DC234KL Dust Extraction Adaptor rebuild Reason for change –In 2010 a cordless dust extraction unit was brought to the market. –When connecting the cordless.

Slides:



Advertisements
Similar presentations
How To Install RAM In Laptop Installing Larger RAM is the easiest way speed up your laptop computer. This Post will guide you about installing laptop computers.
Advertisements

DS1000B-RM/ DS1500B-RM Battery Replacement Procedure.
Equipment for Assembly Fluke Multimeter 115 True RMS Glue Ring Jig Flathead screwdriver 60 Watt desk lamp HIOS Cl 4000 Electric screw driver Anti-static.
AC-SSC-1 Installation and operation manual
Condensate Trap Heater KGAHT0201KIT 2013 Fall Zone Meeting Gary Georgette/Jerry Shipman UTC Climate, Controls & Security Confidential and Proprietary Information.
Installation of Peripherals. I. Backup Battery.
Breaking, Measuring, and Adjusting Chain ~The most used drive system on a FIRST robot uses chains and sprockets. Understanding the proper techniques to.
GLOBAL LIFT CORP COMMERCIAL SERIES PORTABLE KIT Portable Kit -
Installation Quick Guide AD400 Cylindrical 6/01/13 Doc #
Lucas Air Mass Meter Stripdown sequence and technical information.
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
Model 495/496 EP Full lift safety valve with spring loading (AIT) model 495/496 - EP. 1. Disassembly and assembly. 1.1 Disassembly. To replace the spring,
Wiring Color Codes for McLean County 4-H Projects.
CEILING FAN Object:- To study the part dismantling reassembling testing and repairing of ceiling fan. By:- Surya Lal TGT (WE) K.V.2,FCI GORAKHPUR.
Which type of circuit has more than one path for electricity to flow?
Model DISASSEMBLY AND ASSEMBLY 1- Disassembly To replace the spring (11), or clean any of the internal components of the valve, proceed in the.
2008 Cadillac CTS With Original Antenna
AquaGlo Water Detector Kit For Detecting Water in Jet Fuel
American Electrical, Inc. Junction Box / Hookup Box Fast and easy way to make electrical connections An assembled kit – no need to procure and assemble.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Service Bulletin 161 SUBJECT: Upgrade to current production level UNITS:D27105 DATE CODE RANGE: All units up to date code to be checked ISSUED.
Reed Switch Motor By Troy Coleman & Colby Cravens.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Title: Corvette C5 Column Lock Bypass Originator: John Neese Date: 30 Jan 2005 Revision: Sheet: 1 of 6 Column Lock Bypass.
Treezilla Clinic Lonestar Region, Division 3 - Mike Jobe.
Installation. Indoor Unit Installation Typical Installation.
Removing and Replacing the Battery Cover 1. Ensure the phone is turned off. 2. Press the Battery cover locker; lift the battery cover up and away from.
Elementary Electronics for Switch Activities Hsin-yu Chiang.
Electric circuits 1. SymbolNameDescription of how it works.
Reliability MANUAL CARTRIDGE UNLOAD Super DLT1 Presented By Quantum Technical Services.
Please read all the instructions carefully before the installation. Installation shall be carried out by experienced mechanic. Follow the steps in the.
ASSEMBLING THE PCB – V3.914 Hold the PCB as shown below.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
Insert White, Black and Yellow Wires into Switch Terminals as Shown Rotate Switch to Bend Wires. The Wires Should be Bent as Close to the Terminal End.
Electronics Investigation Investigation 1. Circuits Flow of electricity is current Current flows in a circuit Flows in one direction Closed = complete.
How to Change Raptor Knife Blades. Step 1: Use a Phillips screwdriver to remove the 5 screws. It is not necessary to remove the lanyard/webbing to change.
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
Page 1 Hardware Disassembly | © 2008 Lenovo Lenovo Confidential Lenovo Confidential Lenovo Confidential Lenovo Confidential Lenovo Confidential Please.
Replacing the Main Monitor 1.Open Lower Main Door, and turn off machine power 2.Open the upper main door 3.Disconnect the video and power plugs from the.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Automation and Drives A&D SD Customer Service & Support A&D SD CST 20/11/04 1 of 13 10A Control Board Exchange.ppt Introduction Procedure Setting up Exchanging.
ELECTRICAL TOOLS and ITS FUNCTION
To install the four wires from the back of the coil machine, loosen the four knobs. Keep each wire in center under each knob, off to the side will allow.
WELCOME TO EVM WITH VVPAT TRAINING FOR ARO’S and STAFF
PostBase Automatic Feeder Component Removal Service Training
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Controller Rework.
Installing the SIM CARD and Battery
6. Disassembly & Reassembly
सोलर पॅनेलचा उपयोग करुन रीचर्जेबल टॉर्च बनवणे.
Removing the Backshell from Oil Pressure Sensor Connector Option Impacted: WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,
Electrical Wiring Single Pole Switches.
To install the four wires from the back of the coil machine, loosen the four knobs. Insert each of the four wires from the side under the knobs. Keep each.
3000CIV 21/2”-10”.
909 21/2”-10”.
Reader Swap out Guide.
2000CIV 2½ ”-10”.
4000CIV 21/2”-10”.
Step 1:Disassemble battery case
Replacing TrueAir Thermostat with Ecobee SI
909 RPDA 21/2”-10”.
Step 1:Disassemble battery case
Step 1:Disassemble battery case
709 2½ ”-10”.
Step 1:Disassemble battery case
AquaGlo Water Detector Kit For Detecting Water in Jet Fuel
Presentation transcript:

DC234KL Dust Extraction Adaptor rebuild Reason for change –In 2010 a cordless dust extraction unit was brought to the market. –When connecting the cordless dust extraction unit to the battery of the 36V hammer (DC234KL) a power supply adaptor is needed that is located on the bottom of the unit –This power supply adaptor is included with all the 36V hammers (DC234KL) having datecode 2009 and upward –For units with a datecode before 2009 the two battery covers and the wire harness of the 36V hammer (DC234KL) has to be changed Parts needed: –N (SA WIRE HARNESS,36V ROTO HAMMER) –N (BATTERY COVER 36V DE SET) Background

DC234KL Dust Extraction Adaptor rebuild Overview DC234KL with date code before 2009 do not have the adaptor for dust extraction. Adaptor can be added for units build before Dust Extraction adaptor area Unit with date code < 2009 Unit with date code > 2009

DC234KL Dust Extraction Adaptor rebuild Step I Remove the Battery. Turn the unit on it’s side and release the 5 marked screws. Now turn the unit to the opposite side and remove the clamshell.

DC234KL Dust Extraction Adaptor rebuild Step II Remove the spring and release button from the clamshell half. Lift the wire harness out of the clamshell.

DC234KL Dust Extraction Adaptor rebuild Step III Release the clamshell from the other side. Open the handle cover.

DC234KL Dust Extraction Adaptor rebuild Step IV Disconnect the four wires of the wire harness from the switch terminals. Connect the four wires of the new harness to the terminals. 2x

DC234KL Dust Extraction Adaptor rebuild Step V Assemble the new clamshell to the main unit and insert the wire harness. Refit the release button and spring. Apply the Dust extraction adaptor in the clamshell (marked area).

DC234KL Dust Extraction Adaptor rebuild Step VI Now apply the second clamshell and properly insert the adaptor in the upper clamshell. Finally close the clamshells together and tighten the screws.