About Water Purification Station Changgen Yang. Main water purification station. It is too high in this plot, we would like to change to ~4m. It is located.

Slides:



Advertisements
Similar presentations
Shimul Housing.
Advertisements

Pipeline Carbon and Sustainability Estimating West East Link pipeline.
Filtration of Water in the Recharge Zone  Water travels through soil, sand/clay to the aquifer.  What if any contaminates are removed by these layers.
Up Small Window Bed Room 6 m 4 m 2 m 1 m 4 m Path Room Hallway 2.6m.
Repairing of Building Services Engineering Systems Rak Repair Methods of Structures, exercise (4 cr) Esko Sistonen.
Water for Pharmaceutical Use Water Purification Engineering Md. Saifuzzaman Associate Professor Pharmacy Discipline, KU.
Lesson 10 How can you reduce radon in a home? Slide 10-1 Brief overview of radon mitigation Mitigation: reducing radon in air or water Requires trained,
Foundation Systems.
SNOLAB Facility Status Fraser Duncan SNOLAB Workshop 27 August 2009.
Muskegon Wastewater Treatment Facility
1 Civil Structure of Water Pool Changgen Yang. 2.
Update of Water Station Changgen Yang. Main water purification station is 100m south of the intersection point of the construction tunnel with main tunnel.
Managed by UT-Battelle for the Department of Energy Review of NFMCC Studies 1 and 2: Target Support Facilities V.B. Graves Meeting on High Power Targets.
Water Treatment and Distribution in London. Lake Huron & Elgin Area Water Supply Systems London is supplied treated water through the Lake Huron Primary.
1 Daya Bay Muon system Installation Workshop, Daya Bay, March 22, Daya Bay RPC Gas System Installation Plan Changguo Lu Princeton University.
History In 1932 Plymouth constructed its first wastewater treatment plant In 1959 they transferred the sewage utilities over to Plymouth Utilities.
Rainwater Harvesting.
Topic C1 Superstructures - walls
Www. MtEverestBiogasProject.org May, ,000 Kg of waste left by climbers each year Waste is hiked down to pits near Gorak Shep.
 This presentation deals with solar water heaters.  There are two categories (passive, active)  There are two common types (conventional, vacuum tubes);
Circuits and Symbols. The flow of electrons through a circuit Electricity A closed circuit allows electricity to flow An open circuit has a break so electricity.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
HEAT EXCHANGER.
Pumps applications water Water intake Water treatment Water distribution Wastewater operations In irrigation concrete pumping discharging oil pumpingdischarging.
Section 1 Dr.Hoda’s part Sheet 1: Calculating equipment cost Eng. Reda Zein.
Fire Prevention for Construction. Four classes of fires  A, B, C, and D 1a.
General meeting LAGUNA LAGUNA – Fréjus site
Change of Phase (state) SolidLiquidGas SolidXmeltingsublimation LiquidfreezingXevaporation Gas “anti- sublimation” deposition condensationX.
1 11/11/2003 NBI Decay Tube and Windows Presentation by Ans Pardons 1 Decay Tube & Windows Introduction (Location, Planning) Decay Tube Entrance.
Questions Before the Civil Conceptional Design Changgen Yang Daya Bay Collaboration Meeting 2006/06/09.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
JPARC- Decay Volume M.Sakuda (KEK) 11 November Decay Volume Requirements Design 2. Construction Status 3. Summary and schedule In collaboration.
1 GE CONFIDENTIAL AND PROPRIETARY INFORMATION - NOT FOR PUBLIC DISCLOSURE Dishwasher Wash System Upgrade Benefits Sound Reduction Less Water Consumption.
Lift Typical Building Floor Plan. Complete with fire walls. Click on and we will add Some of the different Passive and Active systems that you could come.
About Us  We are a group of Mechanical Engineers specialized in Construction & Engineering Services.  Our mission is to provide highest quality of construction.
LEARNING OBJECTIVES IDENTIFY WHAT AN EARTHQUAKE IS IDENTIFY FEATURES OF AN EARTHQUAKE.
Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.
Materials, Design, Procedures,Costs. Materials PVC Pipe 2 Mineral water bottle with hard plastic 2 gallons 2 tap water Fabric Carbon active zeolith Aquarium.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
J T Volk Fermilab April 2008 Ground Motion Studies at Fermi National Accelerator Laboratory James T Volk Applications Physicist II Vladimir Shiltsev, Shavkat.
Water Sanitation By: Brandon Justman, Cesar Garza, Ellen Michels.
 Water Purifier.  CFL lamp and Ceiling Fan in each room.  Exhaust fan in kitchen & toilets.  Solar Water Heating System for Master Bedroom Toilet.
POOL CONSTRUCTION THE 5 MAJOR STEPS 1. Plan2. Dig3. Build4. Finish 5. Swim!
Page 1 Sapphire by pass line  Design Concept of Cooling Water System : Funnel 10 line Tank 2 10 tones Chiller -20cm tilt - 5cm distance between growers.
V-TEPPFA 5N/ October 2014 PP pipe systems for Soil & Waste applications.
Toilet design Many different regulations 1. guess what toilet features might be regulated? building code? accessibility code? universal design?
Simulation of heat load at JHF decay pipe and beam dump KEK Yoshinari Hayato.
TRUMAN MIDDLE SCHOOL Presented by Counsilman ▪ Hunsaker Facility Audit.
Mike Andrews May 10, Week 54 NuMI Activities Initial test controls on the MI65 RAW exchange skid Complete hydrostatic test of the MI65 exchange.
1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) ALAN AULD GROUP LTD The design of a pan-European.
How to Make, Use, and Reuse an Arborloo. Step 1: Make the Concrete Slab Create 1 m Diameter ring of bricks and line with plastic and place brick/bucket.
Examples. Example 2 A thin cylinder 75 mm internal diameter, 250 mm long with walls 2.5 mm thick is subjected to an internal pressure of 7 MN/m 2. Determine.
Cavity Wall Construction
CAD-Architecture Inst: Mr. Johnston Logan High School
COAL HANDLING SYSTEM FFBL POWER COMPANY LTD. Presented by :
Air-cooled Modular Chiller Installation
GROUND IMPROVEMENT TECHNIQUES
EXERCISES Two water reservoirs are connected by a pipe 610m of 0.3m diameter, f’=0.038 and the flow produced by the difference in water surface elevations.
Photo Album by V. Venkatesan.
FCC Tunnel and Shaft Cross Sections
Hybrid Access Optional Study
Natural Gas Processing Plant
Electrical Gas Plumbing Heating & Cooling
Stainless Steel Water Well Casing.
How can you reduce radon in a home?
Water Types of water Sewer systems TCU/VIA 6th semester workshop
Columbia Astrophysics Laboratory
BEER cave design and shielding
Presentation transcript:

