Hervé Lebbolo, François Rossel, Aurore Savoy-Navarro LPNHE-Universités de Paris 6&7 TOPICS: Main parameters of the Si-Envelope Front-End Issues: Long shaping.

Slides:



Advertisements
Similar presentations
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Advertisements

Aurore Savoy-Navarro LPNHE-Universités de Paris 6&7 SilC Collaboration R&D Advances since St Malo Si-Envelope design Mechanics Electronics Future Prospects.
Solid StateTracking R&D activities in Europe ALCPG 2004 Winter Workshop SLAC, January 7-10, 2004 World-Wide review of Linear Collider Tracking Aurore Savoy-Navarro,
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
SiLC Front-End Electronics LPNHE Paris March 15 th 2004.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
Understanding Data Acquisition System for N- XYTER.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
ECFA-DESY Extended Studies NIKHEF, Amsterdam 1st to 4th April, 2003 Tracking session 31st March 2003 SilC: an International R&D Collaboration to develop.
A Readout Electronics for MAPMT Matteo Turisini – E. Cisbani Italian National Institute of Health – INFN Rome 1 JLab/CLAS12 RICH Meeting - 16/Nov/2011.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
Fully depleted MAPS: Pegasus and MIMOSA 33 Maciej Kachel, Wojciech Duliński PICSEL group, IPHC Strasbourg 1 For low energy X-ray applications.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Self triggered readout of GEM in CBM J. Saini VECC, Kolkata.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
Hold signal Variable Gain Preamp. Variable Slow Shaper S&H Bipolar Fast Shaper 64Trigger outputs Gain correction (6 bits/channel) discriminator threshold.
GLD Intermediate tracker task list Configuration & software Silicon Sensor Electronics Support structure H.J.Kim, Kyungpook U. for intermediate tracker.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Joel Goldstein, RAL 4th ECFA/DESY LC Workshop, 1/4/ Vertex Readout Joel Goldstein PPd, RAL 4 th ECFA/DESY LC Workshop DAQ Session 1 st April 2003.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Progress Report since last ECFA-DESY, Prague Nov ’02 Aurore Savoy-Navarro, LPNHE-Universités de Paris 6/IN2P3-CNRS  Sensor & Electronics Test bench 
L.Royer– Calice LLR – Feb Laurent Royer, J. Bonnard, S. Manen, P. Gay LPC Clermont-Ferrand R&D pole MicRhAu dedicated to High.
SIAM M. Despeisse / 29 th January Toward a Gigatracker Front-end - Performance of the NINO LCO and HCO Matthieu Despeisse F. Osmic, S. Tiuraniemi,
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
Fermilab Silicon Strip Readout Chip for BTEV
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
Aurore Savoy-Navarro 1), Albert Comerma 2), E. Deumens 3), Thanh Hung Pham 1), Rachid Sefri 1) 1) LPNHE-Université Pierre et Marie Curie/IN2P3-CNRS, Fr.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
Front-end Electronic for the CALICE ECAL Physic Prototype Christophe de La Taille Julien Fleury Gisèle Martin-Chassard Front-end Electronic for the CALICE.
May 10-14, 2010CALOR2010, Beijing, China 1 Readout electronics of the ALICE photon spectrometer Zhongbao Yin *, Lijiao Liu, Hans Muller, Dieter Rohrich,
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Silicon Tracker Data Acquisition and Electronics for the Linear Collider Jean-Francois Genat LPNHE Universite Pierre et Marie Curie CNRS/IN2P3 On behalf.
The design of fast analog channels for the readout of strip detectors in the inner layers of the SuperB SVT 1 INFN Sezione di Pavia I Pavia, Italy.
KLOE II Inner Tracker FEE
D. Breton, S. Simion February 2012
Markus Friedl (HEPHY Vienna)
Electronics of the Silicon Envelope
Calorimeter Mu2e Development electronics Front-end Review
A micropower readout ASIC for pixelated liquid Ar TPCs
INFN Pavia and University of Bergamo
Application of VATAGP7 ASICs in the Silicon detectors for the central tracker (forward part) S. Khabarov, A. Makankin, N. Zamiatin, ,
The Silicon Drift Detector of the ALICE Experiment
DCH FEE 28 chs DCH prototype FEE &
Jean-Francois Genat LPNHE Universite Pierre et Marie Curie CNRS/IN2P3
Børge Svane Nielsen/JJG
Charge measurement of STK
SVT detector electronics
SVT detector electronics
Commissioning of the ALICE-PHOS trigger
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
The CMS Tracking Readout and Front End Driver Testing
Presented by T. Suomijärvi
SVT detector electronics
Presentation transcript:

Hervé Lebbolo, François Rossel, Aurore Savoy-Navarro LPNHE-Universités de Paris 6&7 TOPICS: Main parameters of the Si-Envelope Front-End Issues: Long shaping time Proposed F.E schema Digitization on detector F.E DAQ & Trigger: very preliminary ideas CERN, February 6th 2003

The Si-Envelope components: due to their location the functions of each piece of the Si-envelope may (slightly) differ SIT SET FTD Si-FCH

