Dave Hughes UK Session 6 – Block 2 – Presentation Barcelona 12-15 May 2003 ea technology 1 A Programme for Effective Research into Substation Plant Condition.

Slides:



Advertisements
Similar presentations
Anne Hurley, CEO Communications Alliance Seeing beyond the horizon CommsDay Summit 2008 Industry Futures Symposium.
Advertisements

Strategic Human Resource Management
3PM, 11th February 2004 Patio Hotel, Aberdeen Inaugural forum
Cisco Confidential © 2012 Cisco and/or its affiliates. All rights reserved. 1 Cisco Partner Plus: Premium Enablement Accelerate Your Competitive Edge.
Principles of Project Design and Management Moving from Program to Project in 4 Easy Chapters.
A Proposal Dr Susan Hamer
Information and Communication Technologies (ICT) in the Seventh Framework Programme Support actions.
SMEs – collaborating with a HEI 9.00 – 9.30 registration Introduction to the day Intro and icebreaker – getting to know, reflecting.
ORÇUN B İ LEN Maintenance involves fixing any sort of mechanical or electrical device which has become out of order or broken. It also includes.
1 PILOT CASE: Championship for energy saving in public buildings GRANOLLERS-LAG: Local Working Group on Savings and Energy Efficiency (LWG_SEE) interdepartamental.
GENERAL IDEAS IN AIR POLLUTION CONTROL
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
Preparing Your Business Plan
The Analyst as a Project Manager
EUROPEAN REGIONAL DEVELOPMENT FUND INTERREG EUROPE 2014 – 2020 Perspectives & possibilities Petra POLASKOVA Joint Technical Secretariat INTERACT on article.
The Strategic Management Process
Principles of Management Learning Session # 25 Dr. A. Rashid Kausar.
EUROPEAN REGIONAL DEVELOPMENT FUND GreenInfraNet/Smart Europe final conference, 4 November 2014, Almere EU Interregional Cooperation State of play and.
Urban-Nexus – Integrated Urban Management David Ludlow and Michael Buser UWE Sofia November 2011.
Mantova 18/10/2002 "A Roadmap to New Product Development" Supporting Innovation Through The NPD Process and the Creation of Spin-off Companies.
Foundation Degree IT Project Methodologies (for reference)
Energy MAP Plastics Sector Workshop 3 Monday 11 th December 2006 Port Laoise Alan Ryan / Elizabeth Muldowney SEI.
Investment Portfolio Methodologies Pertemuan Matakuliah: A Strategi Investasi IT Tahun: 2009.
Developing an IS/IT Strategy
TR 07- FI- 02 INTERNAL CONTROL – basic course RISK MANAGEMENT January 2009 EU Twinning Project TR 07-FI-02.
ea technology Effective Condition Assessment of MV Switchgear
Chapter 9 Developing an Effective Knowledge Service
A new start for the Lisbon Strategy Executive summary Increase and improve investment in Research and Development Facilitate innovation,
Sommerville Power Engineering Ltd. Introduction & Overview Company Number , registered in England & Wales. SPE August 2015.
1/20 ea technology MicroCHeaP: Month 24 meeting Athens Work Package 4 presentation 21 September 2006 Presented by Yvonne Dickson Partners in power asset.
September 13, 2007SGH&M2B International&Training Workshop What does the European Technology Platform “Innovative Medicines initiative” offer? Vitalijs.
The Coca Cola Company. Introduction Coca-Cola is the largest soft drink manufacturing company in the world. The company operates in many countries across.
EUROPEAN REGIONAL DEVELOPMENT FUND Event – date, place About INTERREG EUROPE INTERREG EUROPE INTERREG IVC Joint Technical Secretariat.
Software Innovation Course - Presentation 3/
1 U08784 Software Project Management lecturer: Timothy Au url:
EUROPEAN REGIONAL DEVELOPMENT FUND Cogita Final Conference, 23 October 2014, Bologna EU Interregional Cooperation State of play and perspectives Elisa.
Paul Dyer Condition Criticality Risk Rating and Condition Monitoring in a Distribution Network PAUL DYER DAVE OPENSHAW London Electricity Group.
New-Product Development Session $50 billion in profits over 27 years $50 billion in profits over 27 years Early new-product development relied.
1 PILOT CASE: Installation of remote control systems for energy management in public buildings participating in “Championship” GRANOLLERS-LAG: Local Working.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Frankfurt (Germany), 6-9 June 2011 Dr David Hughes and Paul Barnfather EA Technology UK David Hughes – UK – Session 6 – Paper 0088 Building Risk Based.
WSGA ‘Plan to Grow’ Conference 18 th November 2015 ‘WATERR’ Project Findings and Support Opportunities and Challenges for the Irrigation Sector in South.
EUROPEAN REGIONAL DEVELOPMENT FUND Stakeholder Workshop Brussels – 5 February 2014 INTERREG EUROPE Nicolas Singer | Senior Project Officer INTERREG IVC.
S. GRENARD/ D. MELOVIC/ G. STRBAC UK Alpha 5 – Block 2.1 Barcelona May Effect of losses on design and regulation of distribution networks.
Public health, innovation and intellectual property 1 |1 | The Global Strategy on Public Health, Innovation and Intellectual Property Technical Briefing.
- 1 - RSPG 26 th Plenary Meeting Mike Byrne, Chairman (2011) Roberto Viola, Vice-Chairman RSPG Briefing Session Brussels, 16 November 2011.
1 25th May Wroclaw DISTRICT+ Disseminating Innovative STRategIes for Capitalization of Targeted Good Practices DISTRICT+ EAST _INNO_TRANSFER Brasov.
CONFLICTS OF TECHNOLOGY AND ETHICS By Stephen Glossner.
Richard Escritt, Director – Coordination of Community Actions DG Research, European Commission “The development of the ERA: Experiences from FP6 and reflections.
PRESENTATION attached to the application for participation in the Competitive Selection dated_____________________ Innovation Project: […] Entity: […]
Driving Innovation Technology Strategy Board The UK’s agency for business innovation –Business benefit –Economic growth –Quality of life.
Minor projects proposed approach.  Purpose of the session is to provide an overview of the proposed process for the review of Transpower’s minor projects.
Driving Innovation V Power electronics – Enabling a resilient energy system, KTP thematic competition Christian Inglis – energy supply team Creating.
TOTAL QUALITY MANAGEMENT
EUROPEAN REGIONAL DEVELOPMENT FUND CLUE final conference, 24 September 2014, Turin EU Interregional Cooperation State of play and perspectives Johanna.
A Predictive Maintenance Strategy based on Real-Time Systems
ILO and Tripartism: Workers’ Perspectives
Strategic Information Systems Planning
Planning Monitoring & Controlling the Maintenance Programme
Systems Analysis and Design in a Changing World, 4th Edition
<Student’s name>
KEYNOTE STAGE SPONSOR.
2005 MRG stakeholder day Concerns and proposals of the downstream oil industry J-F. Larivé, CONCAWE.
Ageing Management Session Name: Principles of Ageing Management
Foundation Degree IT Project
International Financing Institutions (IFI) Engagement
Strategic Uses of Information Technology
E-government Working Group
Scaleup Programme Overview & Introduction
Regional Operations Forum Setting the Stage
Presentation transcript:

