November 14, 2014 District 6 2015 Construction Season.

Slides:



Advertisements
Similar presentations
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Advertisements

January 23, El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville.
Environment Department Management Branch Pat Smyth Assistant Highway Engineer Hampshire Highways East Highway Maintenance.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Columbia County Road Department Department Presentation June, 2013 By David Hill.
Georgia DOT Local Maintenance Improvement Grant Program Todd Long, P.E., Deputy Commissioner.
February 2013 Quarterly Luncheon. Platte County Public Works Bridge replacements Improvements to current roadways New roadways to serve growing demand.
Duane Hill, District Engineer
6 th Street Water Main And Street Reconstruction 2013.
DISTRICT 7 CONSTRUCTION PROGRAM Frederick Carroll Howard.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Town of Westerly Pavement Improvement Plan  Determine current pavement condition.  Identify and prioritize needed repairs.  Coordinate with RIDOT.
Construction Industry Advancement Program John T. Withers, P.E.,P.P. Supervising Engineer, Highways/Buildings - Design New Jersey Turnpike Authority Working.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Update on Proposed Project.
Contact: Beth Morris
District 2 System Preservation Projects for FY 14 and FY 15 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Capital Improvement Projects 2014 A Snapshot of Current Construction Activity in the City of Irvine.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Welcome.
DISTRICT 1 November 2014 DONNIE DREWER DISTRICT ENGINEER.
Washington County, Oregon March 19, 2014 Board Meeting Engineering Department Report.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
2004 C.E.I.C. Youth Organization Award. Youth Organization Awards Cub Scout Pack 421 Family Only one organization a year is presented.
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
PWC Quarterly Transportation Report DATA Roundtable June 17, 2015 Rick Canizales – Chief Department of Transportation.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Monroe County Transportation Projects 4 Local Agencies: Unincorporated Monroe County City of Key West City of Marathon Village of Islamorada District Six.
Street Maintenance. The Town of Bayfield maintains centerline miles of road.
November 20, 2013 District Construction Season.
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
Westfield Public Works Department Jeremy Lollar, Director June 8, 2015.
Comprehensive Update on Indian Trail Infrastructure Plan September 8, 2015.
Community Development Department Construction Phase.
Updated 2011 & New 2012 Landscape Projects Grand Haven.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
Presentation to the Chamber of Commerce Friday, April 23, 2010.
Justin Hardee, P.E. Lee County Engineer.  ALDOT Policy  Construction Process  Status  Lee County’s Bridge Inventory  2010 Bond Issuance for Bridges.
District Five Upcoming Projects. Structures Estimated Value AA MD 648AA Over Cattail Creek500K – 1M CA MD 261 Over Fishing Creek 15M – 30M.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
CENTRAL FLORIDA EXPRESSWAY AUTHORITY FY Five Year Work Plan December 10, 2015 Presented by: Jeanette Maldonado-Ambler, PE Atkins.
Trade Transportation Activities Report Bill Frawley, TTI 2012 Border to Border Transportation Conference South Padre Island, TX November 14, 2012.
Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services.
Public Works Capital Projects FY Projects Completed FY 2014.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
National Organization of Minority Engineers Metropolitan Water Reclamation District of Greater Chicago June 30, 2016.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
Town of Brighton, Department of Public Works
Chapin Town Hall Meeting
San Mateo Bridge Replacement Project Caltrain Replaces Four 100-Year-Old Rail Bridges May 2, 2013.
DISTRICT 1 ADVERTISED PROJECTS
Mr. Greg Slater, Administrator
Welcome.
Presentation cover; need to take off boarder on PPLM photo
District Construction Season
Pavement Improvement Plan 2009
District Five Upcoming Projects
H64:02 Clear River East & West Hills Sept 8/99 (mvc-019f)
Monterey County Project Report for Measure X Expenditures
Butler County engineers Office
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

November 14, 2014 District Construction Season

District 6 Construction Anthony F. K. Crawford District Engineer Anthony F. K. Crawford District Engineer Stephen A. BucyAssistant District Engineer Stephen A. BucyAssistant District Engineer Devin Miller Area Engineer Devin Miller Area Engineer John F. Ruff Office Engineer John F. Ruff Office Engineer Lisa A. PiperAdministrative Assistant III Lisa A. PiperAdministrative Assistant III Daniel McKenzieConstructability Reviewer Daniel McKenzieConstructability Reviewer

