1 Travel Demand Forecasting: Traffic Assignment CE331 Transportation Engineering

2 Land Use and Socio- economic Projections Trip Generation Trip Distribution Modal Split Traffic Assignment Transportation System Specifications Direct User Impacts Overall Procedure

3 Traffic Assignment What route to choose? Mostly for auto mode Intermodal network Input OD matrix by mode Roadway network (for auto) and/or transit network Characteristics (travel time, cost, …) of each route connecting an OD pair Output Vehicular flow on each link of the network

4 Assignment Techniques Basic Assumption Travelers always choose the least cost route connecting the OD All or nothing assignment Assign all trips/vehicles to the route with minimum cost Assume travel time does not change with volume Equilibrium assignment

5 All or Nothing Assignment O D 10 min 12 min If there are 600 vehicles traveling between O and D, all of them will be assigned to the shortest route (with 10 min travel time). 600 600 veh 0 veh

6 Problems of “All or Nothing” Assignment Ignore capacity constraint Ignore the fact that travel time is related to flow level

7 Highway Performance Function Flow-dependent travel time Free flow travel time (t f ) Typical form: a.k.a. BPR function

8 Equilibrium Assignment Basic Assumptions Travelers know the exact cost of choosing each route Travelers always choose the routes that minimize their own travel cost

9 User Equilibrium Model travelers’ route choice behavior Equilibrium condition: Between an OD pair, All used routes will have the same travel time; All unused routes will have longer travel time(s).

10 Example 1 O D t 1 = 6 + 4x 1 t 2 = 4 + x 2 2 4500 x 1 (thousand vehs) x 2 (thousand vehs) At equilibrium, let t 1 = t 2  6 + 4x 1 = 4 + x 2 2 x 1 + x 2 = 4.5 x 1 = 1.6 x 2 = 2.9

11

12

13 Population, Household by TAZ – Woodford County

14 Estimated Speed

15 Congestion Level (V/C ratio) Estimation