Dave Hughes UK Session 6 – Block 2 – Presentation Barcelona May 2003 ea technology 1 A Programme for Effective Research into Substation Plant Condition Dave Hughes (UK) Session 6 - Block 2 EA Technology

Dave Hughes UK Session 6 – Block 2 – Presentation Barcelona May 2003 ea technology 2 Strategic Technology Programme Providing research, without infringing commercial or competitive concerns DNOs collaborate to tackle technical and business problems of mutual interest STP programme is developed in response to business needs and is not "technology led Outstanding feature is free flow of information and has contributed to success of the programme

Dave Hughes UK Session 6 – Block 2 – Presentation Barcelona May 2003 ea technology 3 Distribution substation plant Concentrated on maintenance/replacement strategies for substation plant and equipment Fundamental studies to understand the degradation and failure processes of the plant and equipment This knowledge exploited to provide techniques, devices, tools and strategies that provide technical solutions and business benefits to members

Dave Hughes UK Session 6 – Block 2 – Presentation Barcelona May 2003 ea technology 4 Successes to Date Shorter-term projects, targeted at specific problem areas, have brought immediate benefits Interrelated projects in a theme area to provide a continuing thread of projects leading to innovation for long term improvements

Dave Hughes UK Session 6 – Block 2 – Presentation Barcelona May 2003 ea technology 5 Oil Switch Headspace Gas STP rapidly developed a device for headspace gas testing to deal with a pressing operational problem Gave immediate and significant safety, operational and monetary benefits

Dave Hughes UK Session 6 – Block 2 – Presentation Barcelona May 2003 ea technology 6 Oil Degradation Monitoring by Headspace Gas Testing Concept being extended to establish a non- invasive method of determining oil condition at all stages of degradation via the headspace gas Should provide substantial benefits by providing a non-invasive condition-based approach to maintenance strategy

Dave Hughes UK Session 6 – Block 2 – Presentation Barcelona May 2003 ea technology 7 Oil Sampling Fundamental studies by STP established that the condition of oil in 11kV switchgear is the critical factor in determining the need for maintenance Concept of oil sampling as a viable means of determining the optimum maintenance frequency Allowed DNOs to implement significant changes to the maintenance strategies and policies for oil switchgear, resulting in considerable cost savings

Dave Hughes UK Session 6 – Block 2 – Presentation Barcelona May 2003 ea technology 8 Live Tank Oil Sampling Provided impetus for development of techniques for live tank oil sampling now being used in UK

Dave Hughes UK Session 6 – Block 2 – Presentation Barcelona May 2003 ea technology 9 STP Programme for Substation Plant Over 80 projects undertaken to date “Hard” issues –Plant and equipment studies “Soft” issues –Strategy and policy, plant data management, etc. Many new proposals in the pipeline for consideration in the future work programme.

Dave Hughes UK Session 6 – Block 2 – Presentation Barcelona May 2003 ea technology 10 Summary STP programme can be recommended as a proven model for providing research. Collaboration on problems of mutual interest, without infringing commercial competitive concerns Member companies do require positive return on their investment Programme has run for 6 years & is continuing is testament to fact that it has provided that return.