Ron RitzBrian Boyer Jeff Foreman Tom Fulton Raymond “Butch” Foreman Dave Bittner Elwood “Woody” Carpenter Steve Wiley John Veronick Travis Yates Steve Hall Derick Winfield District 6 Construction

Safety & Resurface AL MD 51 – Pack Horse Road to Town Creek Bridge MD 51 – Pack Horse Road to Town Creek Bridge Cost Code: D Cost Code: D $1,000,001 to $2,500,000 $1,000,001 to $2,500,000 Ad Date: 4/14/15 Ad Date: 4/14/15 Bid Opening: 5/21/15 Bid Opening: 5/21/15 Est. NTP: 7/27/15 Est. NTP: 7/27/15

Safety & Resurface GA MD Resurface MD 135C to Chestnut Grove Road MD Resurface MD 135C to Chestnut Grove Road –Note: Plan to use Cold In-Place Recycling for base. Cost Code: E Cost Code: E $2,500,001 to $5,000,000 $2,500,001 to $5,000,000 Ad Date: 2/17/15 Ad Date: 2/17/15 Bid Opening: 3/26/15 Bid Opening: 3/26/15 Est. NTP: 6/1/15 Est. NTP: 6/1/15

Safety & Resurface GA I-68 Safety and Resurface 0.54 Miles East of Lower New Germany Road Bridge # to 1.01 miles West of MD 546 Bridge # I-68 Safety and Resurface 0.54 Miles East of Lower New Germany Road Bridge # to 1.01 miles West of MD 546 Bridge # Cost Code: F Cost Code: F $5,000,001 to $10,000,000 $5,000,001 to $10,000,000 Ad Date: 11/5/14 Ad Date: 11/5/14 Bid Opening: 12/11/14 Bid Opening: 12/11/14 Est. NTP: 2/16/2015 Est. NTP: 2/16/2015

Safety & Resurface WA I-70 East Bound – Resurface 0.75 Mile East of MD 615 to 0.28 Mile East of MD 56 I-70 East Bound – Resurface 0.75 Mile East of MD 615 to 0.28 Mile East of MD 56 Cost Code: E Cost Code: E $2,500,001 to $5,000,000 $2,500,001 to $5,000,000 Ad Date: 12/9/14 Ad Date: 12/9/14 Bid Opening: 1/15/15 Bid Opening: 1/15/15 Est. NTP: 3/23/15 Est. NTP: 3/23/15

Safety & Resurface WA US 40 - Resurface Walnut Street to Crest View Road US 40 - Resurface Walnut Street to Crest View Road Cost Code: D Cost Code: D $1,000,001 to $2,500,000 $1,000,001 to $2,500,000 Ad Date: 3/3/15 Ad Date: 3/3/15 Bid Opening: 4/9/15 Bid Opening: 4/9/15 Est. NTP: 6/15/15 Est. NTP: 6/15/15

Bridge AL MD 956 over Potomac River MD 956 over Potomac River Cost Code: D Cost Code: D $1,000,001 to $2,500,000 $1,000,001 to $2,500,000 Ad Date: Late 2015 Ad Date: Late 2015 Bid Opening: Bid Opening: Est. NTP: 3/2016 Est. NTP: 3/2016

Bridge Painting AW At Various Locations in Allegany County and Garrett County At Various Locations in Allegany County and Garrett County Cost Code: D Cost Code: D $1,000,001 to $2,500,000 $1,000,001 to $2,500,000 Ad Date: 9/16/14 Ad Date: 9/16/14 Bid Opening: 10/23/14 Bid Opening: 10/23/14 Est. NTP: Est. NTP: Notes: Award to Titan Industrial Notes: Award to Titan Industrial

