Presentation is loading. Please wait.

Presentation is loading. Please wait.

Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.

Similar presentations


Presentation on theme: "Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011."— Presentation transcript:

1 Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011

2 Building 16 and 17 are inside a common environment with building 153, 162, 18, 173 and 256

3 Building 16 is used mainly by PH DT, but also LHCb and some other scattered users (e.g. CLOUD, ATLAS ) Building 17 is used by AB and PH (1 st floor) Building 153 is used by PH/DT (assembly hall) Building 162 is used by AB and PH (mechanical workshop) Building 173 is used by AGEIS, CMS and PH/DT Building 256 is used by PH/DT (gas calibration lab, renovated in 2009/10)

4 VIEW OF GROUND FLOOR LEVEL OF BUILDINGS 16,17,153,162

5 BAT 16 BAT 153 BAT 162 BAT 17

6 BAT 16 BAT 173 BAT 153

7 In 16 and 17 we have mainly offices with few labs and one meeting room. In 153, 162 and 173 we have labs with workshop and assembly area. This area is sharing a 40 tones crane and the whole building complex is served by a single heating system and it is an open volume, so noise is shared by all users.

8 List of urgent renovations need for building 16 and 17 independently of the total area problematic In view to have a safe and clean working environment Installation of emergency evacuation lighting. Building 16 : ground floor and first floor need 2 each. Building 17: ground floor, first floor and 2 nd floor need 2 each.  Total 10 evacuation lamps. Reparation of almost destroyed water pipes connections (cf picture 1 on following page)

9 Consolidation of cracks on walls due to crane movement and revision for the maximum load for the crane ( three major cracks identified – two on first floor bldg 16 and one on ground floor of Bldg 16.) the major one is more than 2 meters long and open almost 5 mm!!! Cf pictures7 to 10 on following slides. Painting of one toilet and reparation of tiles in two toilets.(12m2 painting and 2 m2 tiles) External blinds reparation or exchange, (10 windows for buildings 16 and 17) Painting of Copy machine room, bat 16. (10m2)

10 Picture 1 Picture 2 Picture 3

11 Picture 4 Picture 5 Picture 6

12 Picture 7Picture 8

13 Picture 9 Picture 10

14 General problems for Building 16, 17, 153, 162 and 173 Heating is actually performed by a very old system. Cf picture 4 Regularly out of order, not efficient and very noisy. But very big volume to heat (16, 17 and 153 and 162) and the insulation of the buildings should be reviewed in parallel Noise: from heating and heat treatment activity (power supply) Cf report at the end

15 Water leaks from the roof Asbestos dust should be checked Bad smell from waste water

16 Noise measurement report

17

18

19


Download ppt "Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011."

Similar presentations


Ads by Google