 2 Orange Line Boarding (passengers/day) and Revenue 3 Traffic Impact of the Surrounding Area 4 Travel Time Savings (reduced travel time and new trips) 5 Vehicle Operating Cost Savings (fuel and non-fuel operating cost reductions) 6 Accident Cost Savings (safety benefits) 7 Emission Reductions (CO, NOx PM10) 8 Evaluating the Effectiveness of Policies

Why Do We Update? Development of TC Model 1994 1998 2003 2009 Tranplan+ Transport Base Year: 1988 Future Year: 2020 TAZs: 138(132+6)zones Household Travel Survey: 1990 (Samples: 12,000) Base Year: 1994 Future Year: 2021 TAZs: 257 (253+4)zones Household Travel Survey: 1995 (Samples: 1,700) TransCAD Base Year: 2001 Future Year: 2031 TAZs : 257(253+4)zones Household Travel Survey: No Base Year: 2007 TAZs: 257(253+4)zones The Household Travel Survey has been not conducted since 1995. TransCAD using dialog boxes to input which can’t take down all steps. Final model only has OD matries and the highway network. These data are out-of-date, incomplete or inaccurate.

TCModel 2011 How Do We Update ? TCModel 1994 Update Major updates Better data and good tools can effectively improve model accuracy ! Better Data Good Tools Update screen line survey and cordon line survey Select a new modeling platform (CUBE) Update travel behavior survey TCModel 1994 Update Check and adjust trip generation rates Reconstruct the highway network and transit network Update and forecast the demographic data Check and update the Traffic Analysis Zones

How Do We Update ? – Model Methodology Outline Model Structure: Sequential 4-step model Traffic Assignment HW: Multi-Modal Equilibrium Assignment Model PT: Best-Path Mode Split Travel Behavior Survey: Stated Preference Multinomial Logit Model(MNL) Trip Distribution Gravity Model Impedance Function: Gamma Function Trip Generation Production: Cross-classification Attraction: Multiple Regression Module Approaches

Introduction of TCModel 2011 –Model Structure 4-step Travel Demand Modeling Procedure Trip Generation Trip Distribution Traffic Assignment Mode Split

Introduction of TCModel 2011 –Model Characteristics Traffic Analysis Zones Internal: 320 zones External: 7 zones Reserve: 16 zones Total number of zones: 343 zones Network Total number of links: 42,681 links Transit Lines: 335 lines Analytical Modes Car Motor Bus Taiwan Rail MRT Analytical Period Weekday 24hrs Peak hour

Introduction of TCModel 2011 –Scenario Management Interface This provides a convenient interface for defining scenarios, editing and running the scenarios. Planning Year: 2021(Y110), 2031(Y120) , 2041(Y130) Scenarios: Land Use Policies: Without TOD , With TOD Traffic Policies: Bus headway, Oil prices, Parking fare

Introduction of TCModel 2011 –Applications of Model Outputs Boarding Passengers Passengers Per Hour in Peak Direction(PPHPD or p/h/d) Passenger Kilometers Traveled (PKMT) Passenger Hours Traveled (PHT) Vehicle Kilometers Traveled (VKMT) Vehicle Hours Traveled (VHT) Average Speeds Volume to Capacity (V/C) Ratios Model Outputs Station Design Train Operation Plan Economic Benefit-Cost Analysis Financial Viability Analysis Policy Analysis Traffic Impact Analysis Sreen Line Analysis Applications of Model Outputs

The end Thank you! E-mail : teresa@thi.com.tw Taipei . Taichung . Kaohsiung . Shanghai . Hong Kong . Macau