Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer.

Similar presentations


Presentation on theme: "Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer."— Presentation transcript:

1 Commonwealth of Kentucky Transportation Cabinet Department of Highways - District 5 The Slow Uphill Climb Matt Bullock, P.E. Chief District Engineer

2

3

4

5

6 Highway Maintenance Work District 5 Signs Pothole Patching Lighting Mowing Guardrail Striping Drainage Signals Agreements with Local Agencies (Non-Interstate)

7 Panel Sign Installation Mowing Striping Lighting Guardrail Repair Street Sweeping Pothole Patching

8 Highway Construction Work District 5 2008 Recommended Highway Plan Formally - “Six Year Plan” Programs the funds for the next two years The “Biennium” Approximately $70 million Federal Stimulus -For Dist. 5 road projects Approximately $23 million Federal Stimulus - For projects in the KIPDA Planning area

9 Westport Road / Interchange Widen Westport between Hubbards Ln. and Watterson Full Interchange at the Watterson Single Point Urban Interchange (Bardstown Rd.) Hall Contracting Fall 2008 to May 2010 $47 Million

10

11

12

13

14 I-65 Major Rehab Complete removal of Concrete Sections Replace With Asphalt Traffic Control Contractor????? December 2009 Completion Approx. $30 Million Stimulus Funded

15

16 Cable Rail Installation Installation on KY 841 from I-65 to Dixie Highway I-65 in Bullitt, Hart, and Barren Counties Gibraltor System – (4 wires) RMD Holdings Fall 2009 Completion $3.1 Million

17

18 I-65 Patching & Diamond Grinding Patch Bad Concrete Areas from MP 118.5 to 127.5 Grind Surface Faulkner Construction Fall 2009 Completion $5.7 Million Stimulus Funded

19

20 I-64 Widening Widen I-64 between I-265 and Shelby Co. Line 3 Lanes in each direction – Barrier Median Gohmann Asphalt & Construction Fall 2010 Completion $34 Million

21

22

23 Eastern Parkway “Road Diet” and Pedestrian Safety Bridge over Floyd and Brook Streets Rehab Warnock Ramp Reconfiguration Over-Height Truck detection system MAC Construction (Low bid – not yet awarded) January 2010 Completion $7.1 Million

24

25

26

27 Preston Highway (KY61) 4-Lane Widening From Jefferson County Line to John Harper Highway One of Four Sections Stimulus Funded Flynn Brothers Contracting January 2010 Completion $6.2 Million

28

29

30 Shawnee Expressway Bridge I-264 West to I-64 West Bridge Mainly for Rehab Lane Configuration stays the same Faulkner Construction May 2010 Completion $5.6 Million

31

32 QUESTIONS? Matt.Bullock@ky.gov (502) 210-5400 Transportation.ky.gov