Bridge Painting WA Clean and Paint Bridges at Various Locations on National Freeway, Eisenhower Memorial Highway and Millstone Road Clean and Paint Bridges at Various Locations on National Freeway, Eisenhower Memorial Highway and Millstone Road Cost Code: D Cost Code: D $1,000,001 to $2,500,000 $1,000,001 to $2,500,000 Ad Date: 10/21/14 Ad Date: 10/21/14 Bid Opening: 11/25/14 Bid Opening: 11/25/14 Est. NTP: 2/2/15 Est. NTP: 2/2/15

Geometric Improvements AL US 220 at Louise Drive US 220 at Louise Drive Cost Code: D Cost Code: D $1,000,001 to $2,500,000 $1,000,001 to $2,500,000 Ad Date: 2/17/15 Ad Date: 2/17/15 Bid Opening: 3/26/15 Bid Opening: 3/26/15 Est. NTP: 6/1/15 Est. NTP: 6/1/15

Geometric Improvement WA MD Roundabout at MD 910C (Western Maryland Parkway) MD Roundabout at MD 910C (Western Maryland Parkway) Cost Code: D Cost Code: D $1,000,001 to $2,500,000 $1,000,001 to $2,500,000 Ad Date: 10/28/14 Ad Date: 10/28/14 Bid Opening: 12/4/14 Bid Opening: 12/4/14 Est. NTP: 2/9/15 Est. NTP: 2/9/15

Safety Improvements AX513 I-81 South Bound Truck Pull Off Area I-81 South Bound Truck Pull Off Area –Note: Plan to use concrete pavement. Cost Code: C Cost Code: C $500,001 to $1,000,000 $500,001 to $1,000,000 Ad Date: Spring 2015 Ad Date: Spring 2015 Bid Opening: Bid Opening: Est. NTP: Est. NTP:

Facilities Improvements WA Hagerstown Shop – Storage Tank Removal and Replacement Hagerstown Shop – Storage Tank Removal and Replacement Cost Code: C Cost Code: C $500,001 to $1,000,000 $500,001 to $1,000,000 Ad Date: 7/22/14 Ad Date: 7/22/14 Bid Opening: 8/28/14 Bid Opening: 8/28/14 Est. NTP: 11/3/14 Est. NTP: 11/3/14

Guard Rail GA I-68 – East of Old Morgantown Road to West of Shade Hollow Road I-68 – East of Old Morgantown Road to West of Shade Hollow Road Cost Code: D Cost Code: D $1,000,001 to $2,500,000 $1,000,001 to $2,500,000 Ad Date: 12/2/14 Ad Date: 12/2/14 Bid Opening: 1/8/15 Bid Opening: 1/8/15 Est. NTP: 3/16/15 Est. NTP: 3/16/15

Sidewalks XX Sidewalks at Various Locations District 6 Sidewalks at Various Locations District 6 Cost Code: E Cost Code: E $2,500,001 to $5,000,000 $2,500,001 to $5,000,000 Ad Date: 12/16/14 Ad Date: 12/16/14 Bid Opening: 1/22/15 Bid Opening: 1/22/15 Est. NTP: 3/30/15 Est. NTP: 3/30/15

Landscaping AT Tree Planting at Various Locations in Washington County Tree Planting at Various Locations in Washington County Cost Code: D Cost Code: D $1,000,001 to $2,500,000 $1,000,001 to $2,500,000 Ad Date: 11/25/14 Ad Date: 11/25/14 Bid Opening: 11/25/14 Bid Opening: 11/25/14 Est. NTP: 11/25/14 Est. NTP: 11/25/14

Other Future Projects to Note WA251 I-68 Sideling Hill Bench Clearing I-68 Sideling Hill Bench Clearing Cost Code: D Cost Code: D $1,000,001 to $2,500,000 $1,000,001 to $2,500,000 Ad Date: Ad Date: Bid Opening: Bid Opening: Est. NTP: 2016 Est. NTP: 2016 WA344 I-81 over Potomac River, I-81 over MD 63/68, I-81 Widening I-81 over Potomac River, I-81 over MD 63/68, I-81 Widening Cost Code: I+ Cost Code: I+ $30,000,001 to $50,000,000+ $30,000,001 to $50,000,000+ Ad Date: Spring 2016 Ad Date: Spring 2016 Bid Opening: Bid Opening: Est. NTP: Fall 2016 Est. NTP: Fall 2016