As in AMS Si-tracker, we propose to build long ladders made of N sensors bonded to each other F.E. electronics connector

The Si-envelope components in a few numbers: Si-envelope Component Items Total Number Si-FCH (XUV)Nb of layers Nb of ladders, 4 sensors Nb of ladders, 5 sensors Nb of ladders, 6 sensors Nb of RO channels/endcap Power dissipation 4 XU + 2 VV , Watts SETNb of layers Nb of ladders Nb of RO channels Power dissipation 2 1-sided sided ,293, Watts SITNb of layers Nb of ladders Nb of RO channels Power dissipation 2 2-sided = , Watts

Proposed Si-FCH DESIGN Modularity: ladders with 4,5or 6 sensors 4 Quadrants 4 XUV made of 6 2-sided sensors: 4 XU & 2 VV XUVVUXXUVVUX

The Front-End Electronics issues Starting point: the AMS electronics R.O. System Proposed Front-End design: the basics The Long shaping time Digitization on the detector F.E. ?

Starting point: the AMS Si-tracker Readout system (With particular thanks to G. Ambrosi, Ph. Azzarello, W.Lusterman and the ETH-Zurich, Geneva U.& Peruggia U. AMS teams for their support) Tracker Front-EndTracker Data Reduction Input Capa = 33 –72 pF VA_hdr/AMS64: 64 charge ampli+ CR-RC shaper+ S&H + 64 ch connected to voltage-current output buffer by analog mux  seq. up 10 MHz Measured ENC= (350+4/pFxC) electrons at 6 µsec peaking time 12 bit low power A/D (CLC949), as need: large dynamic range +/- 100 MIPs 5 MHz A/D coupled to DSP via FPGA (Xilinx XC4013)= buffer for up to 3 evts & sequencer for FE timing signals and synchro data transfer. 16 for calib and data compression

AMS2 : new improved Readout system New Front End: New hybrid: VA_hdr9a, 0.8µ Internally generated biases, internal calib capa Nominal gain 1.4 µA/fC Nominal peaking time 6 µsec ENC=(300 + Cdet x 5/pF)e-  Good gain stability & small pedestal spread New readout scheme: Simplified and HCC (Hybrid Control Circuit)  Minimize digital cable line  Control daisy chain of VA  Increase system reliability  Follows space rules By courtesy of G. Ambrosini

Currently building a 7-sensor ladder with AMS technique (i.e. using AMS sensors) and bonding them together thus variable length for test : L = N x 30 cm long This long ladder will be ready by Feb 20th equipped with FE electronics à la AMS (VA Preampli) or direct access at the µcrostrip output. Also starting simulation studies on new FE+RO possible designs (Ongoing similar studies at UC Santa Cruz, on a 2 m long ladder) Lab test Long ladder prototype Sensors: 70.0x40.1 mm2 300 µm depth 110µm/208µm RO pitch p(junction side) n(ohmic side)

Proposed F.E. Readout chain: very preliminary ideas 512 channels/ladder 2560 channels/drawer A/D=0.35µtechno, 8 bits 1MHz clock, 1.2mW

What infos do we need from the Si-tracker? 1) Detector occupancy? Will be different according to the detector location SET: preliminary studies  occupancy  1 % SIT, FTD or Si-FCH should have higher occupancies (higher backgrounds)  SPARSIFICATION on detector F.E. ? 2) Double & Multiple hit rates ? Thus ambiguities must be estimated 3) Pulseheight info (Q) needed? Yes if cluster centroid (  8 bit A/D ?) 4) Timing information ? R.O both ends of the long ladder? 5) Pedestal substraction on board? 6) DSP-like processing for eventual cluster algorithm and eventual fastrack processing algorithm at what level in the electronic chain ??? 7) Power dissipation studies: preliminary results  don’t seem to be a major issue (more detailed ongoing studies) All these issues must be studied with electronics and physics &/or detector performance simulations and tests on the test bench (just starting...)

Output of the signals: very preliminary proposal

DAQ & intermediate ‘trigger’: very preliminary ideas Based on the current experience with the trigger system related to the tracking system in CDF, we are foreseeing to study a Fastrack ‘trigger’ (or realtime processing) system that could be used to 1) Do a fast clustering and determine in realtime the cluster centroid 2) Do a fast tracking for stiff tracks (above 1 or 1.5 GeV/c momentum) with the overall Si tracking information, i.e. starting with the SIT + SET and then linking to the µvertex informations And similarly in the forward region, perform a track segment reconstruction in FTD and Si-FCH, separately and possibly link them.

Concluding remarks Our main efforts are currently focusing on developing the Lab test bench including the construction of a long ladder prototype with variable length and different possible Front-Ends The starting scheme = AMS FE and RO system Also looking for compatibility with the general RO & DAQ frame of the LC experiment In parallel, both electronics and physics + detector performances simulation studies are/will be undergoing for studying new FE and RO schemes and algorithms to eventually include in the RO chain for more sophisticated realtime processing of data (cluster centroid, fast tracking etc…). Use of present CDF experience and ongoing LHC developments. More to come in the next months (PRC submission )