About Water Purification Station Changgen Yang

Main water purification station. It is too high in this plot, we would like to change to ~4m. It is located 50m south of the intersection point of the construction tunnel with main tunnel 13m 11m

A B C Pump for water transfer Pump for water circulation Pump for waste water Seepage water Water pre-treatment Pure Water System City water Pool 0# Pool 3# Pool 1#Pool 2# Drain stainless pipeline for water pool filling pressure pump circulation pump waste water pump pressure pump circulation pump waste water pump DN65 flux 1.7 km Attenuation:0.4MPa DN65 flux 1.7 km Attenuation:0.4MPa pressure pump sink Waste water pool, pump inside Pool #0 dry pump room pressure pump waste water pool waste water pump waste water level Further calculation needed to see if we can share the pump in the circulation System - it may waster energy to do so since the lift path needn’t be large.l city water pool waste water waste water pump room pressure pump room pure water pipeline system - s. steel exchange water pipeline - plastic or s. steel pre-treatment water pipeline - plastic or Carbon steel. Use canal above. waste water pipeline - plastic or Carbon steell

A One may use the same pump for water circulation and water transfer between pool 1~3 and pool 0, but these pumps may different for different purpose. B It is possible to use the tunnel seepage water if we add a pre- treatment at least to filter the seepage water, the estimated cost is about 30k$. C One can put all the pumps in the sump, the sump exit can be in the EH (crane access easier but ditch will be needed from water circulation room to the sump ), or in the water circulation room (no crane and no ditch). Put the water circulation pump in the water pool may not good because it’s operation might cause noise to the PMTs.

Move the pump pit to the other corner of the pool or directly to the water purification room? (need a crane to lower pump) water well drain strobe RPC rail RPC rail travel limit scale Unit for pipe diameter is mm, others m concrete spray-concrete armor plate brick wall crane hook limit fire doors #3 laboratory diagram (detectors 2x2) Low noise lab Shelter room toilet Main tunnel Gas room Electro- nics room Water purification room Emergency exit fire door Control cabinet