Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN EPICS collaboration meeting 2004 Dec 8 - 10, 2004 RICOTTI,

Slides:



Advertisements
Similar presentations
RTEMS and Linux at the Canadian Light Source Tony Wilson Canadian Light Source University of Saskatchewan.
Advertisements

01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Sistemi Elettronici Programmabili13-1 MULTI OSC + CLOCK FILTER LVD POWER SUPPLY CONTROL 8 BIT CORE ALU PROGRAM MEMORY RAM I2CI2C PORT A SPI PORT B 16-BIT.
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
EPICS Collaboration Meeting, Hsinchu, Taiwan, June, 2011 NSLS-II Power Supply Control System Yuke Tian Accelerator Division Photon Science Directory Brookhaven.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
IO Controller Module Arbitrates IO from the CCP Physically separable from CCP –Can be used as independent data logger or used in future projects. Implemented.
Ionization Profile Monitor Project Current Status of IPM Buffer Board Project 10 February 2006 Rick Kwarciany.
Kabuki 2800 “a real-time digital audio effects system for performance” team “Big Country” presents ECEN4610 Preliminary Design Review 14 September 2006.
ICS – Software Engineering Group 1 SNS Power Supply Control Sheng Peng.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Stability Workshop April , 2007 NSLS-II Electrical Systems G. Ganetis NSLS-II Electrical Systems NSLS-II.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy P0 Feedback Project: Merging EPICS with FPGA’s Nicholas.
Engineering 1040: Mechanisms & Electric Circuits Fall 2011 Introduction to Embedded Systems.
David MacNair POWER SUPPLY 3/30/20061 Ethernet Power Supply Controller.
18. June 2003EPICS WS Control of Digital Power Supplies Andreas Lüdeke Swiss Light Source / PSI 20 May 2003 EPICS Collaboration Meeting.
SPEAR 3 Upgrade SSRL/SLAC January 2001  Computer Control System  Beam Monitoring and Feedback Systems  Timing System  Machine Protection Systems 
Power Supply Controller Architecture
September 22, 2005 ESF Workshop-Perugia 1 Virgo Control Electronic upgrade Annecy/Pisa/EGO B.Mours.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
APS BPM and power supply applications on micro-IOCs W. Eric Norum
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN The status of PLS EPICS application EPICS collaboration.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
Font 4 Review Digital Feedback System BPM Analogue Processor Digital Processor Feather Kicker Power Amplifier Pick up StriplinesKicker StriplinesBeam.
1 PEFP status Jihwa Kim PAL, KOREA EPICS Collaboration meeting Dec 8-10, 2004 RICOTTI,Tokai, JAPAN Pohang Accelerator Laboratory POSTECH Bird’s eye View.
Booster Cogging Upgrades Craig Drennan, Kiyomi Seiya, Alex Waller.
Dec 8-10, 2004EPICS Collaboration Meeting – Tokai, Japan MicroIOC: A Simple Robust Platform for Integrating Devices Mark Pleško
VIRGO Control System Upgrade: Multi-DSP Board Alberto Gennai INFN Pisa LIGO-G Z.
NEDA collaboration meeting at IFIC Valencia, 3rd-5th November 2010 M. Tripon EXOGAM2 project Digital instrumentation of the EXOGAM detector EXOGAM2 - Overview.
Understanding Data Acquisition System for N- XYTER.
Power Supply Control at NSLS-II Yuke Tian Control Group, NSLS-II, BNL (May 1, 2009 EPICS Collaboration Meeting, Vancouver)
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
Micro-Research Finland Oy Timing System Modules Jukka Pietarinen EPICS Collaboration Meeting, Argonne, June 2006.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Tomasz Czarski, Maciej Linczuk, Institute of Electronic Systems, WUT, Warsaw LLRF ATCA.
September 19-20, 2007 A.Zaltsman EBIS RF Systems RF System Overview Alex Zaltsman September 19-20, 2007 DOE Annual Review.
1 Timo Korhonen PSI 1. Concepts revisited…again 3. New (Diamond) cards features and status 4. EPICS interface 5. Conclusions SLS & Diamond Timing System.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
28/03/2003Julie PRAST, LAPP CNRS, FRANCE 1 The ATLAS Liquid Argon Calorimeters ReadOut Drivers A 600 MHz TMS320C6414 DSPs based design.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 EPICS IOC Embedded on PLC for TPS Pulse Magnet Power Supply Control Chun-Yi Wu TPS Control.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
Alexei SemenovGeneric Digitizer Generic Digitizer 10MHZ 16 bit 6U VME Board.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
PSI Power Supply Controls MedAustron Controls Workshop 1 PR a-FMO-PSI_Power_Supply_Controls.pptx F. Moser - PSI Power Supply Controls 1.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
Embedded Control Systems Dr. Bonnie Heck School of ECE Georgia Tech.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
BPM stripline acquisition in CLEX Sébastien Vilalte.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Timing Board FPGA. Use existing IP version until firmware is ported to new FPGA FPGA Existing IP Carrier UCD Digital I/O TSG Timing Board.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Digital RF control at LBNL Gang Huang on behalf of the LBNL LLRF team LLRF2015.
Magnet Low Current PS Upgrade Kristi Luchini,Sandeep Babel, Till Straumann, Mitch D’Ewart, Briant Lam, Dave MacNair May 19, 2016 VME to Emedded Industrial.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Beam Wire Scanner (BWS) serial link requirements and architecture
The SLAC Instrumentation and Control Platform
Iwaki System Readout Board User’s Guide
Snr Power Supply Engineer
P. Forck, P. Kowina, M. Schwickert, R. Singh
Electronics requirements for special diagnostics for the XFEL
Introduction to Microprocessors and Microcontrollers
Trent Allison Ops StayTreat 2015
Power Supply Control for BEPCII
LIU BWS Firmware status
Presentation transcript:

Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN EPICS collaboration meeting 2004 Dec , 2004 RICOTTI, Tokai, JAPAN Pohang Accelerator Laboratory Kiman Ha, M.Y.Oh, J.H Kim, J.M Kim and J.H Choi PLS Power Supply control and upgrade plan

Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN Outline -Status of orbit feedback -Present status of power supply control -Digital power supply upgrade plan -Hardware review and test result -Summary

Pohang Accelerator Laboratory POSTECH Orbit feedback status EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN -Orbit feedback operation started for user service in November -Orbit stability with feedback(RMS) - short term (1 hour) : < 1  m - long term (12 hours) : < 3  m -Both V and H corrector PS’s are involved for feedback

Pohang Accelerator Laboratory POSTECH Present PS upgrade status -Upgrade status.Kept vertical Orbit Stability less then 3  m by feedback operation.Replaced 22 sets of Corrector PS and their Control system in September -EPICS Control and embedded controller.Collaboration with BESSY-II (Ralph, Ingo) and Kristi(SLAC).Same as BESSY-II, 24Bit DAC Controller.CANbus field bus with EPICS IOC.Event System for PS time synchronization EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN

Pohang Accelerator Laboratory POSTECH Next plan of power supply upgrade EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN -Requirements of corrector PS.Fast Corrector control system(>1kHz).Vertical PS need 20bit of step resolution.Horizontal PS need 16bit step resolution -2005, will replace all vertical PS. 2ppm step resolution. +/-10ppm long term stability -Feed-forward for ID gap changed.Install steering magnet.+/-5A 16bit 1kHz bandwidth PS

Pohang Accelerator Laboratory POSTECH Fast Control System requirement EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN -PS : >1kHz BW, > 18bit output resolution - 1 to 5kHz set point -Event system synchronization >BPM measurement >PS control trigger -Fast beam position and feedback algorithm processing

Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN Background of Digital PS development - Implementation of modern power converter technology.Resent DSP&FPGA show very powerful performance - Requirements of beam physicists for orbit stabilization.Slow, fast, and epics based robust control system -High speed control applications: >4kHz - High output resolutions: >18bit - Low cost and small number of hardware components.Reduce error source.Easy maintenance

Pohang Accelerator Laboratory POSTECH Digital Controller Advantage EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN -Modern digital technology(DSP, FPGA,ADC) -Cost effective and precise power supply -High flexibility and modularity -High functionality -Built in all functions for PS.Current regulator(PI, feed forwarder).Direct PWM generation.Fast control port.Analog, Digital I/O

Pohang Accelerator Laboratory POSTECH EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN Analog- Digital- Converter 8 Analog Input 2 Analog Output DSP-controller incl. FPGA 16 Bit Digital Out 8 bit Digital Input 1 RS232 1 Fiber optics Digital Control Unit

Pohang Accelerator Laboratory POSTECH Block diagram of Controller Card without software functions EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN From PSI Lukas Security controller (Watchdog) 24 V 5 V BUS SHARC DSP ADSP-21065L SRAM 2 MBit FLASH EPROM 8 MBit Flags, IRQs, Reset EPROM FPGA CLOCK 60/30/20MHz Control-IO serial link RS 232 Power Inverter Section Analog & Digital Signal Feedback PWM PWM signal PWM synchronisation SoC / SPARE / ADC clock (200 kHz) Service PC SPORT 1 (serial port) SPORT 0 (serial port) Power Monitor Reset PWM generator IO- controller ADC/DAC Card Trigger /Reset /Interrupt Backplane D SUB 15 Control System (EPICS) optic FPGA fast optical input for Trigger /Reset /Interrupt DC other DSP Controller Cards Analog Sig. JTAG digital Input / Output optic Timer

Pohang Accelerator Laboratory POSTECH Prototype of Digital PS for PLS EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN Filter IGBT driver DCCT Power Stack DSP RS232 ADC Optical fiber for EPICS interface.+/-100A.DC 30V

Pohang Accelerator Laboratory POSTECH IOC control test EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN Fiber optics VIPC664 TM Digital PS IOC Test panel

Pohang Accelerator Laboratory POSTECH IOC and PS configuration EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN VME CPU Carrier moduleTM module PS IP-A IP-B IP-C IP-D Optical fiber link MVME5110 VIPC664-TM Event trigger CH1 CH2 PS PS 1 PS 8 PS 2 EVR

Pohang Accelerator Laboratory POSTECH Control hardware components EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN VIPC664-TM IP2 TM

Pohang Accelerator Laboratory POSTECH Step response test EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN 55.0A A Step 100uA step(1ppm) full range V*10 is Amps

Pohang Accelerator Laboratory POSTECH Summary - The PLS orbit feedback operation is based on EPICS control system. -CANbus IOC and control are working well without any problem -Satisfactory result of prototype Digital controlled PS -Next Digital PS will be operated for orbit feedback -This high performance PS technology will be helpful for our new project, 4 th generation PAL-XFEL EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN

Pohang Accelerator Laboratory POSTECH Overview EPICS Collaboration Meeting RICOTTI, Tokai, JAPAN PLS(Pohang Light Source) has successfully upgraded storage ring straight section 20bit power supplies and control system for global orbit feedback operation in collaboration with BESY-II. Now we are looking for EPICS based fast control system and cost effective precise digital controlled power supply in collaboration with PSI and DIAMOND. I will present the current status of PLS global orbit feedback system, and experimental results of 1ppm resolution digital controlled power supply for the next upgrade of PLS.